Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 CrAdmitted-Finance | ₹10.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.0 CrAdmitted-Finance LANE NO 3 UMERABAD NEAR CITY HOSPITAL BATHINDI JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | ₹11.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹12.3 CrAdmitted-Finance | ₹12.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Mahir Construction Company L2 | Messrs Tama Fabrication Works L3 | AMARDEEP CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00Part-A : “DESIGN AND CONSTRUCTION OF 80 M SINGLE SPAN MAJ PMT BRIDGE INCLUDING PROOF CHECKING FROM IIT WITH STEEL SUPERSTRUCTURE (THROUGH TYPE) AND RCC DECKING ON OPEN FOUNDATION OVER SINGARH NALLAH (SINGARH BRIDGE) AT KM 4.089 ON GALHAR-SANSARI ROAD UNDER 118 RCC/35 BRTF OF PROJECT SAMPARK IN J&K (UT) (2nd Call)” | ||||||
| 1.01 | Design and Construction of 80 mtr single span Maj Pmt bridge including SSI and Proof checking from IIT with Steel Superstructure (through type) & RCC decking on open foundation over Singarh Nallah (Singarh Bridge) at km 4.089 Galhar-Sansari road span arrangement as per NIT drawing and based on hydraulic data, sub soil data, ground data, special conditions, particular specifications of the tender documents including proof checking of drawings by IIT as directed by the Department, Plate load test of foundation, load testing of superstructure as specified, all preparatory works, foundations, abutments, piers, return walls, POT & POT cum PTFE bearings including design, launching/erection of staging works as required, Decking, Wearing coat having non skid surface, strip seal expansion joints, Steel Railings, Kerbs, RCC crash barrier, Guard Posts, drainage arrangement over carriage way and footpath,service arrangement for utilities, painting with non-corrosive paint to all exposed steel works, protective works, temporary river training works, diversions, back filling with selected material and all other itmes of works required and necessary for complete construction of bridge including curing and RCC approach slab 3.50 M on both sides | 80 | Mtr | 13,72,500 ₹11.0 Cr | 15,31,250 ₹12.3 Cr | 13,50,000 ₹10.8 Cr |
Tender Value
₹8.5 Cr
EMD Value
₹7.5 L
Closing Date
9 Oct 2023, 12:00 pmClosed
Chief Enginner Project Sampark
HQ Chief Engineer Project Sampark Near peer baba Kunjwani Chowk , JAMMU
DESIGN AND CONSTRUCTION OF 80 M SINGLE SPAN MAJ PMT BRIDGE INCLUDING PROOF CHECKING FROM IIT WITH STEEL SUPERSTRUCTURE (THROUGH TYPE) AND RCC DECKING ON OPEN FDN OVER SINGARH NALLAH AT KM 4.089 ON GALHAR-SANSARI RD 118 RCC/35 BRTF OF PROJECT SAMPARK
2023_BRO_618043_1
CE(P) SPK/06/2023-24
Open Tender
Civil Works
731 days
SINGARH NALLAH AT KM 4.089 ON GALHAR-SANSARI RD
As per tender Docs
9 documents required · 9 mandatory
₹0
₹7.5 L
Yes
HQ Chief Engineer Project Sampark
1 Nov 2023
9 Sept 2023
10 Oct 2023
9 Sept 2023
9 Oct 2023
15 Sept 2023
11 Sept 2023 - 13 Sept 2023
14 Sept 2023
Amount
Part-A : “DESIGN AND CONSTRUCTION OF 80 M SINGLE SPAN MAJ PMT BRIDGE INCLUDING PROOF CHECKING FROM IIT WITH STEEL SUPERSTRUCTURE (THROUGH TYPE) AND RCC DECKING ON OPEN FOUNDATION OVER SINGARH NALLAH (SINGARH BRIDGE) AT KM 4.089 ON GALHAR-SANSARI ROAD UNDER 118 RCC/35 BRTF OF PROJECT SAMPARK IN J&K (UT) (2nd Call)”
M/s Mahir Construction Company
Messrs Tama Fabrication Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TenderSingarhNallah.pdf
Tender Documents • 1.62 MB
BOQ_692014.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid