| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.3 LAccepted-AOC | ₹43.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.0 L+₹1.6 L (3.73%)Rejected-Finance | ₹45.0 L+₹1.6 L (3.73%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | D S RAJESHKUMAR L1 | SAJEEVKUMAR L2 |
|---|---|---|---|---|---|
| 1.00Laying Sewer Line | |||||
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 39.79 | cum | 428 ₹17,029.26 Lowest | 445.99 ₹17,745.05 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 32 | sqm | 74 ₹2,368 Lowest | 77.55 ₹2,481.6 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 3.2 | cum | 1,525 ₹4,880 Lowest | 1,588.97 ₹5,084.7 |
| 1.00 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 13 | sqm | 134 ₹1,742 Lowest | 139.26 ₹1,810.38 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 483.64 | cum | 665 ₹3,21,622.6 Lowest | 693.26 ₹3,35,290.35 |
| 1.01 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 228.29 | cum | 794 ₹1,81,263.85 Lowest | 827.19 ₹1,88,840.86 |
| 1.01 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 40.1 | cum | 922 ₹36,976.81 Lowest | 961.12 ₹38,545.72 |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 666.6 | metre | 31 ₹20,664.6 Lowest | 32.74 ₹21,824.48 |
| 1.01 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m | 1,026.4 | sqm | 163 ₹1,67,302.55 Lowest | 170.36 ₹1,74,856.82 |
Tender Value
₹45.0 L
EMD Value
₹50,000
Closing Date
9 Jun 2026, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer, Sewerage Division, Pattoor. Thiruvananthapuram
State Plan-2025 - 26 - Providing and laying new sewer line from the existing M H at Njaramoodu towards Hill top and branch line starting from Edapazhinji Sastha Nagar-Extension of sewer line .-Sewerage Work
2026_KWA_854043_1
WRD/KWA-CE(SR)/TR/710/2023
Open Tender
Civil Works - Others
Item Rate
150 days
Thiruvananthapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
₹50,000
Yes
7 Aug 2026
3 Jun 2026
11 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying Sewer Line | |||||
| 1.001 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 1 | cum | - | - |
| 1.002 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.003 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | - | cum | - | - |
| 1.004 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | sqm | - | - |
| 1.005 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 0.2 | cum | - | - |
| 1.006 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 0.8 | cum | - | - |
| 1.007 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | - | - |
| 1.008 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.009 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m | 0.4 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443408.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1443408.xls
BOQ • 0.35 MB
NIT1.pdf
Tender Documents • 7.83 MB
Extension1.pdf
PDF • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .