Tender Value
₹37.0 L
EMD Value
₹38,000
Closing Date
21 Jul 2026, 6:10 pm
Executive Engineer, Sabarkantha Irrigation Division, Himatnagar
Constructing Compound wall at Virpur Colony of Guhai W.R Project. At- Virpur Ta- Himmatnagar
321281
Tender Notice No 05 of 2026-27
Open
Civil Works
Sabarkantha
7 documents required · 6 mandatory · 1 optional
₹1,500
Executive Engineer Sabarkantha Irrigation Division Himatnagar
₹38,000
7 Jul 2026
7 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
BILL OF QUANTITIES
of Constructing Compound wall at Virpur Colony of Guhai W.R Project. At- Virpur Ta- Himmatnagar
MEMORANDUM SHOWING THE DETAILS OF ITEM OF WORK TO BE CARRIED OUT
Quantity Approved RATE
Item estimated but
Item of Work In Figure Unit Amount
No. may be more
or less Rs. Ps.
1 Jungle clearance of specified category and bushes for
canal/dam work as directed with
disposing materials etc. complete.(Excluding tree of
girth above 0.5 Mt.) (b) For Medium dence
Dismentling barbed wire in fencing including making
rolls and also including dismentling fencing posts
including all earth work concrete in base and making
good the disturbed ground stacking useful materials as
directed and disposing as directed and disposing of the
unserviceable materials with all lead and lift.
3 Excavation for foundation in all sorts of soil including
yellow, sandy, gravelly soil, soft & hard murrum etc.
in dry condition including depositing the excavated
stuff in uniform layers in banks as and where directed 261.00 107.80 Cmt.
etc. complete for lead upto 500 mt. and all lift. ( by
machinery) Including dewatering.
4 Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel reinforcement
(A) For Foundation concrete / General purpose (a) C.
C. Nominal Mix, M-10 and MSA-40 mm
5 Providing and laying uncoursed rubble masonry in
ordinary portland cement mortar 1:5 proportion in
foundation including curing etc. complete for all leads
6 Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel
reinforcement(A) For Foundation concrete / General
purpose , C. C. Nominal Mix, M-15 and MSA-20 mm
7 Providing and placing in position reinforcement bars
including cutting, bending welding, joints where
necessary, hooking etc.complete as per drawing for 44.67 7618.00 Qtl.
all lead and lifts.(d) TMT-CRS
8 Providing and laying burnt brick masonry in
foundation ordinary portland cement mortar 1:5
proportion including, curing etc. complete for all leads
and lifts. (Conventional Bricks)
9 Providing sand faced cement plaster 13 mm thick in
C.M. 1:3 including watering, finishing, scaffolding, 1914.00 375.60 Smt.
curing etc.complete
Quantity Approved RATE
Item estimated but
Item of Work In Figure Unit Amount
No. may be more
or less Rs. Ps.
10 Distempeing (Two coats) with oil bound washable
distemper of approved brand and manufacture and of
required shade on wall surfaces to give an even
shade, over and including a priming coat with alkali
resistance primer of approved brand after thoroughly
brushing the surface and other foreign matter and
also including preparing the surface even and sand
parpered smooth.
11 Providing and fixing concertina razor blade coil
fencing with Punched tape concertina coil 915 mm
dia 15 mt openable length on 3mt height of wall with
providing and fixing M.S. Angle (ISA (50mm x 50mm
x 5mm) of "Y" shape of size 300mm x 300mm x
1200mm with base plate 150 x 150 mm as directed
by Engineer in charge in existing masonry or cement
concrete using anchor fastner by drilling holes
complete to support barbed wire or concertino razor
blade with one coat of primer and two coat oil paint
including fixing of angle in concrete placed at 2.4mt to 435.00 474.01 Rmt.
3.00 mt apart and with 4 horizontal R.B.T. reinforced
barbed wire(3 mm) , stud tied with G.I. staples and
G.I. clips to retain horizontal, including necessary
bolts or G.I.barbed wire tied to angle iron, all
complete as per direction of Engineer-in-charge, with
reinforced barbed tape (R.B.T.)/Spring core (2.5 mm
thick) and weight 43.478 gm/meter at compound wall.
I / We am/are willing to carry out the work at ___________________________________ % above / below percent
(should be written in figures and words) of the estimated rates mentioned above. Amount of my/our tender
works out as under :-
Estimated amount put to tender Rs. Rs.
Deduct :- …………….. % below Rs. Rs.
Total:- Rs. Rs.
* (Please strike out whichever is not applicable)
Signature of Contractor Deputy Executive Engineer
Himmatnagar Irrigation Sub Division no.
Executive Engineer
Sabarkantha Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD- Virpur Wall Final.pdf
SCHB-Virpur.pdf
PA-Virpur.pdf
Tender Notice 05 of 2026-27.pdf
Download all tender documents and submit your bid