Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74,972.78Admitted-Finance | -23.99% | ₹74,972.78 | L1 | Admitted-Finance |
| 2 | L2₹83,840.11Admitted-Finance | -15.00% | ₹83,840.11 | L2 | Admitted-Finance |
Tender Value
₹1.0 L
EMD Value
₹2,020
Closing Date
6 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
Please refer BOQ
2026_RDPR_306960_3
e-NIT No. 365 REW Rajouri of 2025 Dated 30-03-2026
Open Tender
Civil Works
30 days
RAJOURI
Please refer Tender Documents
2 documents required · 2 mandatory
₹500
CD Acc. No. 0020010200000890
₹2,020
Yes
17 Apr 2026
30 Mar 2026
7 Apr 2026
30 Mar 2026
6 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in Trench excavation manual means in exceeding 10sqm on plan, in AKS | |||||
| 2Providing and laying in position cement of M10 grade with 30% boulders including curing but excludinf the cost of centering and shuttring all work upto plainth level. (Boulders) | |||||
| 3Providing and laying in position cement of M10 grade with 30% boulders including curing but excludinf the cost of centering and shuttring all work upto plainth level. | |||||
| 4Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | |||||
| 5Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.50 mm thick with zinc coating not less than 275 gram/m2 | |||||
| 6Material Consumptions and Carriages, Carriage of Sand /Aggragates | |||||
| 7Carriages of Stone | |||||
| 8Add Cost Of CIB | |||||
stage.html
html • 0.03 MB
techsummary_996240.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_996240.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid