| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L-1 | Accepted-AOC work order |
| 2 | L-2₹4.0 Cr+₹2.9 L (0.73%)Rejected-Finance CHECHI TOWER BHADDI ROAD BALACHAUR | ₹4.0 Cr+₹2.9 L (0.73%) | L-2 | Rejected-Finance being L-2 |
| 3 | L-3₹4.0 Cr+₹8.6 L (2.19%)Rejected-Finance 51 A 4 BHOJPUR P O BHOJPUR TEHSIL SUNDERNAGAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | ₹4.0 Cr+₹8.6 L (2.19%) | L-3 | Rejected-Finance being L-3 |
| 4 | L-4₹4.2 Cr+₹23.0 L (5.84%)Rejected-Finance KANAULI KOTHI LALESHWAR R M S COLONY KANKARBAGH PATNA BIHAR 800020 | PATNA | BIHAR | 800020 | ₹4.2 Cr+₹23.0 L (5.84%) | L-4 | Rejected-Finance being L-4 |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Others-DD of Earnest money and tender fees has been prepared by the person other than the tenderer/Bidder. |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
3 Jun 2024, 1:00 pmClosed
Addl. Superintending Engineer
Addl.S.E. HCBG BBMB Sundernagar
Restoration and Stabilisation of damaged outer slopes of Sundernagar Hydel Channel by providing PCC block Pitching, herring bone drain and Geo Synthetic Mat on embankment slopes of Sundernagar Hydel Channel at BSL P BBMB Sundernagar
2024_BBMB_191656_2
NIT-17/23-24HCBG
Open Tender
Civil Works
Tender cum Auction
240 days
Sundernagar
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,540
Sr. Accounts Officer BBMB Sundernagar
₹9.4 L
25 Jul 2024
17 May 2024
4 Jun 2024
17 May 2024
3 Jun 2024
17 May 2024
Amount
Jungle clearance (for Medium density )
Earth work excavation in ordinary soil, exclusive of compensation of earth:-Earth work undressed with a combined lead upto 15 metres including breaking of clods.
Earth work for filling in embankment slopes including excavation of available earth for filling, loading and carriage upto earth fill site, laying of earth in layers (each layer should not exceed 15 cm) including compaction of each layer by rolling/ramming and watering (at least 95% of the maximum dry density) etc. all complete as per drawing and direction of Engineer- in- charge
Dressing side slopes and preparation of sub grade for lining.
Extra for Compaction of earthwork in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density)
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Cement concrete 1:4:8. with stone ballast 20mm gauge. mixing by mechanical means using concrete mixer volumetric type.
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering).
Cement concrete 1:2:4 with stone ballast or shingle. mixing by mechanical means using concrete mixer volumetric type.
Cement concrete 1:3:6 with stone ballast or shingle. mixing by mechanical means using concrete mixer volumetric type.
Boulder masonry in cement mortar (1:6) in foundations and plinth.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Includes Mazdoor required for trimming of slope to proper profile and preparation of bed.
Providing and laying P.C.C.block pitching over the base prepared for laying on embankment slopes with PCC block tiles of size 30cm x 30 cm x 4.0 cm laid over 20 mm thick cement sand mortar plaster with joint thickness 6mm filled with 1:3 cement sand mortar including curing etc. complete
Providing and laying half cut 250 mm internal dia RCC pipe (NP-2 class) including cutting, jointing and placement in position on prepared bed surface etc. complete.
12.5 mm thick cement plaster 1:3.
Rough grassing including uprooting rank vegetation and weeds by digging the area to a depth of 15 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, mixing fertilizer, levelling and dressing for planting new grass, including disposal of all rubbish with all leads and lifts, planting doob grass in rows 15 cm apart in both directions, watering and maintenance till first mowing.
Providing and laying of GEO-synthetc Mat on embankment slope including laying and fixing, filling of earth cover 25-50 mm thick, dressing and finishing of earth cover etc. in complete.
Bidder Name
Amount in Words
JMM INFRACON
M/S CHECHI CONSTRUCTION CO
ANIL KUMAR
PARVEEN KUMAR
PARVEEN KUMAR
JMM INFRACON
ANIL KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .