Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.5 L+₹2,261.73 (0.30%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.8 L+₹34,847.57 (4.65%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹8.0 L+₹54,950.88 (7.34%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | s.jayakumar L1 | Nandi Builders & Developers L4 | NAZARUDEEN L3 | AJITH KUMAR T L2 |
|---|---|---|---|---|---|---|---|
| 1.00puthoorkonam kulam | |||||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 75.4 | cum | 2,333.44 ₹1,75,941.38 | 2,300 ₹1,73,420 Lowest | 2,400 ₹1,80,960 | 2,338.64 ₹1,76,333.46 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 30.8 | cum | 330.21 ₹10,170.47 Lowest | 350 ₹10,780 | 360 ₹11,088 | 330.95 ₹10,193.26 |
| 1.00 | OD182071/2026-2027:DR PACKING Under foundation - Dry stone packing under foundation with good quality
blasted rubble including conveyance of material and labour charges etc. complete as per
direction of departmental officers at site. ( Derived from DAR 60.7.2) | 30.8 | cum | 2,081.06 ₹64,096.65 Lowest | 2,500 ₹77,000 | 2,200 ₹67,760 | 2,085.7 ₹64,239.56 |
| 1.00 | OD182070/2026-2027:Dry rubble masonry (without concrete levelling course) WITH DEPARTMENTAL RUBBLE
(without bond stone), and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 52.78 | cum | 2,601.67 ₹1,37,316.14 Lowest | 2,700 ₹1,42,506 | 2,800 ₹1,47,784 | 2,607.46 ₹1,37,621.74 |
| 1.00 | OD188958/2026-2027:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble
(without bond stone), and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 43.22 | cum | 4,017.58 ₹1,73,639.81 Lowest | 4,500 ₹1,94,490 | 4,200 ₹1,81,524 | 4,026.53 ₹1,74,026.63 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 10.12 | sqm | 354.48 ₹3,587.34 Lowest | 360 ₹3,643.2 | 360 ₹3,643.2 | 355.27 ₹3,595.33 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 7.99 | hour | 317.19 ₹2,534.35 Lowest | 345 ₹2,756.55 | 340 ₹2,716.6 | 317.9 ₹2,540.02 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.1 | cum | 8,478.22 ₹9,326.04 Lowest | 9,000 ₹9,900 | 9,000 ₹9,900 | 8,497.1 ₹9,346.81 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.96 | cum | 9,146.44 ₹36,219.9 | 9,500 ₹37,620 | 9,000 ₹35,640 Lowest | 9,166.82 ₹36,300.61 |
Tender Value
₹8.3 L
EMD Value
₹20,868
Closing Date
24 Sept 2026, 9:00 amClosed
Assistant EngineerMudakkal Grama Panchayath
Assistant EngineerMudakkal Grama Panchayath
Annual Plan-Mudakkal GP Protection of Puthoorkonam pond -Prj 273/26-27-General Civil Work
2026_LSGD_870145_1
22/AE/SEP/26
Open Tender
Civil Works - Buildings
Item Rate
60 days
Mudakkal GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,845
₹20,868
25 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
16 Sept 2026 - 24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1puthoorkonam kulam | |||||
| 1.001 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 75.4 | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 30.8 | cum | - | - |
| 1.003 | OD182071/2026-2027:DR PACKING Under foundation - Dry stone packing under foundation with good quality
blasted rubble including conveyance of material and labour charges etc. complete as per
direction of departmental officers at site. ( Derived from DAR 60.7.2) | 30.8 | cum | - | - |
| 1.004 | OD182070/2026-2027:Dry rubble masonry (without concrete levelling course) WITH DEPARTMENTAL RUBBLE
(without bond stone), and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 52.78 | cum | - | - |
| 1.005 | OD188958/2026-2027:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble
(without bond stone), and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 43.22 | cum | - | - |
| 1.006 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 10.12 | sqm | - | - |
| 1.007 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 7.99 | hour | - | - |
| 1.008 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.1 | cum | - | - |
| 1.009 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.96 | cum | - | - |
stage.html
html • 0.02 MB
finance_1474287.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
prilim.pdf
Tender Documents • 0.25 MB
feeremi.pdf
Other Document • 0.34 MB
afi.pdf
Other Document • 0.24 MB
integrity.pdf
Other Document • 0.23 MB
epay.pdf
Additional Documents • 0.23 MB
BOQ_1474287.xls
BOQ • 0.31 MB
fot.pdf
Additional Documents • 0.25 MB
viewsbd.pdf
Other Document • 2.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .