Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | L1 | Accepted-AOC Lowest Quoted | |
| 2 | Rejected-Technical A 8 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110044 | - | Rejected-Technical Refer Tech Evolution Summary Report | |
| 3 | Rejected-Technical | - | Rejected-Technical Refer Tech Evolution Summary Report | |
| 4 | Rejected-Technical | - | Rejected-Technical Refer Tech Evolution Summary Report |
Tender Value
Refer Docs
Closing Date
20 Oct 2021, 5:00 pmClosed
Dr. Rohit Tamrakar and Dr. Sumit Khare
Asstt. Professors, Department of Mechanical Engineering, SVNIT, Surat
As per Notice Inviting Tender
2021_SVNIT_650272_1
SVNIT-CPP-55/CS_21/DME_5/21-22
Open Tender
Computer- H/W
Supply
90 days
Department of Mechanical Engineering, SVNIT
As per Notice Inviting Tender
8 documents required · 8 mandatory
₹0
Exempted
15 Feb 2022
27 Sept 2021
21 Oct 2021
28 Sept 2021
20 Oct 2021
28 Sept 2021
Supply, Installation, Commissioning and Training of Customized Vibration Analysis Equipment and allied Accessories (6 Items) as follows: (Detailed technical specifications of the items as per chapter – 8 enclosed)
5 channel sound and vibration analyzer Data acquisition system (DAQ) with Sound and Vibration Analyzer software
Accelerometer compatible with Data acquisition system (DAQ)
Accelerometer with Force output compatible with Data acquisition system (DAQ)
Shaker and Amplifier with Signal generator compatible with Data acquisition system (DAQ)
Modal Analysis Software compatible with Data acquisition system (DAQ)
Impact Hamme compatible with Data acquisition system (DAQ) Note : 1. Make/Model of all items should be clearly mentioned in your bid. 2. Latest & Valid Authorization Certificate from Original Equipment Manufacturer should be enclosed along with your offer. 3 . The Overall lowest and technically qualified bid will only be consider for placement of purchase order. 4. In the event of purchase order, training should be imparted to two officials of the institute for three days at purchaser's site. 5. In the event of a work-order, Performance Security @ 3% of the work order value is to be submitted.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .