Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance VPO JALGRAN TEH DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L1 | Admitted-Finance | ||
| 2 | L2₹1.6 Cr+₹14.8 L (10.5%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.7 Cr+₹25.3 L (18.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.7 Cr+₹25.9 L (18.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹1.9 Cr+₹48.0 L (34.2%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
4 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er Anil Kumar Gupta
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2022_PWDJK_160468_1
74 of 2021-22 dated 12-02-2022
Open Tender
Civil Works
Percentage
540 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹4.9 L
Suptt. Engg. PWD (RNB) Jammu Kathua, Circle Jammu
31 Mar 2022
14 Feb 2022
5 Mar 2022
14 Feb 2022
4 Mar 2022
14 Feb 2022
18 Feb 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete, | 4,059 | Cum | 300 | ₹12,17,700 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) in trenches, foundation, drains pipes cable etc. in all classification of soils and disposal of excavated earth and refilling the available excavated earth behind trenches or wherever required incl. levelling, dressing, ramming, watering and rolling etc. as per directions of Engineer-in-charge with all leads / lifts and carriage complete job. | 946 | Cum | 252.05 | ₹2,38,439.3 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with, 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), with all leads / lifts and carriage complete job. | 70 | Cum | 4,419.85 | ₹3,09,389.5 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with, 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete | 454 | Cum | 6,608.35 | ₹30,00,190.9 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering shuttering finishing & reinforcement. All work upto plinth level 1: 1.5 : 3 ( 1 : cement : 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. with all leads and lift carriage complete. | 25 | Cum | 7,091.6 | ₹1,77,290 |
| 6 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level a) 1:5:10 (1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40mm nominal size) with all leads and lift carriage complete. | 114 | Cum | 4,029.15 | ₹4,59,323.1 |
| 6.01 | b) 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size, with all leads and lift carriage complete. | 443 | Cum | 4,943.4 | ₹21,89,926.2 |
| 7 | Centring and shuttering including strutting, propping etc. and removal of form work for:- a) Foundations, footings, bases of Columns. | 2,097 | Sqm | 262.3 | ₹5,50,043.1 |
| 7.01 | b) Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 850 | Sqm | 573.85 | ₹4,87,772.5 |
| 7.02 | c) Edges of slabs and breaks in floors and walls Above 20 cm wide | 21 | Sqm | 1,073 | ₹22,533 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendernotice_1.pdf
Tender Document • 0.20 MB
SBD.pdf
Tender Document • 0.18 MB
BOQ_365705.xls
BOQ • 0.30 MB
BOQ_365705.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .