Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
Upgradation of MOT at GH Mehsana and Semi MOT at SDH Kadi,SDH Visnagar and SDH Unjha in Dist: - Mehsana.
271762
2025-26/138/03
Open
Civil Works
Gandhinagar
1 document required · 1 mandatory
₹3,600
PIU-General Fund A/c 11-114
₹2.9 L
31 Jan 2026
31 Jan 2026
31 Jan 2026
12 Feb 2026
31 Jan 2026
Name of work :-
Upgradation of MOT at GH Mehsana and Semi MOT at SDH Kadi,SDH Visnagar & SDH Unjha in Dist: - Mehsana.
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of 50 mm thick Pre Fabricated Modular Operation Theater Panels
(Walls and Ceiling) made out Polyurethane foam injected at 40 Kg/m3 sandwiched between
0.8 mm thick GP and SP sheet on front side and 0.5 mm GP and SP/PPGI sheet on back-side. The inner surface walls be
fixed to the bricks wall with essential support. There will be minimum possible cavity/gap in between solid and steel
walls and will be variable to suit the architects lay out for the flush mounting of the equipments. The wall and ceiling
panels must comply with necessary provision of to JIS Z 2801/ISO 22196, BS EN 1363-1:2020, EN 1363-2:1999, EN
Rupees Six Thousand
Five Hundred Fifty Only
52210-2:1984-08, DIN 4102-1, Class A2. Any Third-party compliance certificate mandatory. Panel should be covered
with protective sheath of 300 d.f.t Anti-bacterial Paint having undergone Washability/Water resistance Test JIS K
5663.7.12, permeability test less than 200 unit of permeability, Anti-bacterial effect against staphyloccoccus aureus,
Escherichia coli (via HALO test) and safety and causative agents such as formaldehyde, toluene, xylene,
paradichlorobenzene etc. Third party (NABL approved Lab) certification for EGP and thickness test certificate to be
Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The ceiling filtration system in the
surgical theatre should ensure a unidirectional distribution of sterile air, covering all areas affected by the airflow. It
should consist of a laminar flow system incorporated within a frame made from thick extruded aluminum profiles,
complete with a sealed gasket to prevent leaks. The system should incorporate "H 14" class HEPA filters positioned in
the ceiling plenum. These filters should achieve an MPPS average efficiency greater than 99.95% and a 3-micron DOP
efficiency greater than 99.99%. The filters should also be designed to handle a final pressure drop of no more than
Pa, operate at a maximum temperature of 60 degrees Celsius, and function effectively within a relative humidity range
of 40-50%. The filtration ceiling system should be capable of maintaining a constant airflow velocity of 0.25 m/s at the
diffuser. This should be accomplished through the use of a diffuser or flow equalizer that ensures uniform and constant Rupees Three Lakh(s)
2 5.00 air distribution over the entire surface area. The structure holding the filtration system, including the filter frames and top 390000.00 Nos.
Ninety Thousand Only
plenum, should be made from either aluminum or stainless steel. The system should be CE/UL certified and designed to
achieve an ISO 14644/1 classification of ISO 5, with a bacteriological class of B (5 CFU/m3) and particle
decontamination kinetics CP of 5 minutes. After installation, the system's performance should be validated by a third-
party government-approved environmental lab to ensure compliance with specified standards. A positive pressure should
be maintained inside the operating theatre to prevent contamination from external air sources. The supplier should
provide test certificates for the HEPA filters and the laminar airflow systems from the original manufacturers.
Furthermore, the size of the laminar airflow system should be a minimum of 8 feet by 8 feet. Finally, the entire system
should meet CE/BIS certification standards, ensuring it adheres to both European and Indian safety and performance
regulations and including validation.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
The flooring within the surgical theatre should consist of a minimum of 2mm thick antistatic seamless PVC, ensuring
durability and safety. This floor should be smooth, non-slip, and made from an impervious material with sufficient
conductivity to dissipate static electricity effectively, yet not so conductive as to risk electric shock to personnel. The
PVC used should be of very high quality, particularly designed for electrostatic charge dissipation, and should not be
less than 2 mm in thickness. The installation process should utilize continuous rolls, and joints should be seamlessly
welded using special PVC thermal welding units with welding bars of the same color to ensure uniformity and prevent
contamination. The sheets should be highly durable, capable of resisting shocks, indentations, and scratches. The
conductive material should be uniformly impregnated within the PVC as grains to enhance its antistatic properties.
Additionally, the flooring should be inert to body fluids, chemicals, and disinfectants, and remain unaffected by
temperature variations typical within an operating theatre. It should efficiently discharge electric charges up to 2 kV, and
Rupees Four Thousand
3 297.00 the electrical resistance (point to ground) should be maintained within 2.5x10^4 to 5x10^6 ohms, ensuring no buildup of 4250.00 Sq Mtrs.
electrical charge beyond 100 volts. Floor installation should be performed by skilled workers from accredited agencies Two Hundred Fifty Only
authorized by the PVC sheet supplier. The installation should include a conductive copper grid beneath the PVC sheet,
supported by liquid epoxy compounds to create a uniform and level surface. Copper strips should be made visible by
grinding and not project more than 0.5mm above the floor level to prevent damage to the PVC sheet, with one earthing
lead brought out from every 150 sq.ft area and attached to the main earthing strip/ground. The flooring should also be
mechanically shockproof, scratchproof, flame retardant, and antimicrobial. Corners of the flooring should be uniformly
curved, and a concealed cove-former (aluminium) should overlap the wall panel to a height of approximately 25mm and
be sealed perfectly and uniformly. Before laying the PVC, suitable self-leveling compounds should be used to prevent
any undulations within the operating theatre. The final surface should be non-corrosive to biological fluids and
detergents, with a color that is uniform, pleasant, and matching with the ambience as approved by the respective
The door to the surgical theatre should be a hermetically sealed, single sliding door measuring 2.1 meters in height and
1.5 meters in width. The door should be equipped with a controller capable of being operated by elbow switches, foot
switches, and a touchless sensor, providing multiple, accessible control options. The track for the door should be made
from stainless steel or aluminum, with the running surface for the top rollers angled appropriately to minimize resistance
and facilitate smoother movement. The door leaf should be suspended using high-quality hard plastic rollers with double
bearings at the top. These rollers should run under the stainless steel or aluminum track to ensure smooth and noiseless
operation. The opening and closing mechanisms of the door should be controlled by a microprocessor for precise
electromechanical movement. The material of the door should be either SMS or HPL, with a color that matches the
interior design. The door should be designed to be strong yet lightweight for ease of use. In case the automatic
mechanism fails, the door should still be able to open and close effortlessly manually. The handle of the door should be
made from stainless steel with a matte finish and equipped with a high-quality cylindrical or ESPg lock for security. The Rupees Two Lakh(s)
4 5.00 door leaf should incorporate a high-quality synthetic rubber gasket with long durability to ensure hermetic sealing and 295000.00 Ninety Five Thousand Nos.
maintain a 99.99% air tightness at a minimum pressure of 75Pa. The floor on either side of the door should be perfectly
level, with a maximum permissible difference of +1mm, to avoid any tripping hazards or unsealed gaps. The overall
thickness of the finished door should range from 30-60mm, with the inner part of the door filled with CFC-free
polyurethane foam, approximately 48mm thick, sealed airtight to block any microbial ingress. The door and its controls
should comply with IEE regulations, utilizing DC brushless or PMDC motors that are effectively isolated from mains
power to ensure safety and reliability. Additionally, the door should include a vision window measuring 300mm x
300mm, featuring double-glazed panels that are hermetically sealed to maintain the integrity of the seal.
The movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should be CE marked, BIS
certified, or IEC 60601 certified to meet international and national safety standards. A test certificate for the hermetically
sealed door frame should be included in the pre-dispatch documents to verify compliance with the specified standards
and functionality.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Membrane-Type Operation Switch and Communication Controller -
The Operation Switch and Comms Controller should encompass all necessary controls to ensure the proper operation
and monitoring of equipment and services in the operating room (OR). Positioned for optimal visibility in the surgeon's
line of sight and the OT staff, the wall-mounted membrane-buttons should be easily accessible to the nurse for operation
and assistance. In addition to hosting a digital clock and elapsed time indicator, the panel should feature a medical gas
alarm, clearly indicating high and low gas pressures for each gas service, including vacuum, supported by an audible
alarm. The Operation Switch and Comms Controller should also provide an alarm mute option for fault annunciation,
Rupees One Lakh(s)
with pressure sensors strategically located near isolation valves. Controls for general lighting, including ON/OFF and
5 5.00 dimming, organized in groups for uniform illumination, should be present. Furthermore, the panel should facilitate
195000.00 Ninety Five Thousand Nos.
control over operating lights (major and satellite) and camera functions (on/off and intensity). A hands-free telephone set Only
with memory should be conveniently situated, and temperature and humidity controls for the room, linked to the AHU
(+/5%) using NO/NC or Chilled Water/Hot Water Actuator Control Valve (whichever is applicable), should be
adjustable from the Operation Switch and Comms Controller. Real-time indicators, such as a digital room pressure
indicator and HEPA filter bank differential pressure indicator, are essential for monitoring and maintaining a safe and
controlled environment in the operating room. Telephone with Alpha-numeric keyboard is required with Speed-dialing
Hatch boxes should be provided in each operating theater to facilitate the safe and efficient removal of waste materials to
the dirty linen area or adjacent corridor. Each hatch box should be equipped with two doors, operated electrically or
motorized, designed such that only one door can be opened at a time to prevent cross-contamination. UV lighting should Rupees One Lakh(s)
6 5.00 be installed to ensure sterilization and should remain on when both doors are closed, automatically turning off when 115000.00 Nos.
Fifteen Thousand Only
either door is opened. Indicators should be provided on both sides of the operating theater to monitor the door open/close
status. The material of the hatch box should also be SS304 grade stainless steel, with a minimum size of 600mm x
In each operating theater, an operating list board should be installed. It should be made of ceramic with magnetic
properties and should be flush with the wall to maintain cleanliness and ease of use. LED type flat panel X-ray viewing
panels should be provided, complying with relevant electrical safety codes, and mounted flush with the wall to prevent Rupees Twenty Eight
7 5.00 dust accumulation and microbial growth. The body should be made of extruded aluminum, powder-coated with a 28500.00 Thousand Five Hundred Nos.
bacteria-resistant and disinfectant-resistant finish. The diffuser on the front panel should provide a uniformly lit screen,
and dimming controls should be easily accessible. Additionally, a proper spring-loaded film clip with rollers should be
included to securely hold and easily remove films without causing scratches.
LED type flat panel X-ray viewing panel should be supplied. This should comply with relevant electrical safely codes.
This should be a 2-panel viewing screen. Mounting should be flush with the wall to avoid dust accumulation and growth
or organisms between wall and panel. Body should be of extruded aluminium powder coated black with bacteria Rupees Forty One
8 5.00 resistant and disinfectant resistant finish. The diffuser on the front panel should be a uniformly lit screen. Dimming 41500.00 Thousand Five Hundred Nos.
electronic control should be enclosed at the bottom of the cabinet. Proper spring-loaded film clip with rollers should be Only
provided to hold the films firmly and to remove the film without scratches
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The scrub station should be compact,
designed for use in the OT complex, and facilitate pre-procedural scrubbing. It should be made from heavy gauge type
304 stainless steel with a minimum thickness of 1.5mm and feature seamless welded construction polished to a satin
finish. The scrub sink should have a front access panel for easy maintenance of water control valves, waste connections, Rupees One Lakh(s)
9 4.00 stoppers, and strainers. Hands-free operation should be enabled through infrared sensors with programmable 126000.00 Twenty Six Thousand Nos.
adjustments. Thermostatic mixing valve control should maintain constant water temperature and be located behind the Only
access panel. Timing should be adjustable to meet individual usage requirements, and units should have reduced anti-
splash fronts. An additional knee/foot-operated switch should also be provided for enhanced functionality.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Storage Units - Storage units should be constructed with same
material, as wall and ceiling panels. The shelves, made of glass and, should be removable for cleaning. The unit should
be divided into two or more parts, each with individual glass doors equipped with a high-quality locking system. The Rupees Eighty Five
overall size of the storage unit should Thousand Only
be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To enhance the operational environment of
each operating theatre, peripheral lighting and clean room luminaries should be installed, with a minimum of eight units
per theatre. These lights should offer an intensity of at least 500 Lux and be housed in highly specular anodized
aluminum with an optical antiglare system to minimize visual fatigue and glare. Each peripheral light should measure 2'
x 1'. The covers for these luminaries should be constructed from highly resistant, disinfectant-proof laminated safety
glass or acrylic, featuring a stylish, fine-grained surface that complements the clean and sterile environment of the
operating theatre. The body of the luminaries should be made from sheet steel, perfectly powder-coated to resist
11 46.00 contamination and facilitate easy cleaning, and should be ready for connection either as individual units or within a 12000.00 Nos.
series circuit. This setup should include digital electronic control gear utilizing multilamp technology to optimize energy Thousand Only
efficiency and light output. The installation of these luminaries should ensure that the recess frames are gas tight. Each
fitting should be flush with the ceiling and designed to be removable from either the top or bottom for ease of
maintenance. It is crucial that the light fittings are uniformly and aesthetically distributed across the ceiling to provide
consistent illumination throughout the OT, without interfering with visibility during procedures such as green mode
endoscopy. Furthermore, the peripheral lighting system should conform to IP65 or IP54 international protection ratings,
ensuring that the fixtures are dust tight and protected against water ingress, suitable for the demanding conditions of an
operatingInstallation,
Supply, theatre. Testing and Commissioning of Electrical Wiring inside OT - Power distribution within each
Operating Theatre (OT) should be handled via distribution boards located locally to each theatre using Fire Resistance
Low Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to these panels should be provided
by the general electrical contractor, and all distribution services within the departments should run from these panels.
The power distribution unit should hold certifications such as EN, CE, FDA, IEC, and BIS to ensure compliance with
international safety and performance standards. Each wall of the MOT should have a minimum of two hybrid switch
sockets (6/16A) on each wall, in compliance with IEC standards. Light fittings within the clinical areas should be
recessed LED types equipped with control gear and sealed in accordance with the IP54 standard. This standard ensures
that the fittings are protected against limited dust ingress and water spray from all directions, suitable for clinical Rupees Two Lakh(s)
12 4.00 environments. All equipment should be fully and permanently labeled to clearly identify and describe the function, 299000.00 Ninety Nine Thousand job
operation, and voltage of the apparatus concerned. Upon completion of the electrical installation, tests should be carried Only
out in accordance with the relevant sections of local wiring regulations, with results duly recorded. Each OT should have
a distribution board (DBs) installed, with suitable wiring. A separate enclosure should house all high-voltage equipment
to ensure safety and isolation. The remote cabinet should contain operating lamp transformers, mains failure relays,
UPS, electrical distribution equipment, and circuit protection equipment for all circuits within the operating theatre. All
internal wiring within the DBs should terminate in connectors equipped with screws and clamp springs. Connections
should be of the clip-on type mounted on a rail approved by CE/IEC/BIS standards and labeled with indelible
proprietary labels. All internal circuits should be protected by individual fuses or miniature circuit breakers to ensure
safety and manage potential electrical faults effectively.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT - Power distribution within each
Operating Theatre (OT) should be handled via distribution boards located locally to each theatre using Fire Resistance
Low Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to these panels should be provided
by the general electrical contractor, and all distribution services within the departments should run from these panels.
The power distribution unit should hold certifications such as EN, CE, FDA, IEC, and BIS to ensure compliance with
international safety and performance standards. Each wall of the MOT should have a minimum of two hybrid switch
sockets (6/16A) on each wall, in compliance with IEC standards. Light fittings within the clinical areas should be
recessed LED types equipped with control gear and sealed in accordance with the IP54 standard. This standard ensures
that the fittings are protected against limited dust ingress and water spray from all directions, suitable for clinical
12A 1.00 environments. All equipment should be fully and permanently labeled to clearly identify and describe the function, 100000.00 Rupees One Lakh(s) Only job
operation, and voltage of the apparatus concerned. Upon completion of the electrical installation, tests should be carried
out in accordance with the relevant sections of local wiring regulations, with results duly recorded. Each OT should have
a distribution board (DBs) installed, with suitable wiring. A separate enclosure should house all high-voltage equipment
to ensure safety and isolation. The remote cabinet should contain operating lamp transformers, mains failure relays,
UPS, electrical distribution equipment, and circuit protection equipment for all circuits within the operating theatre. All
internal wiring within the DBs should terminate in connectors equipped with screws and clamp springs. Connections
should be of the clip-on type mounted on a rail approved by CE/IEC/BIS standards and labeled with indelible
proprietary labels. All internal circuits should be protected by individual fuses or miniature circuit breakers to ensure
safety and manage potential electrical faults effectively.
AIR HENDALING UNIT Make:KrVelocity: Not More Then 10 mt/second. , Canvass Connection-Heavy duty, non
partical shreding,Fire Retardentuger,Nikotra only , Type: PLUG,Drirect Driven,Dynamically Balanced Selection of fan-
Should run comfortably at 50 HZ at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB , Type:TEFC, IP:55,
Foot Mounted, VFD compitable and I2 generation Safety: Motor should have interlocked with AHU Motor
door/excess/Fire DamperType-TWO TIRE, Floor Mounted , Inner const.:0.6mm plain G.I , Outer const.:0.8 mm G.I. Pre Rupees Twelve Lakh(s)
13 5.00 coated / Powder coated Thickness of Insulation: 25mm,PUF injected having density 40 to 42 kg/m3. ,Colour:As ######## Twenty Five Thousand job
approved by CLIENT CONDENSING UNIT : Only
Condensing unit for AHU with all assesories and instalation (Copper pipie provide 3 mtr Only Extra will charged
extra) consider 1200 sqfeet insulation and ducting
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following features and enclosed
technical specifications, having Mobile App Connectivity, Battery Backup
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 – 100% (using Digital Capacitive Touch
(Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
-Working range - 1 m
Rupees Three Lakh(s)
14 4.00 -Color rendering index 93Ra 390000.00 Nos.
- Focusing Preset: Adjustable Ninety Thousand Only
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO License for this product under Class A, Compliant
to IEC standards such as IEC60601-1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates to be submitted
with Bid) Clause-wise Technical Compliance to be.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following features and enclosed
technical specifications, having Mobile App Connectivity, Battery Backup
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 – 100% (using Digital Capacitive Touch
(Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
-Working range - 1 m
14A 1.00 -Color rendering index 93Ra 200000.00 Rupees Two Lakh(s) Only Nos.
- Focusing Preset: Adjustable
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO License for this product under Class A, Compliant
to IEC standards such as IEC60601-1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates to be submitted
with Bid) Clause-wise Technical Compliance to be.
Single-arm surgery/anesthesia pendant designed for Operating Theatres should feature a compact, modular configuration
to meet the precise requirements of hospitals, enabling customization to suit specific operational needs of both Operating
Theatres and Intensive Care Units. It should be equipped with robust ceiling support capable of mounting a selection of
arms. The extension arm, pivotal for functionality, should allow horizontal movement with a radius of 800-900mm and
provide a level rotation ranging from 0 to 330/340 degrees, with both the extension arm and terminal box designed to
rotate together and independently for maximum versatility. The pendant should support a net loading capacity of min.
100 kg, accommodating a variety of medical instruments and devices securely. For medical and electrical services, it
should offer configurations that include at least two oxygen outlets, two vacuum outlets, one medical air, one medical air
at 7 bar, and an optional nitrous oxide outlet (In-scope of MGPS vendor) Additionally, there should be six main sockets, Rupees Two Lakh(s)
15 5.00 each capable of supporting 5 to 15 amps, conforming to universal standards to facilitate the operation of various medical 284000.00 Eighty Four Thousand Nos.
and electronic devices. In terms of materials and construction, the pendant should be crafted from high-strength Only
aluminum alloy with a sealed design to enhance durability and maintain sterile conditions. The arm itself should be made
from high-density aluminum alloy extrusion, ensuring both strength and reliability. Installation of the pendant should be
ceiling-mounted to provide a reliable and firm setup, optimizing space usage in the Operating Theatre or ICU while
seamlessly integrating with existing medical systems for managing medical gas, electrical services, data communication,
and equipment. Additionally, the pendant should include practical features such as a stainless steel IV pole and a ward
vacuum unit clamp to further enhance its utility in a medical setting. With a net weight of approximately 105 kg,
accessible by the equipment carrier, the pendant should be robust yet manageable, ensuring it meets the rigorous
demands of modern medical environments.
Providing and fixing UPS (25KVA) Of Good Quality as directed by engineer incharge Rupees Three Lakh(s)
16 5.00 375000.00 Seventy Five Thousand job
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired Point(from existing line ) as
directed by engineer incharge from Outer Nearest Passage to OT Pendant Rate Including , Alarm , Valve (for all line)
Rupees Three Lakh(s)
Point ,Flowmeter and Probe . if alredy then no payment given. Forty Five Thousand Only
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired Point(from existing line ) as
17A 1.00 directed by engineer incharge from Outer Nearest Passage to OT Pendant Rate Including , Alarm , Valve (for all line) , 100000.00 Rupees One Lakh(s) Only job
Point ,Flowmeter and Probe . if alredy then no payment given.
Comprehensiv Maintenance of OT as per prevailing standards and Specifications as directed by Engineer in Charge For Rupees Sixty Five
18 5.00 Modular OT for 1st Year 65900.00 Thousand Nine Hundred Nos.
Comprehensiv Maintenance of OT as per prevailing standards and as directed by Engineer in Charge For Modular OT Rupees Seventy Two
19 5.00 for 2nd Year 72490.00 Thousand Four Hundred Nos.
Comprehensiv Maintenance of OT as per prevailing standards and as directed by Engineer in Charge For Modular OT Rupees Seventy Nine
20 5.00 for 3rd Year 79739.00 Thousand Seven Nos.
Hundred Thirty Nine Only
(A) Total Tender Amount
(B) % of above / Below on Tendered Amount
(C) Net Tendered Amount (A-B)
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note-2 All the columns in Schedule-B should be filled in ink and the total of the entries in the last column should be struck by the contractor under this signature.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for work under all conditions, site, moisture, weather etc.
Note-4 Serviceable material available (If any) after Demolishing / Deismentalling any item should be hand over to concered PIU site engineer in charge as per instruction.
Note-5 Credit Value for Dismantling building shall be recovered from first RA bill. Amount for the same shall be considered fixed (Rate shall not be above / below)
Signature of Contractor Deputy Executive Engineer Executive Engineer
PIU, Mahesana PIU, Mahesana
Signature of the Contractor.
Deputy Executive Engineer Executive Engineer
PIU Sub Division PIU Division,
Mehsana Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-Make List-4171-06-10-2017.pdf
02-Make List - Civil Items-05-02-2020.pdf
19-Special Conditions-07-02-2025.pdf
Building-Specification.pdf
Ele-List of Approved Products-FINAL.pdf
GRs and Conditions-11-06-24.pdf
Insurance Clause-03-11-2025.pdf
Standard Specification for Electrical Work.pdf
Final Draft PQ for OT.pdf
Make List Dt-15-10-25-6680.pdf
SBD (1).pdf
SC-B Club- Qty.pdf
Special Condition Schedule-C.pdf
Tender Details-138-03.pdf
Download all tender documents and submit your bid