| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Finance | -30.33% | ₹13.9 L | L1 | Admitted-Finance |
| 2 | L2₹14 L+₹6,600 (0.47%)Admitted-Finance | -30.00% | ₹14 L+₹6,600 (0.47%) | L2 | Admitted-Finance |
| 3 | L3₹15.4 L+₹1.5 L (10.8%)Admitted-Finance | -22.79% | ₹15.4 L+₹1.5 L (10.8%) | L3 | Admitted-Finance |
| 4 | L4₹15.8 L+₹1.9 L (13.4%)Admitted-Finance | -21.00% | ₹15.8 L+₹1.9 L (13.4%) | L4 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
4 Jun 2026, 6:00 pmClosed
XEN CMD SVP
Kangan
Construction of retaining wall along with drain around back side of switchyard generator room and hut at MHP Pahalgam.
2026_SPDC_309837_4
CMD SVP K 04 of 2026
Open Tender
Civil Works
Percentage
75 days
Pahalgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹710
CPAO PDC Srinagar
₹40,000
Divisional office
8 Jun 2026
13 May 2026
6 Jun 2026
14 May 2026
4 Jun 2026
14 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 49.5 | Cum | 940.3 | ₹46,544.85 |
| 2 | Providing and laying cement concrete in retaining Cum walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets, sunken floor etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 121.59 | Cum | 8,422.45 | ₹10,24,118.54 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string courses fillets, kerbs and steps etc. | 185.3 | Sqm | 628.95 | ₹1,16,544.44 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth Thermo-Mechanically Treated bars of grade Fe-500D or more. | 4,464 | Kg | 111.1 | ₹4,95,950.4 |
| 5 | UPVC pipes (working pressure 4 kg/cm2) Single socketed pipe metre | 40 | Metre | 225 | ₹9,000 |
| 6 | Banking excavated earth in layers not exceeding Cum 350 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc.. lead upto 50 m and lift upto 1.5 m in All kinds of soil: | 350 | Cum | 467.3 | ₹1,63,555 |
| 7Carriage of materials: | |||||
| 7.1 | Cement avg 20 km | 39.86 | MT | 434.6 | ₹17,323.16 |
| 7.2 | Sand average 50 km | 53.15 | Cum | 868.39 | ₹46,154.93 |
| 7.3 | Aggregate average 40km | 106.31 | Cum | 741.89 | ₹78,870.33 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.33 MB
BOQ_1002756.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .