Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71,412Accepted-AOC VILL TALSARI P O KALLAR TEHSIL SADAR DISTT BILASPUR H P | ₹71,412 Quoted ₹71,412.22 | L1 | Accepted-AOC Lowest bidder |
| 2 | Rejected-Technical VILL BAROTA JATTAN P O BERI RAJDIYA TEHSIL SADAR DISTT BILASPUR HP | - | - | Rejected-Technical Rejected |
| 3 | Rejected-Technical A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | - | - | Rejected-Technical Rejected |
Tender Value
₹89,377
EMD Value
₹2,234
Closing Date
19 Mar 2026, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer, Electrical Division , HPSEBL, Bilaspur.
Tender for Providing SOP to drip irrigation system at HP-Shiva Project Karot by providing 1 Phase LT Line from existing 63 KVA, 11/0.4 KV S/Stn HP Shiva Karot in (E) Section Jukhala under Electrical Sub- Division Namhol.
2026_HPSEB_131405_1
69/2025-26
Open Tender
Electrical Works
90 days
Bilaspur
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹2,234
23 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
Material Part of LT (TS No.99/2025-26, WBS No. D-25-2020)
Prov. RCC Muff with concerete filling
LT 3.5 Cable 50mm2
MS angle iron (75x75x6mm) length 1500
MS angle iron knee bracing (75x75x6mm) length 600
Shackle insulator
D-iron
LT Stay Set (i/c Stay clamp)
Prov. Stay wire(7/3.15mm)(6.0Kg per stay)
Full Clamp
Half clamp
Earth hook
LT Earthing set (preferbly coil earthing)
Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )]
Prov. Red oxide
Prov. Aluminium Paint
Erection Part of LT (TS No.99/2025-26, WBS No. D-25-2020)
Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect
Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20*.80*.1.50 mtr, filling and ramming of pit complete in all respect
Erection of LT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect.
Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect.
Erection AAAC 6/1/2.59 i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect.
Manual carriage for above material (Av. Lead 0.100Km.) (For 1-Ph Line)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_194258.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BIDDocument69.pdf
Tender Documents • 0.46 MB
BOQ_194258.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid