Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
11 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Panchayat (R&B) Division, Tapi
Reti Kankar 2025-26 Construction of Visamo (Vankutir) for Senior Citizen at Village Naranpur Ta.Uchchhal Dist.Tapi.
272672
26 OF 2025-26
Open
Civil Works - Buildings
Works
Tapi
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹9,000
Yes
4 Feb 2026
4 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Name of Work:-Reti kankar Yojna 2025-26. Construction of Visamo (Vankutir) for Senior Citizen at Village
Naranpur Taluka Ta.Uchchhal Dist.Tapi.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) Figures
1 Excavation for foundation upto 1.5 m depth including sorting 2.88 Cum. 261.82
out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(C) Hard Murrum
2 Filling available excavated earth (excluding rock in trenches 1.44 Cum. 133.66
plinth, slides of foundations etc. in layers not exceeding
cm in depth consolidating each deposited layer by ramming
3 Filling in foundation and plinth with murrum or selected soil in 32.40 Cum. 296.30
layers of 20cm thickness including watering ramming and
consolidating etc. complete
4 Providing and laying cement concrete 1:2:4 (1- Cement : 2- 16.45 Cum. 3713.67
Coarse sand : 4- graded stone aggregates 20 mm nominal
size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth (more than 10 ton)
5 Providing and laying controlled cement concrete M-200 and 0.94 Cum. 9066.13
curing complete including the cost of form work but excluding
cost of reinforcement for reinforced concrete work for
Column upto plinth level.
6 Providing and laying controlled cement concrete M.200 and 3.81 Cum. 6375.70
curing complete the cost of formwork but excluding
reinforcement for reinforced concrete work in (D) Columns,
Pillars posts and struts, upto floor two level. (more than
7 Brick work using common burnt clay building brick having 13.47 Cum. 4121.55
crushing strength not less than 35 kg/sq. cm. in foundation
and plinth in cement mortar 1:6 ( 1 Cement: 6 fine sand) (B)
8 20 mm thick sand faced cement plaster with on wall upto all 105.71 Sqmt 135.53
height above ground level consisting 12 mm thick backing
coat of c.m. 1:3 (1 cement : 3 sand ) and 8 mm thick finishing
coat of cm 1:1 (1 cement : 1 sand) etc. complete.all height
9 Wall painting (two coats) with plastic emulsion paint of 105.71 Sqmt 86.93
approved brand and manufacture with on undecorated wall
surface to give an even shade including throughly brushing
the surface free from mortar droppings and other foreign
matter and sand papered smooth along ceilings and sloping
10 Providng TMT bars renforcement of FE 500/500D for R.C.C. 1566.60 kg 77.29
work including bending binding and placing in position
complete for all floor.
11 Steel work, welded in built up sections framed work including 27.10 Qui 9908.67
cutting, hoisting, fixing in position and applying a priming coat
of red lead paint. (D) In trussses and trussed purlins, upto
M. span and 15 M. ovarall height.
12 Providing corrugated G.I. sheet of class-3 roofing fixed with 150.82 Sqmt 734.19
glavanished iron J or L Hooks, Bolts and nuts 8mm diameter
with bitumen and G.I. limpet washer or G.I. limpet washer.
filled with white lead complete excluding the cost of purlins,
Rafters and Trusses.(1) 0.80 mm thick sheet.
13 Providing and laying polished Kota stone slab flooring over 146.23 Sqmt 1015.82
20mm (Average) thick base of cement mortar 1:6 (1-cement :
6-coarse sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand)
laid over and jointed with grey cement slurry mixed with
pigment to match the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in figures
and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by the Engineer
– In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt G.R.: PRC-
10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in R.C.C. items where the
reisa change as per actual mix design the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD_ Vankutir Naranpur.pdf
BOQ_Vankutir Naranpur.pdf
Specification_Vankutir Naranpur.pdf
GRs - SBD with Index.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .