| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance Admitted in Tech.evaln. subject to the decision on Fin. Evaln. |
| 2 | L2₹6.1 L+₹39,592.54 (6.95%)Accepted-Finance | ₹6.1 L+₹39,592.54 (6.95%) | L2 | Accepted-Finance Admitted in Tech.evaln. subject to the decision on Fin. Evaln. |
| 3 | Rejected-Technical KERALA KL | MALAPPURAM | KERALA | 670612 | - | - | Rejected-Technical Higher rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical Higher rate |
| Sl No | Description | Qty | Unit | Syma_Constructions L4 | Rajendra Prasad B L3 | AMAL.S L2 | SANAL KUMAR L1 |
|---|---|---|---|---|---|---|---|
| 1.00mavila anganvadi compound wall | |||||||
| 1.00 | OD75572/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for
reuse for any thickness of walls in DR masonry including disposal of debris within a distance of
150m | 13.25 | cum | 700 ₹9,275 | 400 ₹5,300 Lowest | 683 ₹9,049.75 | 638.59 ₹8,461.32 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.45 | cum | 359.72 ₹3,398.63 | 400 ₹3,779.2 | 324 ₹3,061.15 | 303.24 ₹2,865.01 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.16 | cum | 7,200 ₹1,166.4 | 6,000 ₹972 Lowest | 7,155 ₹1,159.11 | 6,687.43 ₹1,083.36 |
| 1.00 | OD75642/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 14.37 | cum | 3,600 ₹51,732 | 3,800 ₹54,606 | 3,602 ₹51,760.74 | 3,366.49 ₹48,376.46 Lowest |
| 1.00 | OD75571/2026-2027:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 7.95 | cum | 1,600 ₹12,720 | 2,200 ₹17,490 | 1,547 ₹12,298.65 | 1,446.49 ₹11,499.6 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 11.9 | cum | 7,700 ₹91,660.8 | 6,500 ₹77,376 Lowest | 7,525 ₹89,577.6 | 7,033.56 ₹83,727.5 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.13 | cum | 90,200 ₹1,01,565.2 | 8,000 ₹9,008 Lowest | 9,460 ₹10,651.96 | 8,842.03 ₹9,956.13 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 61.93 | kilogram | 104 ₹6,440.72 | 90 ₹5,573.7 Lowest | 101 ₹6,254.93 | 94.78 ₹5,869.73 |
| 1.01 | 50.6.3.1:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth for 10 cm thick wall in CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete | 0.8 | cum | 6,900 ₹5,520 | 6,500 ₹5,200 | 6,947 ₹5,557.6 | 6,492.91 ₹5,194.33 Lowest |
Tender Value
₹6.8 L
EMD Value
₹16,902
Closing Date
6 Aug 2026, 6:00 pmClosed
BIKAS GS
LID EW SECTION POOTHAKULAM
Poothakkulam G.P. Maintenance of various Anganvadi-P.No.81
2026_LSGD_863453_13
01/2027/AE/LIDEW PKLM
Open Tender
Civil Works - Buildings
Item Rate
POOTHAKULAM GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,495
Yes
₹16,902
Yes
5 Sept 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
6 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1mavila anganvadi compound wall | |||||
| 1.001 | OD75572/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for
reuse for any thickness of walls in DR masonry including disposal of debris within a distance of
150m | - | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | OD75642/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.005 | OD75571/2026-2027:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.006 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.009 | 50.6.3.1:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth for 10 cm thick wall in CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1460961.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.16 MB
BOQ_1460961.xls
BOQ • 0.32 MB
AFFIDAVIT13.pdf
Tender Documents • 0.11 MB
SBD13.pdf
Other Document • 1.04 MB
FOT13.pdf
Tender Documents • 0.01 MB
PRELIMINARY13.pdf
Tender Documents • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .