1. All the consumables required for executing the jobs mentioned in the scope of work including various
tools, PPE (Boiler Suit any colour except Blue and Red) etc. come in vendor’s scope.
2. Vendor shall ensure that all the electrical equipment used are FLP In nature further any tools used
shall be NON-SPARKING type only. Under no circumstances Non FLP equipment/ Equipment with
exposed wires/ Non FLP JBs shall be allowed inside the depot for use.
3. Proper Double pole Scaffolding is to be used for work at height and applicable work at height permit
needs to be taken before the job.
4. Utmost care to be taken while excavation for buried cables.
5. The work involves working in licensed premises and at heights hence worker shall ensure to take all
safety precautions as prescribed by the engineering. Safety of the contract workman shall be the
responsibility of contractor. All applicable safety norms of the corporation shall be complied with.
6. Work permits have to be taken for each job. Daily renewal of the same shall be done. Work permits
shall be issued for normal working hours i.e. from 08:30 hours to 17:00 hours. Any extension of timing
shall be job specific and separately taken.
7. Housekeeping in the workplace shall be of highest standards. Used materials shall not be allowed to
accumulate/lie around the workplace.
8. Used Welding rods should not be left at the site and should be disposed properly at the end of each
9. Wrapping, coating material should also be collected and placed properly instead of lying here and
10. FLP integrity of Cables /Equipment used for cleaning equipment/ hydro jet / air blower/ any similar
electrical equipment shall be ensured by Vendor.
11. The contractor has to communicate / give safety talks before start of job, detailing the work involved.
Dos and Don’ts of the work assigned, safety working procedures, actions in emergency etc.
12. Contractor shall abide by all the directives related to jobs undertaken issued by BPCL officer in charge
13. The work involves working in a running installation hence party shall visit the site before quoting and
shall satisfy himself with work quantum and safety requirements.
14. Match box, lighters, mobile phones, flash cameras, gutkha etc. are not allowed inside the installation
15. No work will be allowed while rake is standing inside the depot premises as the work site is railway
16. All the contract workmen engaged shall wear the personal protective equipment e.g., safety belt,
safety shoe, photo identity passes, uniform etc.
17. All workers shall have undergone medical health checkup carried out not less than 6 months from job
starting date in line to factory rules and shall possess health card, valid ID card, Police verifications.
18. The Vendor shall be fully responsible for the verification of credentials and the reliability of everyone
deployed by it in BPCL premises.
19. Vendor needs to submit undertaking form for the workers as per the format provide the M/s BPCL
before deploying them for work.
20. The contractor shall hold the company harmless and indemnified from and against all claims, costs
and charges for which the company shall be liable under the Workmen's Compensation Act, 1923, and
latest amendments therefore, both in respect of personal injuries (within the meaning of the said Act)
caused to the labor of the contractor, or of the sub-contractor, if any, arising out of or occasioned
during the currency of this agreement through the acts or commission whether due to the negligence
of the contractor or sub-contractor. The contractor will also indemnify the company in respect of any
cost, charges or expenses arising out of claim or proceeding and in respect of any award or
compensation of damages arising thereof.
21. In case the contractor fails to perform the job, the Corporation reserves the right to make alternate
arrangements to perform the same and the loss/damage incurred if any by the Corporation on
account of the same shall be deducted from the amount payable to Contractor by the Corporation
22. BPCL will provide only water and electricity. All other material, consumables, non- consumables,
equipment, scaffolding, transportation requirements etc. required for completion of the job will be
under the scope of the contractor.
23. The contractor shall in all respects comply with all statutory requirements/provisions as applicable
under labor act 1970, payment of wages act, gratuity act minimum wages act, PF act ESI act etc. and
will be solely responsible for all claims and responsibilities arising out of any dispute their under.
Further the contractor shall always keep BPCL indemnified against any liability under the provision of
the carious statutory acts. BPCL shall not be responsible for any complaints from statutory authority.
24. Corporation reserves right to deduct penalty/deductions from the presented bills for bad performance
or non-execution or delay in execution of jobs as per scope of work.
25. Cost incurred on account of Police verification/ ID card / uniform / safety shoes / helmet / PPE /
Insurance is under vendor’s scope. No amount will be reimbursed by the corporation for the same.
26. Workmen are required to follow proper discipline inside depot premises which includes proper
Uniform, PPEs, ID cards failing which entry into depot premises will be restricted
27. Payment shall be released after successful completion of Work. Running Bill may be executed after
successful completion of one area
28. General working time in Depot is from 0830 hrs. to 1700 hrs. No additional payment outside tender
will be done for job done on holidays/ Sundays, extended hours working.
29. Contract will remain valid for the period of ONE year with the provision of extension for one more
year if required.
30. It will be the responsibility of the contractor to depute adequate manpower/ supervisor/ tools and
trolley/vehicle for getting the job done in time.
31. The cost incurred for shifting of material is purely under vendor’s scope. No additional payment will be
done for shifting of the material.
32. Contract will be terminated with one month notice in advance if services/ attendance of contractor
workmen is found to be unsatisfactory or contractor is found to be not maintaining statutory
requirement as per governments various laws as applicable in respect of PF, ESI etc., or not following
Depot’s safety and security norms.
33. The contractor will have to abide by all statutory provisions under contract such as labor act
payment of wages act, gratuity act minimum wages act, PF act ESI act and will be solely responsible for
all claims and responsibilities arising out of any dispute there under.
34. In addition to standard agreement the party will have to sign an indemnity bond/ undertaking on Rs.
100/- stamp paper as per out draft format available with corporation for perusal for intending tenders.
35. The job is purely contractual in nature and all the relevant labor laws are to be satisfied by contractor.
The payment would be done at the end of each month (once in month). In case of unsatisfactory
performance, the corporation reserves the right to terminate the contact at any time without
assigning any reasons.
36. No escalation in price will be entertained during the contract period
37. BPCL reserve the right to cancel the Tender/CRFQ/RFQ at any point of Time
38. EARNEST MONEY DEPOSIT:
(Applicable only for works costing Rs.50000/- and above in value. However, in case of parties
registered within the Corporation EMD may not be insisted upon).
In the case of open tenders, the tenderer shall be required to submit along with his quotation a Bank
Draft in favor of Bharat Petroleum Corporation Ltd. For a sum equivalent to 5% of the total tendered
value of works as earnest money deposit, subject to a maximum of Rs.25000/-.
Permissible forms of EMD are Bank Drafts drawn in favor of BPCL or Bank Guarantee executed by any
Scheduled Bank.
The earnest money deposit shall be returned to the unsuccessful tenderer/s within one month after
due date for opening of the tender. The Earnest money deposit of the successful tenderer will be
retained till the commencement of the work. Thereafter the tenderer may opt to adjust the earnest
money deposit against Bank Guarantee of equivalent amount. No interest will be payable on earnest
money deposit. EXECUTION OF AGREEMENT
39. PERFORMANCE BANK GUARANTEE:
(Applicable for works costing more than 10 lacs.)
In the case of any tender costing more than 10 lacs without GST/ applicable taxes, vendor has an
option to select between:
a. Submitting a Performance Bank Guarantee upfront for 10 % of total value of contract
b. or Submitting separate Bank Guarantees based on 10% of each Running Bill.
failing which the contract will stand cancelled.
I/we have carefully read the above terms and conditions of Tender and agree to abide by the same.
Signature of the Contractor/authorized representative
Name/Seal of the Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
9212.pdf
pdf • 0.14 MB
BUDGETDOC_9212.pdf
pdf • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .