Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | ₹1.1 L | L1 | Accepted-AOC ORDER No.D1-3243-5/AM/2025 Dated 13-02-2026 Assistant executive engineer MiI Sub division Kalpetta |
| Sl No | Description | Qty | Unit | GEORGE K V L1 |
|---|---|---|---|---|
| 1.00Annual maintenance | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 65.6 | cum | 230 ₹15,088 Lowest |
| 1.00 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 97.8 | sqm | 239 ₹23,374.2 Lowest |
| 1.00 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 47.5 | sqm | 361 ₹17,147.5 Lowest |
| 1.00 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes | 280.8 | kg | 200 ₹56,160 Lowest |
| 1.00 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 15.7 | kilogram | 108 ₹1,695.6 Lowest |
Tender Value
₹1.1 L
EMD Value
₹2,700
Closing Date
28 Oct 2025, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer MI Sub division kalpetta
Civil works
2025_Irrig_752842_4
IRR/IA/5182/2024-2025
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
365 days
Kottathara
Please refer Tender documents.
12 documents required · 12 mandatory
₹555
Yes
₹2,700
Yes
19 Sept 2026
21 Oct 2025
30 Oct 2025
21 Oct 2025
28 Oct 2025
21 Oct 2025
Amount
Annual maintenance
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Bidder Name
GEORGE K V
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1357936.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
NIT.pdf
Tender Documents • 1.79 MB
BOQ_1357936.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .