Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹232.8 Cr
EMD Value
₹2.3 Cr
Closing Date
23 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Municipal Commissioner Amdavad Municipal Corporation Amdavad
Refurbishment of Existing Subhash Bridge and Construction of New Bridge on either side of existing bridge across Sabarmati River On Engineering, Procurement & Construction (EPC) Mode
272273
2025-26
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹18,000
Yes
Municipal Commissioner Ahmedabad
₹2.3 Cr
Yes
3 Feb 2026
3 Feb 2026
3 Feb 2026
23 Feb 2026
3 Feb 2026
(See Clauses 2.1 and 8.1)
Site of the Project
(i) Site of the entire Project Corridor shall include the land, buildings, structures and
road works as described in Annex-I of this Schedule-A.
(ii) The dates of handing over the Right of Way to the Contractor are specified in Annex-
II of this Schedule-A.
(iii) An inventory of the Site including the land, buildings, structures, road works, trees
and any other immovable property on, or attached to, the Site shall be prepared
jointly by the Authority Representative and the Contractor, and such inventory shall
form part of the memorandum referred to in Clause 8.2 (I) of this Agreement.
(iv) The alignment plans of the Project are specified in Annex-III. In the case of sections
where no modification in the existing alignment of the Project is contemplated, the
alignment plan has not been provided. Alignment plans have only been given for
sections where the existing alignment is proposed to be upgraded. The proposed
profile of the Project shall be followed by the contractor with minimum FRL as
indicated in the alignment plan. The Contractor, however, improve/upgrade the
Road Profile as indicated in Annex-III based on site/design requirement.
(v) The environment clearances are not required.
The Site of the Project comprises River Bridge on Sabarmati River in Ahmedabad Municipal
Corporation area in the State of Gujarat. The land, carriageway and structures comprising
the Site are described below.
The Site of the Project comprises the land (sum total of land already in possession as
described below:
S. No. Chainage (km) Right of Way (m) Remarks
The present carriageway of the Project is Eight Lane in Approaches & Major Bridge
Carriageway is Four Lane. The type of the existing pavement is flexible.
4. Major Bridges
The Site includes the following Major Bridges:
S. Chainage Type of Structure No. of Width
No. (km) Foundation Sub- Super- Spans (m)
structure structure with span
1 0+290 to Well RCC Pier/ Balanced 5 Spans of 12.80m
0+744 Foundation Pier Cap Cantilever 76.25m & Carriageway &
PSC Box & 2 spans of 2.44mFootpath
Suspended 36.50m on Both Side
Span with with RCC
PSC Girder Parapet
5. Road over-bridges (ROB)/ Road under-bridges (RUB)
6. Grade separators
7. Minor bridges
8. Railway level crossings
9. Underpasses (vehicular, non vehicular)
12. Truck Lay byes
13. Road side drains
14. Major junctions
15. Minor junctions
17. Other structures
RCC Retaining walls towards RTO side for Service Roads between Ch 0+200 to Ch 0+325
(As per Clause 8.3 (i))
Dates for providing Right of Way of Construction Zone
The dates on which the Authority shall provide Right of Way of Construction Zone to the
Contractor on different stretches of the Site are stated below:
Sl. No From km to km Length Width Date of
(km) (m) providing
(i) Full Right of Way (full width) Project Length – 800 m m TP width Towards RTO side
(a) Stretch is 15.25m +36.6m + 15.25 m & Towards Shahibagh
(b) Stretch side ROW is 36.6 mtr
(ii) Part Right of Way (part width)
(iii) Balance Right of Way (width)
Alignment Plans
The existing alignment of the Project shall be modified in the following sections as per the alignment
plan indicated below:
(i) The alignment of the Project is enclosed in alignment plan. Finished road level indicated in
the alignment plan shall be followed by the contractor as minimum FRL. In any case, the
finished road level of the project highway shall not be less than those indicated in the
alignment plan. The contractor shall, however, improve/upgrade the Road profile as
indicated in Annex-III based on site/design requirement.
(ii) The contractor shall, however, improve/upgrade upon the traffic signage plan as indicated in
Annex-III based on site/design requirement as per the relevant specifications/ IRC Codes/
Environment Clearances
The environment clearances are not required
(See Clause 2.1)
Development of the Project Corridor
1. Development of the Project
Development of the Project Highway shall include design and construction of entire Project
corridor as described in this Schedule-B and in Schedule-C.
2. Rehabilitation and augmentation
Rehabilitation and augmentation shall include Eight-Laning, Rehabilitation and
Strengthening of Bridge and approaches as described in Annex-I of this Schedule-B and in
3. Specifications and Standards
Entire Project Corridor shall be designed and constructed in conformity with the
Specifications and Standards specified in Annex-I of Schedule-D.
Description of the Project
1. Widening/ Augmentation of the Existing project corridor
(i) The Project shall follow the existing alignment unless otherwise specified by the Authority
and shown in the alignment plans specified in Annex-III of Schedule-A. Geometric
deficiencies, if any, in the existing horizontal and vertical profiles shall be corrected as per
the prescribed standards for plain terrain to the extent land is available.
(ii) Width of Carriageway
(a) Eight-Laning with Footpath shall be undertaken. The paved carriageway shall be [8
(Eight) mx 4 (32m in Total)) wide in accordance with the typical cross sections
drawings in the Manual.
Provided that in the built-up areas [refer to paragraphs 2.1 (ii) (a) of the Manual and
provide necessary details]: the width of the carriageway shall be as specified in the
following table:
Sl. No. Built-up stretch Location (km to Width (m) Typical cross
(Township) km) section (Ref. to
2 Shahibaug Side 0+744 to 0+800 36.6 m NA
(b) Except as otherwise provided in this Agreement, the width of the paved carriageway
and cross-sectional features shall conform to paragraph 1.1 above.
2. Geometric Design and General Features
Geometric design and general features of the Project Highway shall be in accordance with R.
(ii) Design speed
The design speed shall be the minimum design speed of 50 km per hr for plain terrain.
(iii) Improvement of the existing road geometrics
In the following sections, where improvement of the existing road geometrics to the
prescribed standards is not possible, the existing road geometrics shall be improved to the
extent possible within the given right of way and proper road signs and safety measures
shall be provided:
Sl. Stretch (from km to Type of deficiency Remarks
m Road width in TP
2 0+350 to 0+800 Nil 36.6m Road Width in
(iv) Right of Way
Details of the Right of Way are given in Annex II of Schedule-A.
(v) Type of shoulders
(a) In built-up sections, footpaths/fully paved shoulders shall be provided in the
following stretches:
Sl. Stretch Fully paved Reference to cross
No. (from km to km) shoulders/ section
1 0+000 to 0+200 (RTO Footpath TCS
2 0+200 to 0+290 (RTO Footpath TCS
3 0+290 to 0+744 (Bridge - TCS 03 & GAD
4 0+744 to 0+800 Footpath TCS
(Shahibaug Side)
(c) Design and specifications of paved shoulders and granular material shall conform to
the requirements specified in the relevant Manual.
(vi) Lateral and vertical clearances at River Front Roads (East & West Side)
(a) Vertical Clearance: Min 5.0 m Clearance (Exist Road Lvl to Soffit of Girder) to be provided
(b) Lateral clearance: Proposed Pier location in Riverfront portion as shown in GAD should
not be changed or any change to be done with concern of authority only.
(vii) Lateral and vertical clearances at overpasses
(viii) Service roads
Service roads shall be constructed at the locations and for the lengths indicated below:
Sl. Location of service Right hand side Length (km)
No. road (from km to km) (RHS)/Left hand side of service road
(LHS)/ or Both sides
1 0+200 to 0+350 (RTO Both side 2 x 0.15 = 0.3 Km
Note: Increase additional length up to 0.2 km will not be considered as change of scope
(ix) Grade separated structures
(x) Cattle and pedestrian underpass /overpass
(xi) Typical cross-sections of the Project
Available in the drawing section.
3. Intersections and Grade Separators
4. Road Embankment and Cut Section
(i) Widening and improvement of the existing road cuttings and construction
of new road cuttings shall conform to the Specifications and Standards given in
Section 4 of the Manual and the specified cross sectional details. Deficiencies in the
plan and profile of the existing road shall be corrected.
5. Pavement Design
(i) Pavement design shall be carried out in accordance with the provision of relevant IRC code
(ii) Type of pavement
Flexible Pavement & Rigid Pavement
(iii) Design requirements
(a) Design Period and strategy
Flexible pavement for new pavement or for widening and strengthening of the
existing pavement shall be designed for a minimum design period of 15 years. Stage
construction shall not be permitted.
(b) Design Traffic
Notwithstanding anything to the contrary contained in this Agreement or the
Manual, the Contractor shall design the pavement for design traffic of 30 million
standard axles.
(iv) Reconstruction of stretches
6. Roadside Drainage
7. Design of Structures
(a) All bridges, culverts and structures shall be designed and constructed in accordance
with the provision to the cross- sectional features and other details specified herein.
(b) Width of the carriageway of new bridges and structures shall be as follows:
Sl. Bridge at km Width of carriageway and
No. cross-sectional features*
1 0+290 to 0+744 As per GAD & TCS
(c) The following structures shall be provided with footpaths:
Sl. Location at km Remarks
1 0+290 to 0+744 As per GAD & TCS
(d) All bridges shall be high-level bridges.
(e) 2 nos of 90mm dia DWC pipes conduits to be provided for future purpose in
footpath / crash barrier as directed by authority.
(f) Cross-section of the bridges at deck level for the Project Highway shall conform to
the typical cross-sections given herewith.
(a) Existing bridges to be refurbished as per GAD.
(i) The existing bridges at the following locations shall be refurbished.
Sl. Bridge location Salient details of Adequacy or
No. (km) existing bridge otherwise of
waterway, Remarks
clearance, etc*
1 0+290 to 0+744 5 Span of 76.25 m & Proposed GAD
2 Span of 36 m including
Well foundation Exiting details is
RCC Pier & Pier Cap attached
Balanced cantilever herewith
PSC Super Structure
C.W = 6.35 x 2 with
2.35 x 2 Footpath &
(b) Additional new bridges
New bridges at the following locations on the Project Highway shall be
constructed. GADs for the new bridges are attached in the drawings folder.
Sl. Location (km) Total length (m Remarks, if any
1 0+290 to 0+744 454 m On LHS & RHS of existing bridge
1) FRL should be maintain as shown in the GAD & FRL of existing abutments should
be maintained as per current site situation.
2) Hydraulic parameters shall be followed minimum as shown in GAD for design
3) Pile diameter and no of piles below each pier shown in GAD should be followed
4) Span arrangement & Type of proposed super structure should be as per GAD.
5) Iconic Façade work with structural steel is to be done on outer side of Parapet
/Railing with decorative programing lighting for entire bridge length as directed
by authority. The structural steel considered is 500 MT for iconic façade work .
Any increase or decrease as per approved design shall be payable/recoverable @
Rs 1,87,705/- per MT.
6) Coal Tar Epoxy paint in Pile cap, Anti carbonation paint in all concrete
components, Synthetic enamel paint in crash barrier/ parapet / median kerb etc
along with Structural Steel Girder metalizing and iconic façade painting of
structural steel to be done as directed by authority.
7) Notes/ any particular detail related to Bearing/ Exp Joint/ Steel Reinf etc to be
followed as mentioned in Tender GAD.
8) FE 550 D TMT Reinf with FEBC Coating to be used in all Foundation Elements and
Pier Element as mentioned in Tender GAD. Above Pier, FE 550 D TMT Reinf can
be used for Pier Cap and Super Structure and other structural components.
9) Super structure load test to be carried out in 4 nos (2 on each side) as per Codal
10) Deck Slab Thickness in Super Structure should be 250 mm as a minimum to be
11) Initial Pile load Test should be done in river portion only and to be conducted as
per Cyclic method.
Any variation in the above parameters which may be required as per detailed design
will not be considered as change of scope.
(e) Drainage system for bridge decks
An effective drainage system for bridge decks shall be provided as per requirement
& finalised by Authority.
(iv) Rail-road bridges
(v) Grade separated structures
(vi) Repairs and strengthening of bridges and structures and reconstruction of super structure
with additional foundation, sub structure
The existing bridges and structures to be repaired /strengthened, and the nature and extent
of repairs /strengthening required are given below:
Sl. Location of bridge Nature and extent of repairs /strengthening to be
No. (km) carried out
1 0+290 to 0+744 - Construction of Bund with cross drainage
arrangement for working in River Portion.
- Dismantling of Existing super structure with
Diamond saw cutting or advance technology.
- Carry out NDT test of existing Foundation & sub
- Scour protection of existing pier foundation as per
Hydraulic requirement with diaphragm wall or
equivalent method.
- RCC Jacketing of existing piers as per design
requirement and detail methodology along with
design need to be approved by Proof Checking
Consultant. Jacketing to be done with cathodic
- Reconstruction of pier cap of existing piers.
- Construction of New Foundation, Pile cap, Pier and
Pier cap as per attached GAD
- Construction of Superstructure with steel
composite girder with flexible wearing coat.
1. FRL should be maintain as shown in the GAD & FRL of existing abutments should be
maintained as per current site situation.
2. Hydraulic parameters shall be followed minimum as shown in GAD for design purpose.
Design Discharge : 13572.00 Cumecs
HFL : RL 49.000 m (Assumed)
3. Pile diameter shown in GAD should be minimum diameter.
4. Span arrangement & Type of proposed super structure should be as per GAD.
5. Coal Tar Epoxy paint in Pile cap, Anti carbonation paint in all concrete components, Synthetic
enamel paint in crash barrier/ parapet / median kerb etc along with Structural Steel Girder
metalizing and iconic façade painting of structural steel to be done as directed by authority.
6. Notes/ any particular detail related to Bearing/ Expansion Joint/ Steel Reinforcement etc to
be followed as mentioned in Tender GAD.
7. Demolition of Existing Bridge RCC / PSC / all type of Super Structure of all the spans and all
necessary structural/Non structural elements includes the methodology and design with
drawing and sequence of operation in detail for demolition of each element with all safety
precautions. Methodology and design shall be got proof checked by consultants and
Institution appointed by client. This shall include, dismantling of all components of Bridge
and sorting of the important dismantled material, all materials will be contractor’s property,
and stuff shall be disposed off as directed by Engineer with all leads and lifts etc. complete.
Electrical poles and all Sign boards are property of AMC and it will be deposited at AMC
store as directed by Engineer in charge.
8. All methodology, staging, scaffolding, platforms shall be got proof checked by consultants
and Institution appointed by client.
9. FE 550 D TMT Reinf with FEBC Coating to be used in all Foundation Elements and Pier
Element as mentioned in Tender GAD. Above Pier, FE 550 D TMT Reinf can be used for Pier
Cap and Super Structure and other structural components.
10. Super structure load test to be carried out in 2 nos as per Codal Requirement.
11. Deck Slab Thickness in Super Structure should be 250 mm as a minimum to be design.
12. Initial Pile load Test should be done in river portion only and to be conducted as per Cyclic
Any variation in the above parameters which may be required as per detailed design will not be
considered as change of scope.
(c) Overpasses/Underpasses and other structures
(vii) List of Major Bridges and Structures
The following is the list of the Major Bridges and Structures:
1 0+290 to 0+744 ( Refurbishment of Existing Bridge & New proposed
Bridges on Both side)
8. Traffic Control Devices and Road Safety Works
(i) Traffic control devices and road safety works shall be provided in accordance with the
provision of relevant Manual.
(ii) Specifications of the reflective sheeting. As per relevant Manual
9. Roadside Furniture
(i) Roadside furniture shall be provided in accordance with the provision of relevant Manual.
(ii) Overhead traffic signs
10. Compulsory Afforestation
11. Hazardous Locations
12. Special Requirement for Demolition work
12.1 Special Requirement for Existing bridge super structure demolition work.
1. The Contractor shall appoint well experienced, well established and well-equipped
Agency/Sub contractor for Demolition. The said appointed demolition agency/sub-
contractor shall have:
a. Work experience of at least 10 years for working with Government, Semi
Government, Local Authority, PSU or Public Listed Companies.
b. Should have works experience of dismantling of Flyover/Bridges of concrete by Jaw
Crusher/Diamond Cutting method.
c. Should have executed demolition of balanced cantilever bridge wherein a minimum
of one span should be executed over water.
13. Change of Scope
The length of Structures and bridges specified hereinabove shall be treated as an
approximate assessment. The actual lengths as required on the basis of detailed
investigations shall be determined by the Contractor in accordance with the Specifications
and Standards. Any variations in the lengths specified in this Schedule- B shall not constitute
a Change of Scope, save and except any variations in the length arising out of a Change of
Scope expressly undertaken in accordance with the provisions of Article
1. The shifting of utilities and felling of trees shall be carried out by the Contractor. The cost
of the same shall be borne by the Authority. The details of utilities are as follows:
Sr. Type of Utility Unit Quantity Location/stretch
A Electrical Utilities As per List given by AMC/ Authority
A1 Electrical Poles
A2 Electrical cables
A3 Transformers
B2 Water supply
C Felling of Tress
(See Clause 2.1)
Project Facilities
1. Project Facilities
The Contractor shall construct the Project Facilities in accordance with the provisions of this
Agreement. Such Project Facilities shall include:
(a) toll plaza[s];
(b) roadside furniture; (c) pedestrian facilities; (d) tree plantation;
(e) truck lay-byes;
(f) bus-bays and bus shelters; (g) rest areas; and
(h) Street light
2. Description of Project Facilities
Each of the Project Facilities is described below:
Sl. No. Project Facility Location Design Other essential
Requirements details
1 Streetlight with 0+000 to 0+800 Luminous level
Decorative Poles, Min 40 lux
bracket and 4000K
2 Footpath As per relevant
3 Road furniture IS/IRC code
5 Iconic Façade As per authority
with Decorative requirement
Note: Provide adequate details of each Project Facility to ensure their design and completion
in accordance with the project-specific requirements and the provisions of the Manual.
3. Project Site office & Vehicle Requirement
I. Contractor shall provide one fully loaded AC vehicle having minimum 1600 cc in good
condition along with licensee driver for Authority’s use / PMC’s use up to 3000 km per
month for 24 hours from date of commencement and up to completion of work (Including
extended time limit if any) having vehicle of model 2025 for site supervision of the work.
The cost of running, maintenance, fuel, driver’s salary, insurance with sole responsibility etc.
complete will be borne by the contractor. The vehicle shall be required at anywhere and at
site of bridge project department. The Vehicle will run throughout the period of contract
including Sundays/ holidays if required. The vehicle with driver must be deployed to AMC
within 15 days from the work order issued date till the completion period of the work.
Penalty for not providing vehicle shall be of Rs. 2000 per day. If vehicle is not demanded by
department, Rs. 35,000.00 per month will be deducted from RA bills. The vehicle will be
required for travel to and from between any places in Amdavad / Gandhinagar to any places
in Amdavad or as required by AMC.
Contractor shall provide additional four wheel vehicle transport facility for both
A.M.C/P.M.C, site engineer, if RMC plant is located more than 2 Km away from site and also
for any site related requirement.
II. The Contractor shall provide latest configuration 1 nos. of Laptop for AMC staff, Latest
Configuration 1 Desktop Computer for AMC, and latest Configuration 1 Desktop Computer
for PMC with required software and WI-FI at site office having 4G/5G internet facility for the
AMC’s Engineers and their nominees for the complete duration of the contract along with
facility of timely maintenance, and repairs if required. All above shall be properly maintained
by contractor. After completion of the project all above computers / laptop are property of
Configuration: CPU: Intel Core minimum i7 processor with 512 GB SSD, GPU: Intel UHD
RAM: 8GB/16GB, Storage: Up to 1TB, Display: minimum 12 inches touch screen and touch
pen support, touch screen pen Window-10, M S Office -2018, Internet total security Norton
or K7 or Quick heal . 4G/5G Wi-Fi plan minimum 100 GB per month (or 28 days) plan. Make:
Dell, HP or equivalent.
Penalty for not providing Laptop and computer : If Laptop and computer as above are not
provided by contractor till completion of Test Piles, then Rs. 50000/- will be deducted from
the 1st RA bill and then after that Rs 10,000/- will be deducted for each every month then
III. The Contractor shall establish and maintain a well-equipped “material testing
laboratory” and site office (2 No) AMC and PMC including A/c, latest configuration
computer with required software and internet facility, printers (provide pages daily as
per requirement), Tables for engineers, revolving chairs, cupboard with lock and key
facility, display boards, conference Table, safety equipment, and other required
furniture etc. all for the Engineers of AMC and their nominees for the complete duration
of the contract along with properly maintained clean, toilet facility and mineral water for
drinking facility at no cost to the Authority. If not provided, then penalized as decided by
engineer in charge.
(See Clause 2.1)
Specifications and Standards
1. Construction
The Contractor shall comply with the Specifications and Standards set forth in Annex- I of
this Schedule-D for construction of the Project Highway.
2. Design Standards
The Project Highway including Project Facilities shall conform to design requirements set out
in the following documents:
Standard specifications and code of practice for road bridges(General
Features of Design)
Standard specifications and code of practice for road bridges (Loads and
IRC:SP: 13-2004 Guideline for Small bridges & culverts
IRC: 78-2014 Guidelines for Foundation & Substructure
IRC: 83(Part II) Elastomeric Bearings
IRC: 83(Part III) Pot, Pot-cum-PTFE, Pin And Metallic Guide Bearings
IRC:112-2019 Code of practice for Concrete Road Bridges
IS: 13620-1993 Fusion Bonded Epoxy Coated Reinforcing Bars
IRC:SP:105-2015 Explanatory Handbook to IRC:
IRC:SP:114-2018 Guidelines for Seismic Design of Road Bridges
IRC 24- 2010 Steel Road Bridges (Limit State Method)
IRC 22- 2008 Composite Construction
IRC 37 – 2018 Guideline for Flexible Pavement Design
IRC 35-2015 Road Marking
IRC 58-2015 Guideline for Rigid Pavement
IRC 67- 2022 Guideline for Road Signages
RDSO Drawings / Railway Standards
MORT&H Ministry of Road Transport & Highway
Specifications and Standards for Construction
1. Specifications and Standards
All Materials, works and construction operations shall confirm to relevant IS/ IRC/ RDSO/
MORTH Specifications for Road and Bridge Works. Where the specification for a work is not
given, Good Industry Practice shall be adopted to the satisfaction of the Authority’s
2. Deviations from the Specifications and Standards
(i) The terms “Concessionaire”, “Independent Engineer” and “Concession Agreement” used in
the Manual shall be deemed to be substituted by the terms “Contractor”, “Authority’s
Engineer” and “Agreement” respectively.
(ii) [Notwithstanding anything to the contrary contained in Paragraph 1 above, the
following Specifications and Standards shall apply to the Project Highway, and for purposes
of this Agreement, the aforesaid Specifications and Standards shall be deemed to be
amended to the extent set forth below:]
(iii) Super structure with Steel Composite girder should be as per RDSO Specification &
fabrication, testing, launching to be done with RDSO approved vendor only. Required
certificates should be provided at the time of execution.
GENERAL SPECIFICATION FOR STREET LIGHT ELECTRICAL MATERIAL SPECIFICATION
1. Section Feeder Panel :
(a) STRUCTURE :
The Section pillar shall be of Double door type compartmentalized design so that circuit arc /
flash products do not create secondary faults and be fabricated out of high quality CRCA
sheet, suitable for Outdoor installation having doors on both the sides and if is operated
from front side.
All CRCA sheet steel used in the construction of Panels shall be 16 SWG thick and shall be
folded and braced as necessary to provide a rigid support for all components. Joints of any
kind in sheet steel shall be seam welded, all welding slag grounded off and welding pits
wiped smooth with plumber metal. The Section pillar shall be totally enclosed, completely
dust and vermin proof and degree of protection being not less than IP:55 to IS:2147. Gaskets
between all adjacent units and beneath all covers shall be provided to render the joints dust
proof. All doors and covers shall be fully gasketed with foam rubber and /or rubber strips
and shall be lockable.
A base channel of 40mmx 40mm x 5mm thick & 1300mm stand height shall be provided at
the bottom. Openings shall be provided for natural ventilation, but the said openings shall
be screened with fine weld mesh. Knock out holes of appropriate size and number shall be
provided in the Panels in conformity with the number, and the size of incoming and outgoing
conduits / cables. Alternately, the section pillar shall be provided with removable sheet steel
plates at bottom to drill holes for cable / conduit entry at site. The section pillar shall be
designed to facilitate easy inspection, maintenance and repair. The section pillar shall be
sufficiently rigid to support the equipment without distortion under normal and under short
circuit condition. They shall be suitably braced for short circuit duty.
The section piller erected with cement concrete foundation and 45 cms high bricks work and
finishing with plaster at all the four side of the panel, specifically on the base channel side as
shown in drawing or as instructed by engineer in charge. The tenderer has to supply
appropriate length of 100 Amp / 63 Amp (Respectively in feeder piller type A and type B)
capacity single core multi strand copper wire as load wire. (Tenderer has to consider the
length from supply company meter to SMTP.) There are two different sizes in Type – B
section piller.
(1) 750 L x 600 W x750 H (As per drawing)
(2) 1200 L x 400 W x 900 H (As per drawing)
Contractor has to supply as per department requirement. Department will inform for the
same as per actual site condition and requirement. There is a change in size of enclosure
only. Electrical component to be fitted inside are same for both sizes.
(b) Protection Class :
All the Outdoor Panels shall have protection class of IP:
The painting shall be one coat of primer and two coat of synthetic enamel colour.
(d) ELECTRICAL POWER AND CONTROL WIRING CONNECTION :
Terminal for both incoming and outgoing cable connections shall be suitable for 1100 V
grade, aluminium / copper conductor PVC insulated and PVC sheathed, armoured cable and
shall be suitable for connections of solderless sockets for the cable size as indicated on the
appended drawings / BOQ. Power connections for incoming feeders of the main Panels shall
be suitable for 1100 V grade aluminium conductor (PVC) cables. Both control and power
terminals shall be properly shrouded.
GI earth bars of size 25 mm 6 mm or 30 mm x 5 mm shall be provided in the section pillar for
the earthing. The frame work of the section pillar shall be connected to this earth. Provisions
shall be made for connection from this earth to the main earthing bar coming from the earth
pit on both side of the Section Pillar.
Labels shall be provided on all incoming and outgoing cable. Single line circuit diagram
showing the arrangements of circuit inside the section pillars shall be pasted on inside of the
panel door and covered with transparent laminated plastic sheet.
(g) NAME PLATE:
A paint bold letters shall be painted on the outside of section pillar.
Inside the feeder compartments, the electrical components, equipment’s, accessories like
switchgear, control gear, lamps, relays etc. shall suitably be identified by providing stickers.
Name plate shall be painted in English language, be acceptable.
(h) DANGER NOTICE BOARD:
The danger notice plate shall be affixed in a permanent manner on operating side of the
section pillar. The danger notice plate shall indicate danger notice in English and with a sign
of skull and bones.
The danger notice plate, in general, meet the requirements of local inspecting authorities.
Overall dimensions of the danger notice plate shall be 200 mm. wide x 150 mm. high.
The danger notice plate shall be made from minimum 1.2 mm. thick mild steel sheet and
after due pre-treatment to the plate, the same shall be painted white with vitreous enamel
paint on both front and rear surface of the plate.
The letters, the figures, the conventional skull and bones etc. shall be positioned on plate as
per recommendation of IS : 2551-1982.
The said letters, the figures and the sign of skull and bones shall be painted in signal red
colour as per IS.
The danger plate shall have rounded corners. Location of fixing holes for the plate shall be
decided to suit design of the Panels.
FUSE : Fuses shall be of 415 / 500 V and appropriate size of porcelain material.
The contactors shall meet with the requirements of IS :
The contactors shall have minimum making and breaking capacity in accordance with
utilization category AC3 duty. If the contactor forms part of a distribution board then a
separate enclosure is not required, but the installation of the contactor shall be such that it
is not possible to make an accidental contact with live parts.
Digital Astronomical TIMER :
Supplying & erecting approved make Digital Astronomical time switch having lithium cell
years operative and 48 hrs operate battery backup 1 channel day clock with 28 memory
programmes, suitable to operate on 240V +/- 5%, 16A with, floating contacts Minimum
switching setup time 1 minimum & LCD display. Also comprised permanent ON/OFF
switching. Programming switches & housed in fire proof thermoplastic enclosure &
transparent cover erected as required with necessary connection erected as directed.
Supplying & erecting approved make ELCBs / RCCBs conforming to IS: 12640 and having
sensitivity of 100 mA and Short Circuit withstand capacity of 6 KA and suitable for operation
on 3 phase and neutral 415V. Having characteristic of quick action & tripping with all
advance feature & do not incorporate any electronic component for following Max. rating
erected as directed.
At all reasonable times during production and prior to transport of the Panels to site, the
supplier / contractor shall arrange and provide all the facilities at their plant for inspection.
Testing of section pillar shall be carried out at factory and at site as specified in Indian
standards in the presence of consultant. The test results shall be recorded on a prescribed
form. The test certificate for the test carried out at factory and at site shall be submitted in
2 Medium Voltage Cables
This section shall cover supply of medium voltage cables.
The following standards and rules shall be applicable:
IS: 7098 XLPE insulated electric cables (heavy duty). IS: 1753Aluminium conductors
for insulated cables.
IS: 3961 Recommended current ratings for cables. IS: 8130Aluminium conductors for
insulated cables Indian Electricity Act and Rules.
2.3 Measurements
The cables will be measured in meters. The unit rate shall include cutting the cable into
required lengths, packing, loading, unloading, insurance, transportation, delivery to
stores/site as per work order, stocking in stores, testing of cables at stores etc. of medium
The medium voltage cables shall be supplied, laid, connected, tested and commissioned in
accordance with the drawings, specifications, relevant Indian Standards specifications,
manufacturer’s instructions. The cables shall be delivered at site in original drums with
manufacturer’s name, size, and type, clearly written on the drums.
The MV cables shall be cross linked polyethylene (XLPE) insulated PVC sheathed of
volts grade aluminium or copper conductor, armoured and unarmoured heavy duty,
conforming to IS : 7098 Part I IS : 1988 Part I. as asked for in the schedule of quantities.
2.5.1 All XLPE Aluminium/Copper Power cables shall be 1100 Volts grade, multi core constructed
as per IS : 7098 Part-I of 1988 as follows :
a. Stranded Aluminium /Copper conductor of high conductivity up to 4 mm.² size, the
conductor shall be solid multi strand above 4 mm.², conductors shall be
concentrically stranded as per IEC:
b. Cores laid up
c. The inner sheath should be bonded over with thermo-plastic material for protection
against mechanical and electrical damage.
d. Armoring should be provided over the inner sheath to guard against mechanical
damage. Armouring should be Galvanized steel wires or galvanized steel strips. (In
single core cables used in A.C. system armouring should be non-magnetic hard
aluminium Wires/Strips. Round steel wires should be used where diameter over the
inner sheath does not exceed 13 mm; above 13 mm flat steel armour should be
used. Round wire of different sizes should be provided against specific request.)
e. The outer sheath should be specially formulated heat resistant black PVC compound
conforming to the requirement of type ST2 of IS: 5831-1984 extruded to form the
2.5.2 Conductor shall be of electrolytic Aluminium/Copper conforming to IS : 8130 and are
compact circular or compact shaped.
2.5.3 Insulation shall be of XLPE type as per latest IS general purpose insulation for maximum
rated conductor temperature 70 degree centigrade.
2.5.4 In Inner sheath laid up cores shall be bonded over with thermoplastic material for protection
against mechanical and electrical damage.
2.5.5 Insulation, inner sheath and outer sheath shall be applied by extrusion and lapping up
2.5.6 Armouring shall be of galvanized steel wire/ strip.
Galvanized steel flat strip / round wires applied helically in single layers complete with
covering the assembly of cores.
For cable size up to 25 Sq. mm: Armour of 1.4 mm dia. G.I. round wire
For cable size above 25 Sq. mm: Armour of 4 mm wide 0.8 mm thick G.I. strip
2.5.7 Repaired cables shall not be used.
2.5.8 Current ratings of the cables shall be as per IS:
2.5.9 The XLPE insulated cables shall conform to latest revision IS read along with this
specifications. The Conductor shall be stranded Aluminium/Copper circular/ sector shaped
and compacted. In multi core cables the core shall be identified by red, yellow, blue and
black colouring of insulation as following.
Core identification:
Two cores : Red and Black
Three cores : Red, Yellow and Blue
Four core : Red, Yellow, Blue and Black
Single core : Green, Yellow for earthing Black shall always be used for neutral.
2.5.10 The XLPE insulated 1100 Volts grade power cables shall conform to latest IS and shall be
suitable for a steady conductor temperature of 70 degree centigrade. The conductor shall be
stranded Aluminium/Copper as called for in the Schedule of quantities. The outer sheath
shall be as per the requirement of type ST-2 of IS: 5831 of
2.5.11 The cables shall be suitable for laying in racks, ducts, trenches, conduits and underground
buried installation with uncontrolled back fill and chances of flooding by water.
2.5.12 Progressive automatic in line sequential marking of the length of cables in meters at every
one meter shall be provided on the outer sheath of all cables.
2.5.13 Cables shall be supplied in non returnable wooden drums as per IS: 10418. Both ends of the
cables shall be properly sealed with PVC/Rubber caps so as to eliminate ingress of water
during transportation, storage and erection.
2.5.14 The product should be coded as per IS: - 7098 Part-I as follows:-
Aluminium Conductor A
XLPE Insulation 2X
Steel round wire armour W
Steel strip armour F
Steel Double round wire armour WW
Steel Double strip armour FF
Non-magnetic (Al.) round wire armour Wa
Non-magnetic (Al.) strip armour Fa
PVC outer sheath Y
All cables shall be adequately protected against any risk of mechanical damage to which
they may be liable in normal conditions of handling during transportation, loading,
The cable shall be supplied in single length i.e. without any intermediate joint or cut unless
specifically approved by the client.
The cable ends shall be suitably sealed against entry of moisture, dust, water etc. with cable
compound as per standard practice.
3.1 Finished Cable Tests At Manufacturer’s Works
The finished cables shall be tested at manufacturer’s works. Following routine tests for each
and every length of cable and copy of test results shall be furnished for each length of cable
along with supply. If specified, the cables shall be tested in presence of clients'
representative / PMC / Consultant
a. Voltage test
Each core of cable shall be tested at room temperature at 3 KV A.C. R.M.S. for
duration of 5 minutes.
b. Conductor resistance test
The D.C. Resistance of each conductor shall be measured at room temperature and
the results shall be corrected to 20° c. to check the compliance with the values
specified in IS 8130 - 1976. Prior to dispatching cables and at the time of delivering
the cables at stores, following tests shall be carried out:-
Insulation Resistance test between phases and phase to Neutral and phase to earth
Continuity test of all the phases, neutral and earth continuity conductor
Sheathing continuity test
Earth resistance test of all the phases and neutral
All tests shall be carried out in accordance with relevant Indian Standard Code of
practice and Indian Electricity Rules. The Vendor shall provide necessary
instruments, equipments and labour for conducting the above test and shall bear all
expenses in connection with such tests. All tests shall be carried out in the presence
of the client / PMC / Consultant and results shall be recorded in the prescribed
3.2 Cable Marking Embossing On Outer Sheath
The outer sheath shall be legibly embossed with following legend:
ELECTRIC CABLE: 1100 V, SIZE: 3.5 C x mm ².
Manufacturer’s Name & year of manufacturing.
3.3 Sealing, Drumming & Packing
After tests at the manufacturer’s works, both ends of the cable shall be sealed to prevent
the ingress of moisture during transportation and storage.
Cable shall supply in length of 500 ± 10% meters on packed non-returnable drums of
sufficiently sturdy construction.
Cables of length more than 250 meters shall also be supplied on non-returnable drums. The
spindle hole shall be 110 mm minimum diameter.
Each drum shall bear on the outside flange, legibly and indelibly in the English literature, a
distinguishing number, the manufacturer’s name and particulars of the cable i.e. voltage
grade, length, conductor size, cable type, insulation type and gross weight shall also be
clearly visible. The direction for rolling shall be indicated by an arrow. The drum flange shall
also be marked with manufacturer’s name and year of manufacturing etc.
4 LED LIGHT FIXTURE SPECIFICATION
The LED Street light system will have to meet the following Specifications :
4.1 Electrical Specifications :
Parameter - Value
Input Voltage - AC 120 to 260V
Input Frequency - 50 Hz+/ 3Hz
Power Factor - ≥
Usage hours - Dusk to dawn (12 hours)
Distortion Current - <10%
Voltage - <3%
Working humidity - 10% to 90% RH
4.2 LED Luminaire Specification :
Life expectancy to the product at least 50,000 hrs maintaining lumen output at 70% or above
compared with the luminaries initial output.
Colour Temperature - 4000K (± 5%) (as per Arch / Consultant /
Client selection)
Colour rendering index - >80%
Lumen/ Watt (luminary) - Minimum 130 Lumens per watt
Housing - High quality housing such as pressure die cast
aluminium with Smooth finish powder coated for
better environmental protection.
Efficiency of Driver - >80%
Junction temp - <75˚c
Uniformity ratio - >0.4
Maintenance factor -
Index of protection level - IP
LED lens material - Poly Carbonate
Protection - Over heat, overload, short circuit, HV surge up to
LED chip - Philips, Cree, OSRAM, Nichia
Driver current - ≤ 750mA
LED Driver type - Constant current
Beam Angle - 135˚ Horizontal / 80˚ Vertical
Power protection - Electrical Disconnector (When the fitting opens
power should be disconnected) in Street Light fitting
Opening - Tool less opening in street Light fitting
Provision for NEMA Socket
Note : Efficacy of the system should not allow below 130 lumens /watt and wattage specified
indicative maximum for the said lumens output, No negative tolerance allowed and no
power loading shall be consider for this tender.
4.3 Particulars and Details to be submitted by the in order to properly assess and due diligence
submissions, the proponent should provide following information on the quality and
photometric of proposed luminaries.
4.3.1 General description :
Following details of the proposed luminaire shall be submitted as per Annexure – I
1. Luminaire manufacturer
2. Luminaire Model name
4. Stated lumen output
6. Lumen output ( as per LM 79 report, mentioning current in MA)
7. Lumen deprecation (L70 mentioning Temperature in OC and current in mA)
8. Correlated color temperature (CCT)
9. Color rendering index (CRI)
4.3.2 Electrical Specifications :
Electrical ratings of the proposed luminaire for the following criteria shall be submitted in
1. Voltage range or rating on single Phase AC
2. Amperage range or rating
3. Frequency Range
4. Power Factor
5. Total harmonic distortion
6. Working humidity
7. Working temperature
8. ingress protection
9. Electrical connector
10. Ability to operate under the condition of unpredictable voltage variations. submit
the information.
4.4 LED Chip and driver information: details to be filled up by bidder :
LED Chip and driver information of the proposed luminaire product for the following criteria
in Annexure .III
1. Name of the LED Chip manufacturer
2. LED chip model name and number
3. LM 80 report from the LED chip manufacturer on the lumen depreciation
characteristics of the specific LED Chip employed in the proposed luminaire product
4. Junction temperature (OC)
5. Information on drivers employed in the proposed luminaire
6. Name of the manufacturer
7. Model name and number.
8. Expected lifetime of the LED driver used in the proposed luminaire
9. Estimated cost of driver replacement by your company, including component and
installation cost.
10. LED Driver should be BIS approved only, PF should be greater than 0.95, THD should
be less than 10%
4.5 Bidder shall have to offer the following minimum warranty:
LED Chip and driver information of the proposed luminaire product for the following criteria
in Annexure .III
(a) Bidder should provide 25% Extra ( of the supplied nos. of fittings) ballast / driver &
SPD to AMC, The bidder should consider the cost of the same in the tender while
(b) Provide a five year on-site replacement warranty covering warranty covering
material fixture finish and workmanship, to include transportation, removal, and
installation of new products.
(c) provide five year replacement warranty for defective or non -starting LED source
assemblies and all drivers.
(d) Provide a five year warranty for luminaries exhibiting inadequate lumen
maintenance at the end of the warranty period in compliance with the following
L 70 lifetime claim Min. Lumen maint @ 5Year.
(e) A luminaire dirt depreciation (LDD) factor may be included in the above calculation,
such a value be determined by mutual agreement between AMC and the
manufacturer, consistent with local ambient environmental conditions and practice.
(f) A monitoring program to implement 20.5(c) above will be determined by mutual
agreement between AMC and the Bidder. The costs of the monitoring program over
the five year warranty period will be borne by the bidder, unless agreed otherwise
by AMC and the Bidder.
(g) The bidder shall provide 10-year light fitting and it’s all component availability from
OEM to client and should be on OEM letter head with NSM sign and OEM Stamp.
Also, the same should be given on Rs. 300 Stamp paper from OEM to Client and
Company should give the letter for authorized signatory.
4.6 Photometric information:
The proponent needs to submit the following photometric
1. photometric modeling results, preferably within a LM79 report, from an
independent accredited laboratory showing generic candlepower traces and iso
foot-candle plots for the proposed luminaries product.
2. Photometric information, data and diagrams that model the luminance flux
distribution of the proposed luminaire referencing the site characteristics given in
section 20.5 above. The proponent should consider the following during the
modeling exercise.
3. Such modeling should verify that the proponent’s proposed luminaire will meet
National Lighting Code , which specifies average luminance (Eavg) and uniformity (
Emin /Eavg) for roads at the above sites. As specified in table
4. Use industry accepted, standardized software like Dialux for the above moduling
while modeling, a maintenance factor of 0.8 should be used.
4.7 Lumen maintenance statement :
1. The proponent must submit a lumen maintenance statement that estimates how
many operating hours can be expected from the proposed luminaire product until
its light output declines to 70% of its initial output (L70) given the specific climactic
character, including extremes of temperature and high humidity, associated with the
local condition.
2. The lumen maintenance statement should also clearly explain that how or what
method was used to determine the rated life time.
3. Describe in details the thermal management: how the physical and thermal design
of the luminaire will prevent the LED chips from overheating on extremely hot days.
4.8 Luminaire Specifications - other:
The proponent shall provide information and certifications
1. Luminaries : General Requirements, Tests, and Certifications specified in IS
2. Electrical safety certifications such as ISI and CII.
3. Ingress protection certification IP
4.9 Lighting Level Criteria :
Luminaries : Maintanance Factor :
Lux Levels, Uniformity should be achieved on the Road as under :
Average Lux Level Uniformity : Min / Uniformity : Min /
Carriage Way 35 – 40 Lux 0.4
Pedestrian pathway 15 – 20 Lux 0.3
The computerized lighting design has to be practically proven for ‘initial lighting levels‘ by installing
at least six poles at a stretch on the actual project site before the award of the order, failing which
the proposal should be rejected.
Practical method for lighting measurement should be as per latest IS, IEC and NEC code and as per
Consultant / Engineer in charge.
Power consumption calculation should be provided & has to be proved on site also.
All the documents, details and calculation provided for the luminaire should be duly signed and
stamped by the OEM with authorized signatory letter from OEM as well as from bidder
The scope of this specification covers the manufacture, transport, installation, testing and
commissioning of Poles, including the Civil Foundation Works with all items required for the
safe and efficient operation and maintenance of the lighting system, whether explicitly
stated in the following pages or not, shall be included by the Contractor.
5.2 LIGHTING POLES :
The street light poles shall be fabricated from heavy duty steel tubes / Steel Sheets/ Cast
Iron conforming to IS:1239 and hot dip galvanized or painted as specified.
The street light pole shall be fabricated as per the details and design.
The street light poles shall have base plate, inbuilt Junction Box for street light and
advertisement signage, and necessary fixture mounting bracket at top.
The Junction box shall provide easy access to a multiway connector and MCB, to be mounted
inside the pole. The access shall be specially fabricated with adequate reinforcement and
weather protection gasket to prevent ingress of moisture and vandal proofed.
Poles shall have large diameter entries for incoming and outgoing cables and two earth studs
& Spiral earthing.
The poles fabricated shall conform to the drawings and where such drawing is not available,
the contractor shall make such drawing and have it approved before fabricated.
The pole shall house a multi way type terminal block and MCB as shown on the drawings.
Poles shall have concrete coping.
5.2.1 Octagonal Poles / Cast Iron Decorative Poles
The Poles shall be designed to withstand the maximum wind speed of 160 km / hr. The top
loading i.e. the weight and the area of top luminaries are to be considered to calculate
maximum deflection of the pole and the same shall meet the requirement of BS: 5649 Part
The pole shaft shall have design cross section with single longitudinal welding. There shall
not be any circumferential welding. The welding of pole shaft shall be done by Submerged
Arc Welding (SAW) process.
All pole shafts shall be provided with the rigid flange plate of suitable thickness with
provision for fixing 4 foundation bolts. This base plate shall be fillet welded to the pole shaft
at two locations i.e. from inside and outside. The welding shall be done as per qualified
The Poles shall have door of minimum size of 250 mm X 65 mm at the elevation of 1000 mm
from the Base plate. The door shall be vandal resistance and shall be dust proof to ensure
safety of inside connections. The door shall be flush with the exterior surface and shall have
suitable locking arrangement. There shall also be suitable arrangement for the purpose of
earthing. Also, pole should have suitable separate Junction box for advertisement
The pole shall be adequately strengthened at the location of the door to compensate for the
loss in section.
Octagonal Poles : Confirming to ST 35 grade.
Base Plate : Fe 410 conforming to IS 226 / IS
Foundation Bolts : 6.8 Gr. As per IS
Coating : coating thickness 70 micron
The welding shall be carried out confirming to approved procedures duly qualified by third
party inspection Agency / PMC. The welders shall also be qualified for welding the octagonal
The Poles up to the length of 12 meters shall be in single piece with single longitudinal
welding joint. There shall not be any circumferential weld joint. However, the pole with
length of 12 meters and above shall be of 2 sections with telescopic fitment with minimum
overlap of 1.5 times the diameter.
The manufacturing unit shall have In house pole testing facility for validation of structure
design data, The pole testing facility shall be as per BSEN 40-2.1&
The poles shall be hot dip galvanized as per BSEN ISO 1461 standards with average coating
thickness of 70 micron. The galvanizing shall be done in single dipping.
The Poles shall be bolted on a pre-cast foundation with a set of four foundation bolts for
greater rigidity.
The galvanized double / single arm shall be supplied along with the Poles for installation of
the luminaries.
The system shall be TNS with four wire supply system (R,Y,B,N and 2 Nos. E) brought from
the main L T Panel. All the non-current carrying metal parts of electrical installation and all
metal conduits trunking, cable sheaths, switchgear, distribution panels, light fittings and all
other parts made of metal shall be bonded together and connected by means of specified
earthing conductors to an efficient earthing system. All metal work such as pipe lines, ducts,
cable trays, stair case railing etc shall be bonded to earth. All earthing shall be in conformity
with IS:3043 1987, and the basic system of earthing shall be TNS.
6.2 EARTHING CONDUCTORS
Earthing conductors shall be of copper / GI as mentioned in schedule of quantities and shall
be protected against mechanical injury and corrosion.
6.3 SIZING OF EARTHING CONDUCTORS
The cross sectional area of earthing conductor shall not be smaller than half of the largest
current carrying conductor subject to an upper limit of 80 Sq.mm. If the area of the largest
current carrying conductor or bus bar exceeds 160 sq.mm then two or more earthing
conductors shall be used in parallel, to provide at least half the cross sectional area of the
current carrying conductor or bus bars. All fixtures, outlet boxes, junction boxes and power
circuits upto 15 amps shall be earthed with PVC insulated copper wire.
All 3 phase switches and distribution panels upto 60 amps rating shall be earthed with 2 Nos.
distinct and independent 4 mm dia copper / GI wires. All 3 phase switches and distribution
panels upto 100 amps rating shall be earthed with 2 Nos. distinct and independent 6 mm dia
copper / GI wires. All switches, bus bar, ducts and distribution panels of rating 200 amps and
above shall be earthed with minimum of 2 nos separate and independent 25 mm x 3 mm
copper / GI tape.
6.4 CONNECTION OF EARTHING CONDUCTORS
Main earthing conductors shall be taken from the earth connections at the main L T panel to
an earth electrode with which the connection is to be made. All joints in tapes shall be with
four rivets and shall be brazed in case of copper and by welding bolting in case of GI, wires
shall be connected with crimping lugs, all bolts shall have spring washers. Sub- mains
earthing conductors shall run from the main distribution panel to the sub distribution panel.
Final distribution panel earthing conductors shall run from sub-distribution panel.
Circuit earthing conductor shall run from the exposed metal of equipment and shall be
connected to any point on the main earthing conductor, or its distribution panel. Metal
conduits, cable sheathing and armouring shall be earthed at the ends adjacent to
distribution panel at which they originate, or otherwise at the commencement of the run by
an earthing conductor in effective electrical contact with cable sheathing. Where equipment
is connected by flexible cord, all exposed metal parts of the equipment shall be earthed by
means of an earthing conductor enclosed with the current carrying conductors within the
flexible cord. Switches, accessories, lighting fitting etc. which are rigidly secured in effective
electrical contact with a run of metallic conduit shall not be considered as a part of the
earthing conductor for earthing purposes, even though the run of metallic conduit is
The plate/pipe electrode, as far as practicable, shall be buried below permanent moisture
level but in no case not less than 2.5 M below finished ground level.
The plate/pipe electrode shall be kept clear of the building foundation and in no case, it shall
be nearer by less than 2 M from outer face of the respective building wall / column.
The plate electrode shall be installed vertically and shall be surrounded with 150 mm. thick
layers of Charcoal dust and Salt mixture.
19 mm. dia. G.I. pipe for watering, shall run from top edge of the plate / pipe electrode to
the mid level of block masonry chamber.
Top of the pipe shall be provided with G.I. funnel and screen for watering the earth / ground
through the pipe.
The funnel with screen over the G.I. pipe for watering to the earth shall be housed in a block
masonry chamber as shown in the drawing.
The masonry chamber shall be provided with a Cast Iron hinged cover resting over the Cast
Iron frame which shall be embedded in the block masonry.
Construction of the earthing station shall in general be as shown in the drawing and shall
conform to the requirement on earth electrodes mentioned in the latest edition of Indian
Standard IS : 3043, Code of Practice for Earthing Installation.
The earth conductors (Strips / Wires copper / Hot dip G.I.) inside the building shall properly
be clamped / supported on the wall with Galvanised Iron clamps and Mild Steel Zinc
Passivated screws / bolts. The conductors outside the building shall be laid atleast 600 mm.
below the finished ground level.
The earth conductors shall either terminate on earthing socket provided on the equipment
or shall be fastened to the foundation bolt and / or on frames of the equipment. The
earthing connection to equipment body shall be done after removing paint and other oily
substances from the body and then properly be finished.
Over lapping of earth conductors during straight through in joints, where required, shall be
of minimum 75mm. long.
The earth conductors shall be in one length between the earthing grid and the equipment to
EARTH LEADS AND CONNECTIONS :
Earth lead shall be bare copper or Galvanised steel as specified with sizes shown on
drawings. Copper lead shall have a phosphor content of not over 0.15 %. G.I strips buried in
the ground shall be protected with bitumen and hessian wrap or polythene faced hessian
and bitumen coating. At road crossing necessary Hume pipes shall be laid. Earth lead run on
surface of wall or ceiling shall be fixed on saddles so that strip is at least 8 mm away from
the wall surface.
The complete earthing system shall be mechanically and electrically bonded to provide an
independent return path to the earth source.
6.5 PROHIBITED CONNECTIONS
Neutral conductor, sprinkler pipes, or pipes conveying gas, water or inflammable liquid,
structural steel work, metallic enclosures, metallic conduits and lightning protection system
conductors shall not be used as a means of earthing an installation or even as a link in an
earthing system. The electrical resistance measured between earth connection at the main L
T panel and any other point on the completed installation shall be low enough to permit the
passage of current necessary to operate or circuit breakers, and shall not exceed 1 ohm. All
switches carrying medium voltage shall be connected with earth by two separate and
distinct connections. The earthing conductors inside the building wherever exposed shall be
properly protected from mechanical injury by running the same in G I pipe of adequate size.
The overlapping in strips at joints where required shall be minimum 75 mm. The joints shall
be riveted and brazed in case of copper and by welding / bolting in case of GI in an approved
manner. Sweated lugs of adequate capacity and size shall be used for termination of all
conductor wires above 6 sq.mm size. Lugs shall be bolted to the equipment body to be
earthed after the metal body is cleaned of paint and other oily substances and properly
tinned. Equipotential bonding of all metallic structures shall be done.
The following must always be ensured in earthing system.
o All earths must be interconnected at the earth pits. This includes generator neutrals,
transformer neutrals, transformer body, lightning protection system earths, UPS earths
o Extraneous conductive parts such as gas pipes, other service pipes and ducting risers and
pipes of fire protection equipment and exposed metalic parts of the building structure.
6.7 RESISTANCE TO EARTH
The resistance of earthing system shall not exceed 1 ohm.
6.9 SPECIFICATION FOR HOT DIP GALVANIZING PROCESS FOR MILD STEEL USED FOR
EARTHING FOR ELECTRICAL INSTALLATION
GENERAL REQUIREMENTS
I. Quality of Zinc
Zinc to be used shall conform to minimum Zn 98 grade as per requirement of IS:209-
II. Coating Requirement
Minimum weight of zinc coating for mild steel flats with thickness upto 6 mm in
accordance with IS:6745-1972 shall be 400 g/sqm.
The weight of coating expressed in grams per square metre shall be calculated by
dividing the total weight of Zinc by total area (both sides) of the coated surface.
The Zinc coating shall be uniform, smooth and free from imperfections as flux, ash
and dross inclusions, bare patches black spots, pimples, lumpiness, runs, rust stains
bulky white deposits, blisters.
Mild steel flats / wires shall undergo a process of degreasing pickling in acid, cold
rinsing and then galvanizing. Jointing of earthing tape shall be by welding. All joints
and cut ends shall be properly painted with aluminium paint.
6.10 Chemical Earthing System – specification
Earthing system should offer a resistance of less than 2 ohms throughout the year. In places
where Soil resistivity is more, total length of the earthing rod has to be increased by adding
1m length rods (one over the other) to achieve low and stable resistance value. In rocky
places ,multiple earth rods have to be installed and inter-connected to get the required
Solid Copper coated rods are recommended as earth electrode than a pipe due to the fact
that solid rods have much longer life and can be easily driven by electric/hydraulic hammers.
Copper has much longer life than all other materials as explained in IS 3043. Deep driven
rods provide more stable and less Earth Resistance. Doubling the length of the rod will
reduce earth resistance up to 40 %, whereas doubling the diameter will reduce the
resistance by only 10 %, but may increase the cost by 4 times.Lower earth resistance can
also be achieved by increasing the number of earth rods. E.g. 40 % reduction in earth
resistance is possible if the rods are increased from 1 to 2. The minimum spacing between
earth pits should be equal to TWICE the length of the rod. Increasing the spacing between
earth pits also reduces the earth resistance significantly.
Need and importance of Earthing:
Human and Personnel safety.
Equipment protection.
Provides low impedance path for fault currents.
To ensure good quality power.
Protection against lightning and transient currents, noise reductions, Limitation of EMI.
IEC 60364 : Low Voltage Electrical Installations-Part 5-54: Selection & Erection of
Electrical equipment- Earthing arrangement & protective conductors.
IEC 62561 : Lightning Protection system Components. Part 1 to
IEC 62305 : Protection Against Lightning –Part 3: Protection of structures & life
Hazards IS 2309: Code of practice for protection of buildings & allied
structures from lightning IS 3043: Code of practice for earthing.
Components of earthing system:
Earth electrode
Connectors and fasteners
Inspection Chamber (Earth Pit)
Earth enhancement material
Connecting cable/tape/strip with accessories.
Earth Electrode:
Copper coated Solid steel Rods shall be made of high tensile low carbon steel rod,
molecularly bonded with 99.9% electrolytic copper with minimum coating thickness of
microns as per IEC 62561 part -2: Requirement for Conductor & Earth Electrodes. The length
of the earth rod shall be 3 meter so that driving into the ground is easier (scaffolding is not
necessary). For dry areas, length of the rods can go up to several meters by driving the rods
one over the other. Earth rods should be of diameter 20 mm. These rods should have facility
to couple with hammer inserts so that they could be driven easily with an electric/hydraulic
hammer. Additional rods should be added without external couplers. The earth rods should
have peg & bore arrangement so that additional rods are added without external couplers.
Interconnecting Strips / Earthing Conductor: Copper coated steel strips / tapes should be
used to interconnect different earthing rods as well as horizontal earthing (Ring earthing).
These strips should have a coating thickness of minimum 70 microns.
Couplers / Connecting clamps:
Connectors/fasteners for connecting Electrode with Earthing conductor/strip should be of
Stainless Steel as it is compatible with all other materials viz Copper, GI etc. Fasteners should
be made of Stainless steel
Inspection Chamber :
Should have an inner dimension of 250 mmX 250 mm X 250 mm made of FRP material. Flush
Mounted, removable cover of the earth pit should be able to withstand moderate loads. The
area inside the inspection chamber should be such that, the UNIVERSAL CLAMP/EBB/Bus
bars not too deep inside the inspection chamber or projecting out of inspection chamber.
The chamber should have facility for marking earth resistance and latest testing date by
paint at the cover and previous recorded values inside the cover.
Earth Enhancement material:
This is a conductive mineral compound to provide low resistance to the earth termination
system. Earth enhancing compound should contain minerals which in normal use is reliable
and without creating any hazards to persons and the surroundings. The material shall be
chemically inert to sub soil and shall not pollute the environment. It shall provide a stable
environment in terms of physical and chemical properties and exhibit low resistivity. It shall
not be corrosive to the earth electrode itself. The material should have a resistivity less than
Dig a pit of 1m* 1m * 0.5m depth.
At the center of the pit, Earth rod of 3 m has to be hammered electrically or hydraulically.
The number of Earth rods can be added one over the other to get the required length.
Fill the dug up area with Earth enhancing compound mixed with water & soil to get slurry
form in such a way that the earth inspection pit is in flush with the earth surface.
Connect the connectors with fasteners & connect the down conductors. Close the lid of
earth inspection pit.
Inspection & maintenance:
Maintenance of the earthing system has to be done at least once in 6 months, preferably
before the monsoon period and a record should be maintained to verify earthing system
conductors and components, electrical continuity, earth resistance value, re-fastening of
components viz-nuts, bolts etc.
The entire earthing installation shall be tested as per requirements of Indian Standard
Specification IS: 3043. The following earth resistance values shall be measured with an
approved earth megger and recorded.
1) Each earthing station
2) earthing system as a whole
3) Earth continuity conductors
4) Earth conductor resistance for each earthed equipment shall be measured which
shall not exceed 5 ohm in each case.
Measurements of earth resistance shall be carried out before earth connections are made
between the earth and the object to be earthed.
All tests shall be carried out in presence of the client’s representative/ PMC / Consultant.
7 ERECTION, TESTING & COMMISSIONING OF ELECTRICAL INSTALLATIONS
The intent of this specification is to define the requirements for the installation, testing and
commissioning of the electrical system like M.V panels, Cables, earthing network and
External lighting, Light fixtures etc. Requirement of this project shall be as specified in bill of
quantities / approved drawings / general specifications or as per the battery limits fixed by
the owner / consultant.
8.1 The work shall be carried out in the best workman like manner in conformity with this
specification, the relevant specification / codes of practice of the Indian Standards
Institution, approved drawings and the instructions issued by the authorised representative,
from time to time. Some of the relevant Indian Standards are listed elsewhere in this tender
The following standards and rules shall be applicable :
STANDARD NO. PARTICULAR
IS 1913 General and safety requirements for light fitings.
IS 1944 Code of practice for lighting public thoroughfares.
IS 3528 Water proof electric lighting fittings.
IS 3553 Water tight electric lighting fittings
IS 1239. M.S. tubular and other wrought steel pipe fittings.
IS 10322 Luminaire for street lighting
( Parts / Sec. 3 )
Indian Electricity Act and rules.
All codes and standards mean the latest. Where not specified otherwise the installation shall
generally follow the Indian Standard Code of Practice or the British Standard Code of
Practice in the absence of Indian Standard.
8.2 In addition to the standards mentioned in above, all works shall also conform to the
requirement of the following :
Indian Electricity Act and Rules framed thereunder.
Fire Insurance Regulations.
Regulations laid down by the Chief Electrical Inspector of the State / State Electricity
Board / Union Territory.
Regulations laid down by the Factory Inspector of the State / Union Territory.
Any other regulations laid down by the local authorities.
Installation & operation manuals of original manufacturers of equipment.
9 EQUIPMENT AND ACCESSORIES SPECIFICATIONS:
This defines specifications and requirements mainly for the equipment and accessories,
which are generally supplied by the erection agency.
All materials, accessories, consumable to be supplied by the contractor shall be selected
from the list of specified make in consultation with the Client/Architect/Consultant without
any extra cost and shall conform to the specification given here under. The equipment shall
be manufactured in accordance with current Indian Standard specifications wherever they
exist or with the BS or NEC specifications, if no such IS standards are available. In the
absence of any specification & if any item not mentioned in the make of the material & any
where else, the materials shall be as approved by the owner / consultant in writing manner.
All similar materials and removable parts shall be uniform and interchangeable with one
another. Makes of bought out items selected by the contractor must be furnished by him as
per the pro forma given in elsewhere in this tender document. Tenderer should have to
specify the list of makes considered in the tender while quoting the rates in the tender, in
covering letter of separate letter enclosure. However, the final decision for accepting make
specified by tenderer would be of client/Architect/Consultants.
Within a week of work order, the contractor shall submit the sample of each item /
above mentioned approved make for the approval of the Client/Architect/Consultant.
Bidder to submit authorization letter for supply of light fixtures and lamps only from regional
sales manager/director-sales of lighting company with duly signed and stamped with
mentioning the name of project, total quantity, type of light fitting etc. The letter should be
submitted with valid proof and original documents to consultant. These authorizations are
to be obtained prior to supply of material and should be approved by electrical
consultant/architect/Client.
The contractor shall make his own arrangement for safe transportation of all the items to
the erection site and also carry out complete loading / unloading during transportation.
Equipment shall not be removed from packing cases unless the floor has been made ready
for installing them. The cases shall be opened in presence of the client / consultant or his
authorised representative. The empty packing cases shall be returned to the stores and any
document if found with the equipment shall be handed over to the client's representative.
Any damage or shortage noticed shall be reported to the client / consultant in writing
immediately after opening of packing cases.
10.1 Section feeder Pillar : TESTING :
Before electrical panel is energised, the insulation resistance of each bus shall be measured
from phase to ground. Measurement shall be repeated with circuit breakers in operating
positions and contacts open.
Before switchgear is energised, the insulation resistance of all control circuits shall be
measured from line to ground.
The following tests shall be performed on all circuit breakers during erection.
Contact alignment and wipe shall be checked and adjustment where necessary in
accordance with the breaker manufacturer’s instructions.
Each circuit breaker shall be drawn out of its cubicles, closed manually and its insulation
resistance measured from phase to phase and phase to ground.
All adjustable direct acting trip devices shall be set using values given by the consultant/
The dielectric strength of insulating oil wherever applicable, shall be checked.
Before switchgear is energised, the following tests shall be performed on each circuit
breaker in its test position.
Close and trip the circuit breaker from its local control switch push button or operating
handle. Switchgear control bus may be energised to permit test operation of circuit
breaker with A.C. closing with prior permission of the client / consultant.
Test tripping of the electrically operated circuit breaker by operating mechanical trip
Test proper operation of circuit breakers latch, check carriage limit switch if provided.
Test proper operation of lockout device in the closing circuit. Wherever provided by
simulating conditions which would cause a lockout to occur.
Trip breaker either manually or by applying current or voltage to each of its associated
protective release.
Before switchgear is energised, the tests covered above shall be repeated with each
breaker in its normal operating position.
Capacitor banks shall be tested as per manufacturer’s instructions. In addition, test for
output and/or capacitance, insulation resistance test and test for efficiency of discharge
device shall be carried out.
All electrical equipment alarms shall be tested for proper operation by causing alarms to
sound under simulated abnormal conditions.
(c) PROFORMA FOR PCC, MCC, DB, CONTROL PANEL TEST :
Circuit breaker or contactor module designation / bus no.
Insulation resistance test (contacts open, breaker racked in position)
a) between each phase of bus : Mega ohm
b) between each phase and earth : Mega ohm
c) DC and AC control and auxiliary circuits : Mega ohm
d) between each phase of CT / PT and between
CT & PT circuit if any : Mega ohm
b) CT secondary resistance
c) CT polarity check
Check for contact alignment and wipe.
Check / test all releases / relays.
Check mechanical interlocks.
Check electrical interlocks.
Check switchgear / control panel wiring.
Check breaker / contactor circuit for :
a) Closing - local & remote (wherever applicable)
b) Tripping - local & remote (wherever applicable)
Opening time of breaker / contactor.
Closing time of breaker / contactor.
[This proforma shall be jointly signed by the CLIENT / PMC and the contractor in duplicate].
10.2 INSTALLATION OF CABLE NETWORK :
Cable network shall include power, control and lighting cables which shall be laid in
underground trenches, cable trays, G.I. pipes, or on building structures as detailed in the
relevant drawings, cable schedules or as per the client / consultant’s instructions. Supply &
installation of cable trays, G.I. pipes / conduits, cable glands and sockets of both end
isolators, junction boxes, remote push button stations, etc. shall be under the scope of the
(a) General requirements for handling cables :
Near Each pole 1mtr. Extra Cable length should be provided at both the end.
Before laying cables, this shall be tested for physical damage, continuity, absence of
cross phasing, insulation resistance to earth and between conductors. Insulation
resistance tests shall be carried out with 500 / 1000 V megger.
The cables shall be supplied at site, wound on wooden drums as far as possible. For
smaller length and sizes, cables in properly coiled form can be accepted. The cables
shall be laid by mounting the drum of the cable on drum carriage. Where the
carriage is not available, the drum shall be mounted on a properly supported axle,
and the cable laid out from the top of the drum. In no case the cable will be rolled
on as it produces kinks which may damage the conductor.
Sharp bending of cable shall be avoided. The bending radius for PVC insulated and
sheathed, armoured cable shall not be less than 10 D, where “D” is overall diameter
While drawing cables through DWC / G.I. pipes, conduits, RCC pipes, ensure that size
of pipe is such that, after drawing cables, 40% area is free. After drawing cables, the
end of pipe shall be sealed with cotton / bituminous compound.
High voltage (11 kV and above), medium voltage (240 V and above) and other
control cables shall be separated from each other by adequate spacing or running
through independent pipes / trays.
Armoured cables shall never be concealed in floors / roads without DWC Pipe or RCC
Joints in the cable throughout its length of laying shall be avoided as far as possible
and if unavoidable, prior approval of site engineer shall be taken. If allowed, proper
straight through epoxy resin tight joint shall be made, without any additional cost.
minimum loop of 3 mtr. shall be provided on both ends of the cable near SFP, and
on both ends of straight through cable joint. This additional length shall be used for
fresh termination in future. Cable for this loop shall be paid for supply and laying.
Cable shall be neatly arranged in the trenches / trays in such manner so that criss-
crossing is avoided and final take off to the motor / switchgear is facilitated.
Arrangement of cable within the trenches / trays shall be the responsibility of the
All cable routes shall be carefully measured and cable cut to the required lengths
and undue wastage of cables to be avoided. The routes indicated in the drawings is
indicative only and the same may be rechecked with the PMC before cutting of
cables. While selecting cable routes interference with structures, foundations,
pipelines, future expansion of buildings etc. should be avoided.
All temporary ends of cables must be protected against dirt and moisture to prevent
damage to the insulation. For this purpose, ends of all XLPE insulated cables shall be
taped with an approved PVC or rubber insulating tapes. Use of friction type or other
fabric type tape is not permitted. Lead sheathed cables shall be plumbed with lead
Wherever cable rises from underground / concrete / masonry trenches to motors /
switchgears / push buttons, these shall be taken in DWC / G.I. pipes of suitable size,
for mechanical protection upto 300 mm. distance of concerned cable gland or as
instructed by the client / consultant / PMC.
The cable pass through foundation / walls of other underground structures, the
necessary ducts for opening will be provided in advance for the same. However,
should it become necessary to cut holes in existing foundation of structures the
electrical contractor shall determine the location and obtain approval of the client /
consultant before cutting is done.
(b) LAYING OF CABLES (UNDERGROUND SYSTEM)
Electric cable for the street lighting installation shall follow specification under the
heading “MEDIUM VOLTAGE ALUMINUM XLPE CABLES”. The cable color shall be
yellow color for 4 core × 10 sq. mm. & Green color for 4 core × 16 sq. mm. cable &
size and AMC shall be embossed / Printed on outer surface of cable at every mtr.
Cables shall be so laid in trench that this will not interfere with other underground
structure. All water pipes, sewage lines or other structures which become exposed
by excavation shall be properly supported and protected from injury until the filling
has been rammed solidly in places under and around them. Any telephone or other
cables coming in the way are to be properly shielded / diverted as directed by the
owner / consultant.
Cable shall be laid at minimum depth of 900 mm. in case of L.T. and 1200 mm. in
case of H.T. from ground level. Excavation will be generally in ordinary soil. The
width of the trench shall be sufficient for laying of required no. of cables.
Sand bedding 75 mm. thick shall be made below and above the cables. Layer of
bricks (full size) shall be laid above sand bedding on the sides and above the cables
to cover cables completely. More than one cable can be laid in the same trench.
However, the relative location of cables in trench shall be maintained till
termination. The surface of the ground after back filling the earth shall be made
good so as to conform in all respects to the surrounded ground and to the entire
satisfaction of the client / consultant.
For all underground cables, route markers should be used :
a) Separate route markers should be used for LT, HT and telephone cables.
b) Route markers should be grounded in ground with 1:2:4 cement concrete
pedestal size 230 x 230 x 300 mm.
c) Cable markers should be installed at an interval not exceeding 30 mtr. along the
straight routes of cables at a distance of 0.5 mtr. away from centre of cable with
the arrow marked on the cable marker plate indicating the location of cable.
Cable markers should also be used to identify change in direction of cable route
and for location of every joint in underground cable.
RCC Hume pipe for crossing road in cable laying shall be provided by employer. No
deduction shall be made for cable laying in Hume pipe for not providing bricks, sand
and excavation. RCC hump pipe at the ends shall be sealed by bituminous compound
after laying and testing of cables by electrical contractor without any extra charge.
(D) TESTING OF CABLES :
i. Before energising, the insulation resistance of every circuit shall be
measured from phase to ground. This requires 3 measurements if one side is
grounded and 6 measurements for 3 phase circuits.
ii. Where splices or terminations are required in circuits rated above 650 volts,
measure insulation resistance of each length of cable before splicing and/or
terminating. Repeat measurements after splices and/or terminations are
iii. DC high voltage test shall be made after installation on the following :
a) All 1100 volts grade cables in which straight through joints have
b) All cables above 1100 V grade.
For record purpose test data shall include the measured values of
leakage current versus time. The DC high voltage test shall be
performed as detailed below :
Cables shall be installed in final position with all the straight through
joints complete. Terminations shall be kept unfinished so that
motors, switchgear, transformer etc. are not subjected to test
The test voltage and duration shall be as per relevant codes and
practices of Indian Standards Institution.
iv. PROFORMA FOR TESTING CABLES :
a) Drum No. from which cable taken.
b) Cable from to
c) Length of run of this cable meter
d) Insulation resistance test
i) between core-1 to earth mega-ohm
ii) between core-2 to earth mega-ohm
iii) between core-3 to earth mega-ohm
iv) between core-1 to core-2 mega-ohm
v) between core-2 to core-3 mega-ohm
vi) between core-3 to core-1 mega-ohm
vii) duration used : 1 kV
e) High Voltage test Voltage Duration
i) between core-1 to earth
ii) between individual cores
[This proforma shall be jointly signed by the CLIENT / PMC and the contractor in duplicate].
11 COMPLETION TESTS :
After supply and installation of complete project or a particular building / area, As per I.E.
rules tests shall be carried out by the contractor before switching on the power to
installation and the results shall be recorded and submitted to the Site-Engineer. If results
are not satisfactory / as per standards set herewith, the contractor shall identify the defects
/ short coming and shall rectify the same. Nothing extra shall be paid for carrying out these
tests and contractor has to arrange all necessary instruments.
12 HANDING OVER / TAKING OVER: (Including all Electrical work… )
After completion of works and tests specified above, the various installations of the project
can be taken over by the employer as and when these are ready in all respects after issuance
of certificate from Engineer in charge with in fifteen days. The Defect Liability Period cum
Maintenance Period of 60 months shall start from the date, when all the installations of the
project have been executed, tested as described above, successfully commissioned and
Specifications and Scope for Decorative Façade Lighting
Dynamic Façade Lighting for the decorative element and Pillars of the bridge including 10 year
Operation and maintenance with Manpower:
- Dynamic Façade lighting to be designed considering the decorative element of the
bridge on Both side of the bridge and on entire length of the bridge.
1. Project Overview
The objective of this project is to design, procure, install, and commission a Dynamic Facade
Lighting System for the river bridge. The lighting system should enhance the aesthetics of
the bridge while considering energy efficiency, durability, and ease of maintenance. The
system should provide programmable, dynamic lighting effects and allow for both automatic
and manual control, with the flexibility to adapt to different seasons and events. including
establishment of the new control room.
2. Scope of Work
The work will consist of the following key tasks:
2.1 Design and Engineering
Conceptual Design: Develop a dynamic lighting design concept that complements the
architecture and function of the river bridge.
Propose lighting patterns, color schemes, and special effects.
Integrate lighting designs with the structural and environmental features of the bridge.
Provide visual renderings and simulations to demonstrate lighting effects.
Detailed Design:
Lighting Calculations: Perform necessary calculations to ensure the lighting meets the
aesthetic and technical requirements (illumination levels, color rendering, light distribution).
Electrical Design: Develop detailed electrical schematics, including power supply,
distribution boards, and wiring layouts.
Control System Design: Design a control system for dynamic programming, allowing for
customization and scheduling of lighting effects.
Structural Integration: Ensure the design accounts for bridge load-bearing capacities and
ensures safety and stability of the fixtures.
Programming: Programming of the complete system with all required Softwares and
Licences for Life time with upgradation.
Minimum 20 different Programmes/Themes to be done as per the instruction of Client /
Architect / Consultant. - 3 Routine + 12 Holiday + 5 - Entertainment Programme. (
Combination of Programmes may vary. )
The theme duration should be minimum 15 minutes to maximum 1 hr.
The scope also includes to provide the all programme of simulation as per the installation
design and as per the instruction of Client / Architect / Consultant. The scope includes all
required manpower / equipment’s etc.. at Ahmedabad office location / Site.
Scope also includes the coordination with the Existing facade lighting O&M contractor and
updation of programme as per client / architect / consultant requirement.
Compliance: Ensure that all designs meet local regulations, standards, and codes (e.g., IP
ratings, CE certifications, UL standards, etc.).
2.2 Procurement
Lighting Fixtures: Supply of LED-based lighting fixtures suitable for outdoor, dynamic use.
Fixtures must have high durability, weather resistance (IP65 or higher), and energy
efficiency. Should be rated for the 55 deg C Ambient temperature.
Specify light sources: RGBW / RGBWW / RGB LEDs or other dynamic color-changing
Fixtures must have adjustable beam angles to optimize coverage.
Fixtures must be designed for ease of installation, maintenance, and future upgrades.
Fixture shall have the following ambient temperature ranges:
• Operating temperature: -40ᵒC to +60ᵒC
• Startup temperature: -35ᵒC to +60ᵒC
• Storage temperature: -40ᵒC to 70ᵒC
It is advisable to procure all Façade light fixture and All controllers from Single OEM, Client
may insist on the same. If Light fixture OEM does not have their own controller then the
required controller and all accessories to be procured from the light fixture OEM only.
Complete testing and Commissiong work to be done by the OEM only.
TEST REPORTS, COMPLIANCE AND APPROBATIONS:
• Fixture shall have all the following conformities, test reports and approbations, all
shall be provided from 3rd party testing laboratories:
• Fixture shall have all the following conformities, test reports and approbations.
Manufacturer’s self-declaration is accepted for the following:
o CE Declaration of Conformity
o CQC declaration of conformity
o RoHS compliance
o ASTM B117 for 500 hours
• The LED fixture shall be operated at constant voltage
• LED modules shall not be designed to be driven beyond their specified nominal
• LED fixture housing shall be designed to transfer heat from the LED board to the
outside environment.
All hardwired connections to LED fixture shall be reverse-polarity protected and shall provide
high-voltage protection in the event that connections are reversed or shorted during
Control Equipment:
Supply of control systems (e.g., DMX controllers, software, automation system).
•All DMX fixtures and control equipment are to be provided by the same manufacturer to
ensure compatibility
•Network switches, cables, fiber optics adaptors and power supplies can be provided by 3rd
party manufacturers
•DMX control system shall consist of a main controller and various sub-controllers
•DMX control system shall have DMX amplifiers whenever needed
•DMX control system shall have a hand-held addressing device for automatic in-site
addressing of the luminaires
•Main controllers shall be connected to sub-controllers via Cat6 cables up to 90m / via Fibre
cable above 90 mtr.
•Network switches shall be used to repeat the Ethernet signal transmitted between control
equipment over the Cat6 cables
Power supply and backup solutions (e.g., UPS).
Communication infrastructure should be wired and preferably with Fibre and dual
connectivity to be provided.
Cabling, Connectors and Accessories:
The Contractor shall supply and install weather-resistant power and data cables suitable for
continuous outdoor operation in a river bridge environment, including exposure to moisture,
humidity, dust, vibration, and temperature variations.
All connectors shall be minimum IP67 rated, factory-made and integral to the lighting
No site-fabricated, spliced, or locally assembled connectors shall be permitted.
All power and data connections shall be made directly to the fixture using manufacturer-
supplied connectors only.
Data and power cables shall be UV-resistant, flame-retardant, and suitable for dynamic
lighting control systems (e.g., DMX / Ethernet / proprietary protocols as applicable).
All junction boxes used for power and data distribution shall be of minimum IP66 ingress
protection rating.
Junction boxes shall be suitable for outdoor installation and corrosion-resistant.
IP66-rated cable glands shall be provided for each individual cable entry, sized appropriately
for the respective cable diameters.
Junction boxes shall be securely mounted and positioned to allow easy access for
maintenance while maintaining aesthetic considerations.
Raceways and Cable Trays
All raceways, conduits, and cable trays shall be provided with protective covers to prevent
ingress of water, dust, and debris.
Cable trays and raceways shall be hot-dip galvanized (HDG) to ensure corrosion resistance in
a riverine and outdoor environment.
Design and routing shall avoid sharp bends, water accumulation points, and mechanical
Supports and Structural Accessories
All supports, hangers, clamps, brackets, and structural accessories for cable trays, raceways,
fixtures, and junction boxes shall be hot-dip galvanized steel.
In addition to galvanization, all exposed supports shall be PU (Polyurethane) painted to
enhance durability and corrosion protection.
Supports shall be designed to withstand wind loads, vibration from traffic, and
environmental conditions specific to bridge structures.
Mounting Brackets and Enclosures
The Bidder shall supply all mounting brackets, enclosures, and accessories required for
complete installation of the lighting fixtures.
Mounting brackets shall:
Be custom-designed or manufacturer-approved for the specific fixtures.
Allow precise alignment, aiming, and secure fixing of luminaires.
Be corrosion-resistant and suitable for long-term outdoor use.
All enclosures shall meet the required ingress protection rating and be compatible with the
bridge structure without compromising safety or aesthetics.
General Requirements
All materials and accessories shall be new, unused, and of approved make and model.
The Contractor shall submit technical datasheets, IP certification documents, and corrosion
protection details for approval prior to procurement.
Installation shall be carried out in accordance with manufacturer recommendations,
approved drawings from Consultant and applicable standards.
2.3 Installation
Site Preparation:
Conduct a site survey to identify specific requirements for mounting the lighting fixtures on
Coordinate with the relevant authorities for access to the bridge and surrounding areas
during installation.
Lighting Fixtures Installation:
Mount all lighting fixtures on the bridge as per the approved design, including necessary
adjustments for height, angle, and orientation.
Ensure proper cable routing, weatherproofing, and connection of power and control
with all kind of mounting hardware support system spacers and nut bolt of SS304 Grade.
Additionally, the complete system should be fixed with SS 304/ Brass Cable tie and SS
Nut Bolt/hilti Anchor fastner with the main supporting structure / Bridge.
All support system design should be such that the same can be maintained at later stage
without requiring any platform / barge in the river. It should be accessible from bridge for
the maintenance / preventive maintenance / routine maintenance.
Control Systems Installation:
Install and configure all control systems, ensuring smooth communication between the
lighting fixtures and the control panel.
Integrate lighting controls with a user-friendly interface for easy operation.
Electrical Connections:
Connect all electrical components (fixtures, controllers, power supply) to the local grid,
ensuring all systems meet required standards.
Implement safety measures (e.g., fuses, surge protectors) to safeguard against electrical
2.4 Commissioning and Testing
System Testing:
Conduct comprehensive tests on all lighting and control systems to ensure proper
Verify the system’s ability to create dynamic lighting effects as per the design specifications.
Perform performance tests, including brightness, color accuracy, color mixing, and smooth
transitions of light effects.
Complete commissioning and testing of the system to be done by the OEM and OEM
Verification and responsibility letter to be produced by the bidder at the time of the final
testing and commissioning.
Control System Verification:
Test the full functionality of the control system, including automatic, manual, and remote
Verify the scheduling and programming capabilities (e.g., time-of-day changes, event-based
Energy Efficiency Testing:
Measure energy consumption and ensure that the system meets the agreed-upon energy
efficiency targets.
Provide a report on energy-saving features (e.g., dimming, automatic turn-off during non-
2.5 Handover and Training
System Documentation:
Provide full documentation of the system, including as-built drawings, wiring diagrams, and
maintenance manuals.
Submit a warranty and service agreement for the lighting system.
Provide training for the end-users on how to operate and maintain the system.
Train on manual and remote control, troubleshooting, and maintenance procedures.
System Handover:
Complete final handover to the client, ensuring all documentation is submitted and the
system is fully operational after 10 year of Operation and maintenance.
2.6 Maintenance and Warranty
Maintenance Support:
Provide a Ten-year comprehensive maintenance support period post-installation with
manpower including the half yearly visit from the OEM for checking and testing.
Also If required the Additional programming needs to be done as per the client requirement
for the special occasion.
Warranty and DLP :
Provide a minimum 10-year warranty and DLP for all lighting fixtures and all electrical
components against manufacturing defects and failure.
Warranty should cover the repair/replacement of faulty equipment.
The bidder shall provide 10-year light fitting and it’s all component availability from OEM to
client and should be on OEM letter head with NSM sign and OEM Stamp. Also, the same
should be given on Rs. 300 Stamp paper from OEM to Client and Company should give the
letter for authorized signatory.
Manufacturers should have to submit the required reports from NABL LAB UL / Intratech for
EMI-EMC test, Vibration compatibility test, Salinity spray test, IP/IK test, Powder coating
Facility, In house casting plant, and driver manufacturing facility in India. All luminaries
should have a BIS certificate. Manufacturers should have certification pertaining to product
design registration, CE certification, ROHS compliant and BIS certificate for drivers and
luminaries, Controllers etc. respectively.
3. Deliverables
Design Submissions: Preliminary and final design documents, including renderings, lighting
calculation reports, and electrical design schematics.
Procurement List: Bill of materials (BoM) with all components to be used, including
specifications for approval.
Installation Reports: Reports on installation progress, including any challenges faced and
how they were addressed.
Testing Reports: Comprehensive testing and commissioning documentation.
Training Manual: User manuals for control systems, maintenance guides, and
troubleshooting documents.
As-Built Documentation: Final as-built drawings and any modifications from the initial
4. Safety and Environmental Considerations
Ensure all work complies with local safety regulations and standards.
Implement measures to protect workers, pedestrians, and vehicular traffic during
Minimize environmental impact during installation and operation, particularly with regard to
energy usage and waste management.
List of Approved Make For Electrical Materials
S. Item Approved Make
1) Rigid PVC Conduit Precision Plastic Industries, Nihir, Finolex,
2) Accessories for conduit Same make as of pipe.
3) Flexible Copper Wires Finolex, Polycab, RR Kable, KEI,Hawells, Avocab
4) Switches Legrand (Myrius), MK (Blenze+),
Use different colour switch & Schneider (Livia), Hawells, ABB
Accessories for Raw & UPS Power
IP66 Box and Switches
5) Main Switch fuse upto Schneider MG, L&T
60 Amps - AC 23 duty
6) Above 60 Amps-A.C. 23 Duty Schneider MG, L&T
7) HRC Fuses Schneider MG, L&T, ABB
8) MCBs/ELCBs/ELMCBs / Contactor Legrand (DX3), Schneider MG ( Acti 9N),
Siemens (Beta Guard), L&T (Au), ABB (SB-200)
Time Switch ( Timer )
9) Distribution boards-
TPN & SPN DB (IP 65) Hensel, Spelsberg, Legrand (Plexo 3), ABB
VTPN DB (IK 43) Legrand , Schneider MG, Siemens, ABB
Factory fabricated. double door type, PPI only
with additional JB on both side
10) Rewireable Porcelain Fuse CPL, KEW.
11) Telephone wires Finolex, Delton, RR cable, Avocab, Polycab, KEI
12) Telephone cables Finolex, Delton, RR cable, Avocab, Polycab, KEI
13) PVC tape Steel grip, Anchor
14) Main Cables down XLPE armoured cable for 1.1 KV as per ISI
Stream Finolex, Polycab, RR Kable, KEI, Hawells, Avocab
15) Glands Compression type, Heavy duty and deep threading
with rubber ring and double washers. HMI,
Sr.No Item Approved Make
16) Cable Lugs Dowells, 3-D, Raychem.
17) Metal Clad Plugs Indoor –Legrand, Scame, Hensel.
Outdoor - Legrand, Scame, Hensel.
18) Connectors Hensel, Wohner.
19) Button holder, Angle Anchor, CPL
holder, ceiling rose
20) M.S. Conduit ISI BEC, Steel Craft, AKG
21) UPS APC, Emerson(Vertiv), Socomec, Numeric
(Legrand), Eaton
22) M.S. Boxes Fabricated out of 16 gauge continuously welded
(sample to be approved) with Powder coating.
23) Telephone tag block Krone
24) MCCB Schneider MG ( NSX ) , Legrand (DPX3), Siemens
(3VA), ABB (TMAX), L & T(MTX3.0)
With all kind of communication
25) Meter ( Analog Only ) Rushabh, L &T,Conzerv, Schneider
Digital Meter Schneider, Conserve, Secure Meter, L&T
26) Steel Wire Rain Forced Flaxi - Hose
PVC Flexible Hose
27) Cable Tray Ladder/Perforated - Hot deep GI -
Indiana,MEK,Superfab, OBO Better man, RRISPAT,
28) TV Cable/CCTV Cable ( 3 +1) Finolex, RR Cable, Avocab, Polycab.
29) Panel Fabricators CPRI Approved with 100KA Certification
Panel Manufacturer
30) IP55 Panel Hensel, Spelsberg. , Rittal, PECL
31) Changeover Switch On load type – HPL, C &S, Havell's (Euroload)
32) Fire Extinguisher Should be of ISI approved - Safex,Firex,Safeline
33) R G 6 / 11 wire Finolex, Avocab, Polycab, RR Kable, KEI, Hawells
34) Cat 6 Wire&Fibreoptic Cable and Legrand, SYSTIMAX, Panduit, Siemon
35) DIGITAL meters, Load Manager Schneider, Conserve, Secure Meter, L&T
36) Light Fixture – Façade Philips / Colour Kinetic / LT/LA-Martini
Sr. Item Approved Make
37) Light Fixture – Streetlight Philips, Kesslec, LT
38) LED Cree, OSRAM, Nichia as per OEM
39) Chemical Type Earthing LPI, Ashlok, OBO Betterman, ABB, AXIS.
( Copper Road only )
40) Energy Meter Conserve, Schneider, Secure Meter
41) CT AE, Ashok, Kappa, C&S
42) DWC Pipe( Anti Rodent Type Only ) Tirupati Plasto, REX, Duraline, Gemini, Veronica
Plastomatics Pvt. Ltd.
43) Fan (Grey colour Mat finish / White Crompton, Usha, Havells, Bajaj (Sample to be
colour as mentioned in drawing). approved by Client / Architect.)
44) Junction Box ( PVC / Polycerbonate ) Gewiss, Hensel, Spelsberg
45) Contactor Telemechanique, L & T, Schneider, Legrand, ABB
46) Panel Accessories Telemechanique, L &T, Siemens
47) Emergency Light Sigma
48) Water tight Plugs enclauser Gewiss, Hensel, Spelsberg, Scame, Legrand
49) Surge Protector Emerson, Obo Betterman, ASCO
50) RJ 45 Data outlet Legrand, SYSTIMAX, Panduit, Siemon.
51) Exhaust Fan ( Should be with louvers Usha, Havells, Crompton
52) Timers Theben, Legrand, Schneider
53) Network Switch HP, Cisco
54) Rack Legrand, Rittal, Panduit, WQ, APU
55) Modular Patch Panel Legrand, SYSTIMAX, Panduit, Siemon
56) Floor Junction Box OBO, Betterman, Legrand.
57) Floor Sheet Steel Raceways OBO, LK, MK.
58) Working Station HP/DELL/IBM
59) Indoor Dome Camera HONEYWELL / BOSCH / PELCO / AXIS/ SONY
60) Outdoor Bullet Camera HONEYWELL / BOSCH / PELCO / AXIS/ SONY
61) Number Plate Recognition HONEYWELL / BOSCH / PELCO / AXIS/ SONY
Surveillance Camera
62) Network Storage Manager HP/Dell/IBM
63) Network Video Management & Honeywell / Bosch / Pelco / Axis
Monitoring Software
64) Network Server HP/Dell/IBM
Sr. Item Approved Make
65) Workstation HP / Dell/ IBM
66) LED Monitor Panasonic / Sony / Samsung
67) Network Switch HP/Cisco/Dell
68) Patch Panel Commscope/Simon/Panduit/Legrand
69) Patch Cord Commscope/Simon/Panduit/Legrand
70) DMX Controller MA, Pharos, Madrix, Nicolaudie Architectural,
71) Street Light Pole Kesslec, Reytec, Neri, Bajaj, Valmount, RR Ispat,
(See Clauses 2.1 and 14.2)
Maintenance Requirements
1. Maintenance Requirements
(ii) The Contractor shall repair or rectify any Defect or deficiency set forth in Paragraph 2 of this
Schedule-E within the time limit specified therein and any failure in this behalf shall
constitute non-fulfilment of the DLP obligations by the Contractor.
(iii) All Materials, works and construction operations shall conform to the MORTH
Specifications for Road and Bridge Works, and the relevant IRC publications. Where the
specifications for a work are not given, Good Industry Practice shall be adopted.
2. Repair/rectification of Defects and deficiencies
The obligations of the Contractor in respect of Maintenance Requirements shall include
repair and rectification of the Defects and deficiencies specified in Annex - I of this Schedule-
E within the time limit set forth therein.
3. Other Defects and deficiencies
In respect of any Defect or deficiency not specified in Annex - I of this Schedule-E, the
Authority’s Engineer may, in conformity with Good Industry Practice, specify the permissible
limit of deviation or deterioration with reference to the Specifications and Standards, and
any deviation or deterioration beyond the permissible limit shall be repaired or rectified by
the Contractor within the time limit specified by the Authority’s Engineer.
4. Extension of time limit
Notwithstanding anything to the contrary specified in this Schedule-E, if the nature and
extent of any Defect or deficiency justifies more time for its repair or rectification than the
time specified herein, the Contractor shall be entitled to additional time in conformity with
Good Industry Practice. Such additional time shall be determined by the Authority’s Engineer
and conveyed to the Contractor and the Authority with reasons thereof.
5. Emergency repairs/restoration
Notwithstanding anything to the contrary contained in this Schedule-E, if any Defect,
deficiency or deterioration in the Project Highway poses a hazard to safety or risk of damage
to property, the Contractor shall promptly take all reasonable measures for eliminating or
minimizing such danger.
6. Daily inspection by the Contractor
7. Pre-monsoon inspection / Post-monsoon inspection
The Contractor shall carry out a detailed pre-monsoon inspection of all bridges, culverts and
drainage system before [1st June] every year in accordance with the guidelines contained in
IRC: SP35. Report of this inspection together with details of proposed maintenance works as
required on the basis of this inspection shall be sent to the Authority’s Engineer before the
[10th June] every year. The Contractor shall complete the required repairs before the onset
of the monsoon and send to the Authority’s Engineer a compliance report. Post monsoon
inspection shall be done by the [30th September] and the inspection report together with
details of any damages observed and proposed action to remedy the same shall be sent to
the Authority’s Engineer.
8. Repairs on account of natural calamities
All damages occurring to the Project Highway on account of a Force Majeure Event or wilful
default or neglect of the Authority shall be undertaken by the Authority at its own cost. The
Authority may instruct the Contractor to undertake the repairs at the rates agreed between
Annex-I : Repair/rectification of Defects and deficiencies
The Contractor shall repair and rectify the Defects and deficiencies specified in this Annex-I of Schedule-E within the time limit set forth in the table
Table -1: Maintenance Criteria for Pavements:
Asset Type Performance Level of Service Frequency of Tools / Standards and References for Time limit for Maintenance
Parameter (LOS) Inspection Equipment Inspection and Data Analysis Rectification/ Specifications
Desirable Acceptable Repair
Flexible Potholes Nil < 0.1 % of area Daily Length IRC 82: 2015 and Distress Identification 24-48 hours MORT&H
Pavement And subject to Measurement Manual for Long Term Pavement Specification
(Pavement limit of 10 mm Unit like Performance Program, FHWA 2003
of MCW, in Scale, Tape, (http://www.tfhrc.com/pavement/lttp/
Service Depth odometer reports/03031/)
Cracking Nil < 5 % subject to Daily 7-15 days MORT&H
limit of 0.5 sqm Specification
Rutting Nil < 5 mm Daily Straight Edge 15-30 days MORT&H
Asset Type Performance Level of Service Frequency of Tools / Standards and References for Time limit for Maintenance
Parameter (LOS) Inspection Equipment Inspection and Data Analysis Rectification/ Specifications
Desirable Acceptable Repair
Corrugations Nil < 0.1 % Daily Length 2-7 days IRC:82-
and of area Measurement
Shoving Unit like
Bleeding Nil < 1 % of Daily Scale, Tape, 3-7 days MORT&H
area odometer Specification
Ravelling Nil < 1 % of Daily 7-15 days IRC:82-
/ area 2015 read
Stripping with IRC SP
Edge Nil < 1 m for any Daily 7- 15 days IRC:82-
Deformation / 100 m section
Breaking and width
Roughness 2000 2400 Bi- Class I Class I Profilometer : ASTM E950 (98) 180 days IRC:82-
BI mm/km mm/km Annually Profilometer :2004 –Standard Test Method for
Skid 60SN 50SN Bi- SCRIM measuring Longitudinal Profile of 180 days BS: 7941-1:
Number Annually (Sidewayforce Travelled Surfaces with Accelerometer
Coefficient Established Inertial Profiling Reference
Pavement 3 2.1 Bi- Routine ASTM E1656 -94: 2000- Standard Guide 180 days IRC:82-
Condition Annually Investigation for Classification of Automatic
Index Machine or Pavement Condition Survey Equipment
Other Bi- 2-7 days IRC:82-
Pavement Annually
Asset Type Performance Level of Service Frequency of Tools / Standards and References for Time limit for Maintenance
Parameter (LOS) Inspection Equipment Inspection and Data Analysis Rectification/ Specifications
Desirable Acceptable Repair
Deflection/ Annually Falling IRC 115: 2014 180 days IRC:115-
Remaining Weight
Life Deflectometer
Rigid Roughness 2200m 2400mm Bi- Class I ASTM E950 (98) :2004 and ASTM E1656 180 days IRC:SP:83-
Pavement BI m/km /km Annually Profilometer - 94: 2000
Skid Skid Resistance no. at Bi- SCRIM IRC:SP:83-2008 180 days IRC:SP:83-
different speed of vehicles Annually (Sidewayforce
Minimum Traffic Speed Coefficient
SN (Km/h) Routine
36 50 Investigation
33 65 Machine or
32 80 equivalent)
Edge drop Nil 40mm Daily Length IRC 7-15 days MORT&H
Asset Type Performance Level of Service Frequency of Tools / Standards and References for Time limit for Maintenance
Parameter (LOS) Inspection Equipment Inspection and Data Analysis Rectification/ Specifications
Desirable Acceptable Repair
at Measurement Specification
shoulders Unit like
Embankment/ Slope of Nil <2% Daily Scale, Tape, 7-15 days MORT&H
Slope camber/c variation odometer Specification
ross fall in etc.
slope of camber
Embankment Nil <15 % Daily 7-15 days MORT&H
Slopes variation Specification
Embankment Nil Nil Daily NA 7-15 days MORT&H
Protection Specification
Rain Cuts/ Nil Nil Daily NA 7-15 days MORT&H
Gullies in Specially Specification
Slope During Rainy
In addition to the above performance criterion, the contractor shall strictly maintain the rigid pavements as per requirements in the following table
Table -2: Maintenance Criteria for Rigid Pavements :
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
1 Single Discrete w = width of 0 Nil, not discernible No Action Not applicable
Cracks Not crack
intersecting with L = length of 1 w < 0.2 mm. hair cracks
joint d = depth of 2 w = 0.2 - 0.5 mm, discernible from
crack slow-moving car Seal, and stitch if L
D = depth of slab 3 w = 0.5 - 1.5 mm, discernible from Seal without delay >lm.
fast-moving car Within 7days
4 w = 1.5 - 3.0 mm Seal, and stitch if L > l Staple or Dowel Bar
5 w > 3 mm. m. Retrofit, FDR for
Within 7 days affected portion.
2 Single Transverse w = width of 0 Nil, not discernible No Action
(or Diagonal) crack 1 w < 0.2 mm, hair cracks Route and seal with Staple or Dowel Bar
Crack L = length of epoxy. Retrofit.
intersecting with crack 2 w = 0.2 - 0.5 mm, discernible from Within 7 days 2 Within 15days
one d = depth of slow vehicle
or more joints crack 3 w = 0.5 - 3.0 mm, discernible from Route, seal and
D = depth of slab fast vehicle stitch, if
4 w = 3.0 - 6.0 mm Dowel Bar Retrofit. Full Depth Repair
Within 15 days Dismantle and
reconstruct affected.
5 w > 6 mm, usually associated with Not Applicable, as it Portion with norms
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
spalling, and/or slab rocking under may be full and specifications -
traffic depth See Para 5.5 &
3 Single w = width of 0 Nil, not discernible No Action
Longitudinal crack 1 w < 0.5 mm, discernable from slow moving Seal with epoxy, if L > Staple or dowel bar
Crack L = length of vehicle 1 retrofit.
intersecting crack m. Within 15days
with one or d = depth of Within 7 days
more crack 2 w = 0.5 - 3.0 mm, discernible from Route seal and stitch, Partial Depth Repair
joints D = depth of slab fast vehicle if L with stapling.
> l m. Within 15 days
3 w = 3.0 - 6.0 mm Staple, if L > 1 m. Full Depth Repair
Within 15 days Dismantle and
4 w = 6.0 - 12.0 mm, usually Not Applicable, as it reconstruct affected
associated with spalling may be full portion as per norms
5 w > 12 mm, usually associated with and specifications -
spalling, and/or slab rocking under depth See Para 5.6.4
traffic Within 15 days
4 Multiple Cracks w = width of 0 Nil, not discernible No Action Dismantle, Reinstate
intersecting with crack 1 w < 0.2 mm, hair cracks Seal, and stitch if L > l subbase,
one 2 w = 0.2 - 0.5 mm. discernible from m. Reconstruct whole
or more joints slow vehicle 2 Within 15 days slab as per
3 w = 0.5 - 3.0 mm, discernible from specifications within
fast vehicle 30 days
4 w = 3.0 - 6.0 mm panel broken into Full depth repair
2 or 3 pieces within
5 w > 6 mm and/or panel broken into more 15 days
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
5 Corner Break w = width of 0 Nil, not discernible No Action Seal with epoxy seal
crack 1 w < 0.5 mm; only 1 corner broken Seal with low with epoxy
L = length of 2 w < 1.5 mm; L < 0.6 m, only one viscosity 2 Within 7days
crack corner broken epoxy to
secure broken parts
3 w < 1.5 mm; L < 0.6 m, two corners Partial Depth (Refer Full depth repair
broken Figure 8.3 of
4 w > 1.5 mm; L > 0.6 m or three IRC:SP: 83-2008)
corners broken Within 15 days
5 three or four corners broken Reinstate sub-base,
and reconstruct the
slab as per norms
and specifications
6 Punchout w = width of 0 Nil, not discernible Not Applicable, as it No Action
(Applicable to crack 1 w < 0.5 mm; L < 3 m/m2 may
Continuous L = length 2 either w > 0.5 mm or L < 3 m/m2 be full depth Seal with low
Reinforced (m/m2) 3 w > 1.5 mm and L < 3 m/m2 viscosity epoxy to
Concrete 4 w > 3 mm, L < 3 m/m2 and deformation secure broken parts.
Pavement (CRCP) 5 w > 3 mm, L > 3 m/m2 and deformation Within 15days
Full depth repair -
Cut out and replace
damaged area taking
care not to damage
Surface Defects
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
7 Ravelling or r = area 0 Nil, not discernible No action
Honeycomb type damaged 1 r<2% Local repair of areas
surface surface/total 2 r = 2 - 10 % damaged
surface of slab and liable to be
h = maximum Within 15 days
depth 3 r = 10-25% Bonded Inlay, 2 or 3 Not Applicable
of damage 4 r = 25 - 50 % slabs if affecting.
5 r > 50% and h > 25 mm Within 30 days
Reconstruct slabs,
or more slabs if
8 Scaling r = damaged 0 Nil, not discernible Short Term Long Term
surface/total No action
surface of slab
1 r<2% Local repair of areas Not Applicable
2 r = 2 - 10 % damaged
3 r = 10 - 20% and liable to be
4 r = 20 - 30 % damaged.
5 r > 30 % and h > 25 mm Within 7days
Bonded Inlay within
Reconstruct slab
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
9 Polished t = texture 0 No action Not Applicable
Surface/Glazing depth, 1 t > 1 mm
sand patch test 2 t = 1 - 0.6 mm
3 t = 0.6 - 0.3 mm Monitor rate of
4 t = 0.3 - 0.1 mm deterioration
5 t < 0.1 mm Diamond Grinding if
50% or more slabs in
continuous stretch of
10 Popout n = number/m2 0 d < 50 mm; h < 25 mm; n < 1 per 5 m2 No action. Not Applicable
(Small Hole), d = diameter 1 d = 50 - 100 mm; h < 50 mm; n < 1 per 5 m2 Partial depth repair
Pothole Refer h = maximum 2 d = 50 - 100 mm; h > 50 mm; n < 1 per 5 m2
Para 8.4 depth mm deep.
3 d = 100 - 300 mm; h < 100 mm n < 1 per 5 m2 Partial depth repair
i.e.10 mm more than
5 d > 300 mm; h > 100 mm: n > 1 per 5 m2 Full depth repair.
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
JOINT DEFECTS Short Term Long Term
11 Joint Seal loss or damage 0 Difficult to discern No action.
Defects L = Length as % 1 Discernible, L< 25% but of little immediate Clean joint, inspect
total consequence with regard to ingress of water later.
joint length or trapping incompressible material. Not Applicable
2 Notable. L > 25% insufficient protection Clean and reapply
against ingress of water and trapping sealant in
incompressible material. selected locations.
3 Notable. L > 25% insufficient protection Clean and reapply
against ingress of water and trapping sealant in
incompressible material. selected locations.
5 Severe; w > 3 mm negligible protection Clean, widen and
against ingress of water and trapping reseal the joint.
incompressible material. Within 7 days
12 Spalling of Joints w = width on 0 Nil, not discernible No action.
either 1 w < 10 mm Apply low viscosity Not Applicable
side of the joint L 2 w = 10 - 20 mm, L < 25% epoxy resin/
= 3 w = 20 - 40 mm, L > 25% mortar in cracked
length of spalled portion.
portion (as % Within 7 days
joint Partial Depth Repair.
length) Within 15 days
w, within 30 days
5 w > 80 mm, and L > 25% 50 - 100 mm deep
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
13 Faulting (or f = difference of 0 not discernible, < 1 mm No action. No action.
Stepping) level 1 f < 3 mm Replace the slab as
2 f = 3 - 6 mm Determine cause and appropriate.
observe, take Within 30days
action for diamond
3 f = 6 - 12 mm Diamond Grinding
4 f= 12 - 18 mm Raise sunken slab.
5 f> 18 mm Strengthen subgrade Replace the slab as
and sub-base appropriate.
by grouting and Within 30days
raising sunken slab
14 Blowup or h = vertical 0 Nil, not discernible Short Term Long Term
Buckling displacement 1 h < 6 mm No Action
from 2 h = 6 - 12 mm Install Signs to Warn
normal profile 3 h = 12 - 25 mm Traffic
4 h > 25 mm Full Depth Repair.
5 shattered slabs, ie 4 or Replace broken slabs.
more pieces Within 30 days
15 Depression h = negative 0 Not discernible, h < 5 mm No action Not Applicable
vertical 1 h = 5 - 15 mm Install Signs to Warn
displacement 2 h = 15-30 mm, Nos <20% joints Traffic
from within 7 days
normal profile L 3 h = 30 - 50 mm Strengthen subgrade.
=length 4 h > 50 mm or > 20% joints Reinstate pavement
at normal level if L
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
5 h > 100 mm Within 30 days
16 Heave h = positive 0 Not discernible. h < 5 mm Short Term Long Term
vertical 1 h = 5 - 15 mm No action.
displacement Follow up.
from 2 h = 15 - 30 mm, Nos <20% joints Install Signs to Warn
normal profile. 3 h = 30 - 50 mm Traffic
L = length within 7 days
4 h > 50 mm or > 20% joints Stabilise subgrade. scrabble
5 h > 100 mm Reinstate
pavement at normal
level if length
17 Bump h = vertical 0 h < 4 mm No action
1 h = 4 - 7 mm Grind, in case of new Construction Limit
construction for New
within 7 days Construction
3 h = 7 - 15 mm Grind, in case of Replace in case of
ongoing new construction.
Maintenance Within 30days
5 h > 15 mm Full Depth Repair. Full Depth Repair.
Within 30 days Within 30days
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
18 Lane to f = difference of 0 Nil, not discernible Short Term Long Term
Shoulder level < 3mm No action
Dropoff 1 f = 3 - 10 mm Spot repair of
2 f = 10 - 25 mm shoulder
3 f = 25 - 50 mm Fill up shoulder
4 f = 50 - 75 mm For any 100 m
5 f > 75 mm stretch
affecting 25% or
more of stretch.
19 Pumping quantity of fines 0 Not discernible No Action
and water 1 to 2 slight/ occasional Nos < 10% Repair cracks and Inspect and repair
expelled joints Without sub-drainage at
through open delay distressed sections
joints and cracks 3 to 4 appreciable/ Frequent 10 - 25% Lift or jack slab and upstream.
Nos within 30 days.
5 abundant, crack Repair distressed
development > 25% pavement sections.
Strengthen subgrade
and subbase. Replace
S. Type of Distress Measured Degree of Assessment Rating Repair Action
No. Parameter Severity For the case d For the case d
20 Ponding Ponding on slabs 0-2 No discernible Problem No action.
due to blockage 3 to 4 Blockages observed in Clean drains etc Action required to
of drains, but water within 7 days, stop water damaging
drains flowing Follow up foundation within
5 Ponding, accumulation -do days
of water observed
Table -3: Maintenance Criteria for Safety Related Items and Other Furniture Items:
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Highway Availability As per IRC SP :84-2014, a Monthly Manual Removal of obstruction within 24 IRC:SP
of Safe Sight minimum of safe stopping sight Measurements hours, in case of sight line affected by 84-2014
Distance distance shall be available with temporary objects such as trees,
throughout. Odometer temporary encroachments.
along with In case of permanent structure or
Design Desirable Safe video/ image design deficiency:
Speed, Minimum Stopping backup Removal of obstruction/improvement
kmph Sight Sight of
Distance Distance deficiency at the earliest Speed
(m) (m) Restriction boards and suitable traffic
100 360 180 calming measures such as transverse
marking, blinkers, etc. shall be applied
during the period of rectification.
Pavement Wear <70% of marking remaining Bi- Visual Re - painting Cat-1 Defect – IRC:35-
Marking Annually Assessment as within 24 hours
per Annexure- Cat-2 Defect -
of IRC:35-2015 months
Day time During expected life Service Time Monthly As per Re – painting Cat-1 Defect – IRC:35-
Visibility Cement Road - Annexure-D of within 24 hours
130mcd/m2/lux IRC:35-2015 Cat-2 Defect –
Bituminous Road - within
100mcd/m2/lux months
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Night Time Initial and Minimum Performance Bi-Annually As per Re – painting Cat-1 Defect – IRC:35-2015
Visibility for Dry Retro reflectivity during Annexure-E of within 24 hours
night time: IRC:35-2015 Cat-2 Defect –
Design (RL) Retro months
Speed Reflectivity
Initial Minimum
(7 days) Threshold
Initial and Minimum Performance
for Night Visibility under wet
condition (Retro reflectivity):
Initial 7 days Retro reflectivity:
100 mcd/m2/lux Minimum
Threshold Level: 50 mcd/m2/lux
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Skid Initial and Minimum performance Bi-Annually As per Within 24 IRC:35-2015
Resistance for Skid Resistance: Annexure-G of hours
Initial (7days): 55BPN IRC:35-2015
Min. Threshold: 44BPN
*Note: shall be considered under
Urban /city traffic condition
encompassing the locations like
pedestrian crossings, bus bay, bus
stop, cycle track intersection
delineation, transverse bar
Road Shape and Shape and Position as per IRC:67- Daily Visual with Improvement of 48 hours in IRC:67-2012
Signs Position 2012. video/image shape, in case if case
Signboard should be clearly visible backup shape is damaged. of Mandatory
for the design speed of the Relocation as per Signs,
section. requirement Cautionary
Dual post signs)
15 Days in case
Cantilever Sign
Retro As per specifications in IRC:67- Bi-Annually Bi-Annually Change of 48 hours in IRC:67-2012
Reflectivity 2012 Testing of Signboard case
each signboard of Mandatory
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
using Retro Signs,
Reflectivity Cautionary and
Measuring Informatory
Device. In Signs (Single
with ASTM D Dual post signs)
4956-09. 1 Month in
Cantilever Sign
Kerb Kerb Height As per IRC 86:1983 depending Bi-Annually Use of distance Raising Kerb Height Within 1 IRC 86:1983
upon type of Kerb measuring Month
Kerb Painting Functionality: Functioning of Kerb Daily Visual with Kerb Repainting Within 7-days IRC 35:2015
painting as intended video/image
Other Reflective Numbers and Functionality as per Daily Counting New Installation Within 2 IRC:SP:84-
Road Pavement specifications in IRC:SP:84-2014 months 2014, IRC:35-
Furniture Markers (Road and IRC:35-2015, unless specified
Studs) in Schedule-B.
Pedestrian Functionality: Functioning of Daily Visual with Rectification Within 15 days IRC:SP:84-
Guardrail guardrail as intended video/image
Traffic Safety Functionality: Functioning of Daily Visual with Rectification Within 7 days IRC:SP:84-
Barriers Safety Barriers as intended video/image
backup IRC:119-
End Functionality: Functioning of End Daily Visual with Rectification Within 7 days IRC:SP:84-
Treatment of Treatment as intended video/image 2014, IRC:119-
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Traffic Safety backup
Attenuators Functionality: Functioning of Daily Visual with Rectification Within 7 days IRC:SP-2014,
Attenuators as intended video/image IRC:119-
Guard Posts Functionality: Functioning of Daily Visual with Rectification Within 15 days IRC: 79 -
and Guard Posts and Delineators as video/image
Delineators intended backup
Overhead Sign Overhead sign structure shall be Daily Visual with Rectification Within 15 days IRC:67-2012
Structure structurally adequate video/image
Traffic Functionality: Functioning of Daily Visual with Rectification Within 7 days IRC:SP:84-
Blinkers Traffic Blinkers as intended video/image
Highway Highway Illumination: Daily The Improvement 24 hours IRC:SP:84-
Lighting Lights Minimum 40 Lux illumination on illumination in Lighting
System the road surface level shall be System
No major failure in the lighting Daily - Rectification of 24 hours IRC:SP:84-
No minor failure in the lighting Monthly - Rectification of 8 hours IRC:SP:84-
Toll Plaza Minimum 40 Lux illumination on Daily The Improvement in 24 hours IRC:SP:84-
Canopy the illumination Lighting System
Lights road surface level shall be
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
No major/minor failure in the Daily - Rectification of 8 hours IRC:SP:84-
lighting Failure
Trees and Obstruction No obstruction due to trees Monthly Visual with Removal of trees Immediate IRC:SP:84-
Plantation in a minimum video/image
including head-room of backup
median 5.5 m above
plantation carriageway
in visibility of
Deterioration Health of plantation shall be as Daily Visual with Timely watering Within 90 days IRC:SP:84-
in health of per requirement of specifications video/image and treatment.
trees and & instructions issued by Authority backup Or Replacement
bushes from time to time of Trees and
Vegetation Sight line shall be free from Daily Visual with Removal of Trees Immediate IRC:SP 84-
affecting sight obstruction by vegetation video/image
line and road backup
Rest Cleaning of - Daily - - Every 4 hours
Defects in - Daily - Rectification 24 hours
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Other Damage or deterioration in Approach Roads, Daily - Rectification 15 days IRC:SP 84-
Project pedestrian facilities, truck lay-bys, bus-bays,
Facilities busshelters, cattle crossings, Traffic Aid Posts,
and Medical Aid Posts and other works
Pipe/box/slab Free 85% of culvert normal flow area 2 times in a Inspection by Cleaning silt up soils 15 days IRC 5-2015,
culverts waterway/ to available year (before Bridge and debris in culvert before onset IRC SP:40-
unobstructed and after Engineer as per barrel after rainy of monsoon 1993 and
flow rainy season) IRC SP: 35- season, removal of and within IRC SP:13-
section 1990 and bushes and 30 days after
recording of vegetation, U/s of end of rainy
depth of silting barrel, under barrel season.
and area of and D/s of barrel
vegetation. before rainy season.
Leak-proof No leakage through expansion Bi-Annually Physical Fixing with sealant 30 days or IRC SP:40-
expansion joints inspection Suitably before onset 1993 and IRC
joints if of expansion of rains SP:69-2011
any joints as per whichever
IRC SP: 35- comes
1990 if any, for earlier
leakage strains
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Structurally Spalling of concrete not more Bi-Annually Detailed Repairs to spalling, 15 days IRC SP 40-
sound than 0.25 sqm inspection cracking, 1993 and
Delamination of concrete not of all delamination, MORTH
more than 0.25 sq.m. components of rusting shall be Specification
Cracks wider than 0.3 mm not culvert as per followed s clause
more than 1m aggregate length IRC SP:35-1990 as per IRC:SP:40-
Protection Damaged of rough stone apron or 2 times in a Condition Repairs to damaged
30 days after IRC: SP 40-
works in good bank revetment not more than 3 year (before survey as aprons and pitching
defect 1993 and
condition sqm, damage to solid apron and after per IRC SP:35- observation IRC:SP:13-
(concrete apron) not more than 1 rainy 1990 or 2 weeks
Sqm season) before onset
of rainy season
Bridges Riding No pothole in wearing coat on Daily Visual Repairs to BC or 15 days MORT&H
including quality or bridge deck inspection as wearing Coat Specification
ROBs user per IRC SP:35-
Flyover etc. comfort
Bridge -Super Bumps No bump at expansion joint Daily Visual Repairs to BC on 15 days MORT&H
Structure inspection either side of Specification
as per IRC expansion joints, 3004.2 &
SP:35- profile correction
1990 course on approach
slab in case of
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
User No damaged or missing stretch of Daily Visual Repairs and 3 days IRC: 5-1998,
safety crash barrier or pedestrian hand inspection replacement of IRC SP: 84-
(condition railing and detailed safety barriers as the 2014 and
of crash condition case may be IRC SP: 40-
barrier survey as
and guard per IRC SP: 35-
Rusted Not more than 0.25 sq.m Bi- Detailed All the corroded 15 days IRC SP: 40-
reinforcement Annually condition reinforcement shall 1993 and
Spalling of Not more than 0.50 sq.m survey as per need to be MORTH
Concrete IRC thoroughly cleaned Specification
Delamination Not more than 0.50 sq.m SP: 35-1990 from rusting and
using applied with anti-
Mobile Bridge corrosive
Inspection Unit coating before
carrying out the
repairs to affected
concrete portion
with epoxy mortar /
Cracks Not more than 1m total length Bi-Annually Detailed Grouting with epoxy 48 Hours IRC SP: 40-
wider than condition mortar, investigating 1993 and
0.30 mm survey as per causes for cracks MORTH
IRC development and Specification
SP: 35-1990 carry out necessary
using rehabilitation.
Inspection Unit
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Rainwater Leakage – nil Quarterly Detailed Grouting of deck 1 month MORTH
seepage condition slab at specifications
through survey as per leakage areas, 2600 &
deck slab IRC waterproofing,
SP: 35-1990 repairs to
using drainage spouts
Inspection Unit
Deflection Within design limits. Once in Load test Carry out major 6 months IRC SP: 51-
due to every 10 method rehabilitation works
permanent years for on bridge to retain
loads and live spans more original design loads
loads than 40 m capacity
Vibrations Frequency of vibrations shall not Once in Laser Strengthening of 4 months AASHTO
in bridge be more than 5 Hz every 5 years displacement super LRFD
deck due to for spans sensors or Structure specifications
moving more than laser
trucks 30m and vibro-meters
Leakage in No damage to elastomeric Sealant Bi-Annually Detailed Replace of seal in 15 days MORTH
Expansion compound in strip seal expansion condition expansion joint specifications
joints joint, no leakage of rain water survey as per 2600 and IRC
through expansion joint in case of IRC SP:35-1990 SP: 40-1993.
buried and asphalt plug and using Mobile
copper strip joint. Bridge
Inspection Unit
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Debris and No dust or debris in expansion Monthly Detailed Cleaning of 3 days MORTH
dust in joint gap. condition expansion specifications
strip seal survey as per joint gaps 2600 and IRC
expansion IRC thoroughly SP: 40-
joint SP:35-1990
Inspection Unit
Drainage No down take pipe missing / Monthly Detailed Cleaning of drainage 3 days MORTH
Spouts broken below soffit of the deck condition spouts thoroughly. specification
slab. No silt, debris, clogging of survey as per Replacement of
drainage spout collection IRC Missing / broken
chamber. SP: 35-1990 down take pipes
using with a minimum
Mobile Bridge pipe extension of
Inspection Unit 500mm below soffit
of slab. Providing
sealant around the
drainage spout if any
leakages observed.
Bridge Cracks / No cracks, spalling of concrete Bi-Annually Detailed All the corroded 3 days IRC SP: 40-
substructure spalling of and rusted steel condition reinforcement shall 1993 and
concrete/ survey as per need to be MORTH
rusted steel IRC thoroughly cleaned specification
SP: 35-1990 from rusting and
using applied with anti-
Mobile Bridge corrosive coating
Inspection Unit before carrying out
substructure by
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
grouting / guniting
depending on type
of defect noticed
Bearings Delamination of bearing Bi-Annually Detailed In case of failure of 3 months MORTH
reinforcement not more than 5%, condition even one bearing on specification
cracking or tearing of rubber not survey as per any pier / abutment, 2810 and
more than 2 locations per side, no IRC all the bearings on IRC SP: 40-
rupture of reinforcement or SP: 35-1990 that pier / abutment
rubber using shall be replaced, in
Mobile Bridge order to get uniform
Inspection Unit load transfer on to
Bridge Scouring Scouring shall not be lower than Bi-Annually Condition Suitable protection 1 month IRC SP: 40-
Foundations around maximum scour level for the survey works around 1993, IRC
foundations bridge and visual pier/abutment 83-2014,
inspection as MORTH
per IRC SP:35- specification
Unit. In case of
Asset Performance Level of Service (LOS) Frequency of Testing Recommended Time limit for Specifications
Type Parameter Measurement Method Remedial Rectification and
Measures Standards
Protection Damaged of rough stone apron or 2 times in Condition Repairs to damaged 30 days after IRC: SP 40-
works bank revetment not more than 3 a year survey aprons and pitching. Defect 1993 and
in good sq.m, damage to solid apron (before and as per IRC observation or IRC:SP:13-
condition (concrete apron) not more than 1 after rainy SP:35- 2 weeks before
sq.m season) 1990 onset of rainy
Note: Any Structure during the entire contract period which is found that does not complies with all requirements of this Table will be prepared,
Rehabilitated or even reconstructed under the scope of the contractor.
Table 4: Maintenance Criteria for Structures and Culverts:
A. Flexible Pavement
Nature of Defect or deficiency Time limit for repair/
(b) Granular earth shoulders, side slopes, drains and culverts
(i) Variation by more than 1 % in the prescribed slope of 7 (seven) days
camber/cross fall (shall not be less than the camber on
the main carriageway)
(ii) Edge drop at shoulders exceeding 40 mm 7 (seven) days
(iii) Variation by more than 15% in the prescribed side 30 (thirty) days
(embankment) slopes
(ii) Rain cuts/gullies in slope 7 (seven) days
(iii) Damage to or silting of culverts and side drains 7 (seven) days
(ii) Desilting of drains in urban/semi- urban areas 24 (twenty four) hours
(iii) Railing, parapets, crash barriers 7 (seven) days
(Restore immediately if
causing safety hazard)
(c) Road side furniture including road sign and pavement marking
(i) Damage to shape or position, poor visibility or loss of 48 (forty eight) hours
retro- reflectivity
(ii) Painting of km stone, railing, parapets, crash As and when required/
barriers Once every year
(iii) Damaged/missing signs road requiring 7 (seven) days
(iv) Damage to road mark ups 7 (seven) days
(d) Road lighting
(i) Any major failure of the system 24 (twenty four) hours
(ii) Faults and minor failures 8 (eight) hours
(e) Trees and plantation
(i) Obstruction in a minimum head- room of 5 m 24 (twenty four)hours
above carriageway or obstruction in visibility of road
(ii) Removal of fallen trees from carriageway 4 (four) hours
(iii) Deterioration in health of trees and bushes Timely watering and
(iv) Trees and bushes requiring replacement 30 (thirty) days
(v) Removal of vegetation affecting sight line and road 15 (fifteen) days
(i) Cleaning of toilets Every 4 (four) hours
(ii) Defects in electrical, water and sanitary 24 (twenty four) hours
(g) [Toll Plaza]
(h) Other Project Facilities and Approach roads
(i) Damage in approach roads, pedestrian facilities, truck 15 (fifteen) days
lay- byes, bus-bays, bus-shelters, cattle crossings,
[Traffic Aid Posts, Medical Aid Posts] and service roads
(ii) Damaged vehicles or debris on the road 4 (four) hours
(iii) Malfunctioning of the mobile crane 4 (four) hours
(a) Superstructure
(i) Any damage, cracks, spalling/ scaling Temporary within 48 (forty eight)
measures Permanent measures hours
within 15 (fifteen) days or as
specified by the Authority’s
(i) Scouring and/or cavitation 15 (fifteen) days
(c) Piers, abutments, return walls and wing walls
(i) Cracks and damages including settlement and 30 (thirty) days
tilting, spalling, scaling
(d) Bearings (metallic) of bridges
(i) Deformation, damages, tilting or shifting of bearings 15 (fifteen) days Greasing
of metallic bearings once in
(i) Malfunctioning of joints 15 (fifteen) days
(f) Other items
(i) Deforming of pads in elastomeric bearings 7 (seven) days
(ii) Gathering of dirt in bearings and joints; or clogging of 3 (three) days
spouts, weep holes and vent-holes
(iii) Damage or deterioration in kerbs, parapets, 3 (three) days (immediately
handrails and crash barriers within 24 hours if posing
danger to safety)
(iv) Rain-cuts or erosion of banks of the side slopes of 7 (seven) days
(v) Damage to wearing coat 15 (fifteen) days
(vi) Damage or deterioration in approach slabs, 30 (thirty) days
pitching, apron, toes, floor or guide bunds
(vii) Growth of vegetation affecting the structure or 15 (fifteen) days
obstructing the waterway
(i) Damage to retaining wall/breast wall 7 (seven) days
(ii) Landslides requiring clearance 12 (twelve) hours
(iii) Snow requiring clearance 24 (twenty four) hours
[Note: Where necessary, the Authority may modify the time limit for
repair/rectification, or add to the nature of Defect or deficiency before issuing the
bidding document, with the approval of the competent authority.]
(See Clause 4.1 (vii)(a))
Applicable Permits
1. Applicable Permits
(i) The Contractor shall obtain, as required under the Applicable Laws, the following Applicable
(a) Permission of the State Government for extraction of boulders from quarry;
(b) Permission of Village Panchayats and Pollution Control Board for installation of
(c) Licence for use of explosives;
(d) Permission of the State Government for drawing water from river/reservoir;
(e) Licence from inspector of factories or other competent Authority for setting up
batching plant;
(f) Clearance of Pollution Control Board for setting up batching plant;
(g) Clearance of Village Panchayats and Pollution Control Board for setting up asphalt
(h) Permission of Village Panchayats and State Government for borrow earth; and
(i) Any other permits or clearances required under Applicable Laws.
(ii) Applicable Permits, as required, relating to environmental
protection and conservation shall have been procured by the Authority in
accordance with the provisions of this Agreement.
(See Clauses 7.1 and 19.2)
(See Clause 7.1)
Form of Bank Guarantee
[Security Deposit / Performance Security/Additional Security Deposit]
The Municipal Commissioner ,AMC WHEREAS:
(A) [name and address of contractor] (hereinafter called the “Contractor") and [name and
address of the authority], (hereinafter called the “Authority”) have entered into an
agreement (hereinafter called the “Agreement”) for the construction of the ***** section of
[National Highway No. **] on Engineering, Procurement and Construction (the “EPC”) basis,
subject to and in accordance with the provisions of the Agreement
(B) The Agreement requires the Contractor to furnish a Performance Security for due and faithful
performance of its obligations, under and in accordance with the Agreement, during the
{Construction Period/ Defects Liability Period and Maintenance Period} (as defined in the
Agreement) in a sum of Rs….. cr. (Rupees ………..….. crore) (the “Guarantee Amount”).
(C) We, ………………….. through our branch at …………………. (the “Bank”) have agreed to furnish
this bank guarantee (hereinafter called the “Guarantee”) by way of Performance Security.
NOW, THEREFORE, the Bank hereby, unconditionally and irrevocably, guarantees and affirms as
1. The Bank hereby unconditionally and irrevocably guarantees the due and faithful
performance of the Contractor’s obligations during the {Construction Period/ Defects
Liability Period and Maintenance Period} under and in accordance with the Agreement, and
agrees and undertakes to pay to the Authority, upon its mere first written demand, and
without any demur, reservation, recourse, contest or protest, and without any reference to
the Contractor, such sum or sums up to an aggregate sum of the Guarantee Amount as the
Authority shall claim, without the Authority being required to prove or to show grounds or
reasons for its demand and/or for the sum specified therein.
2. A letter from the Authority, under the hand of an officer not below the rank of
[General Manager in the National Highways Authority of India], that the Contractor has
committed default in the due and faithful performance of all or any of its obligations
under and in accordance with the Agreement shall be conclusive, final and binding on
the Bank. The Bank further agrees that the Authority shall be the sole judge as to whether
the Contractor is in default in due and faithful performance of its obligations during and
under the Agreement and its decision that the Contractor is in default shall be final and
binding on the Bank, notwithstanding any differences between the Authority and the
Contractor, or any dispute between them pending before any court, tribunal, arbitrators or
any other authority or body, or by the discharge of the Contractor for any reason
3. In order to give effect to this Guarantee, the Authority shall be entitled to act as if the Bank
were the principal debtor and any change in the constitution of the Contractor and/or the
Bank, whether by their absorption with any other body or corporation or otherwise, shall
not in any way or manner affect the liability or obligation of the Bank under this Guarantee.
4. It shall not be necessary, and the Bank hereby waives any necessity, for the Authority
to proceed against the Contractor before presenting to the Bank its demand under this
5. The Authority shall have the liberty, without affecting in any manner the liability of the Bank
under this Guarantee, to vary at any time, the terms and conditions of the Agreement or to
extend the time or period for the compliance with, fulfillment and/ or performance of all or
any of the obligations of the Contractor contained in the Agreement or to postpone for any
time, and from time to time, any of the rights and powers exercisable by the Authority
against the Contractor, and either to enforce or forbear from enforcing any of the terms and
conditions contained in the Agreement and/or the securities available to the Authority, and
the Bank shall not be released from its liability and obligation under these presents by any
exercise by the Authority of the liberty with reference to the matters aforesaid or by reason
of time being given to the Contractor or any other forbearance, indulgence, act or omission
on the part of the Authority or of any other matter or thing whatsoever which under any law
relating to sureties and guarantors would but for this provision have the effect of releasing
the Bank from its liability and obligation under this Guarantee and the Bank hereby waives
all of its rights under any such law.
6. This Guarantee is in addition to and not in substitution of any other guarantee or security
now or which may hereafter be held by the Authority in respect of or relating to the
Agreement or for the fulfillment, compliance and/or performance of all or any of the
obligations of the Contractor under the Agreement.
7. Notwithstanding anything contained hereinbefore, the liability of the Bank under this
Guarantee is restricted to the Guarantee Amount and this Guarantee will remain in force
for the period specified in paragraph 8 below and unless a demand or claim in writing
is made by the Authority on the Bank under this Guarantee all rights of the Authority under
this Guarantee shall be forfeited and the Bank shall be relieved from its liabilities hereunder.
8. The Guarantee shall cease to be in force and effect on ****$. Unless a demand or claim
under this Guarantee is made in writing before expiry of the Guarantee, the Bank shall be
discharged from its liabilities hereunder.
9. The Bank undertakes not to revoke this Guarantee during its currency, except with the
previous express consent of the Authority in writing, and declares and warrants that it has
the power to issue this Guarantee and the undersigned has full powers to do so on behalf of
10. Any notice by way of request, demand or otherwise hereunder may be sent by post
addressed to the Bank at its above referred branch, which shall be deemed to have been
duly authorised to receive such notice and to effect payment thereof forthwith, and if sent
by post it shall be deemed to have been given at the time when it ought to have been
delivered in due course of post and in proving such notice, when given by post, it shall be
sufficient to prove that the envelope containing the notice was posted and a certificate
signed by an officer of the Authority that the envelope was so posted shall be conclusive.
11. This Guarantee shall come into force with immediate effect and shall remain in force and
effect for up to the date specified in paragraph 8 above or until it is released earlier by the
Authority pursuant to the provisions of the Agreement.
Signed and sealed this ………. day of ……….., 20……… at ……….. SIGNED, SEALED AND DELIVERED
For and on behalf of the Bank by: (Signature)
(Name) (Designation) (Code Number) (Address)
(i) The bank guarantee should contain the name, designation and code number of the officer(s)
signing the guarantee.
(ii) The address, telephone number and other details of the head office of the Bank as well as of
issuing branch should be mentioned on the covering letter of issuing branch.
$ Insert date being 2 (two) years from the date of issuance of this Guarantee (in accordance with Clause 7.2 of the Agreement).
(See Clause 19.2)
Form for Guarantee for Advance Payment
See Clauses10.1 (iv) and
Contract Price Weightages
1.1 The Contract Price for this Agreement is Rs. 232.81 Cr.
1.2 Proportions of the Contract Price for different stages of Construction of the Entire Project
Corridor shall be as specified below:
Item Weightage in Stage for Payment Percentage
percentage weightage
Major Bridge (length 34.04 % A.1- Widening and repairs of
> 60 m.) works and Major Bridges
ROB/ RUB/ elevate d (1) Preparatory Work 27.58 %
section s/flyovers Dismantling and
including via ducts, if Foundation
any (2) Sub-structure 7.91 %
(3) Super-structure (including
bearings) 55.58 %
(4) Wearing Coat including
expansion joints 1.71 %
(5) Miscellaneous Items like
hand rails, crash barriers,
Signages road markings, 1.94 %
road furniture, Streetlight
(6) Wing walls/return walls -
(7) Guide Bunds, River Training 4.70 %
works, existing Pier
protection work etc.
(8) Approaches with signages, 0.08 %
65.96 % A.2- New Major Bridges
(1) Preparatory Work 31.03 %
Dismantling and
(2) Sub-structure 5.93 %
(3) Super-structure (including
bearings) 44.84 %
(4) Wearing Coat including
expansion joints 1.16 %
(5) Miscellaneous Items like 12.74 %
hand rails, crash barriers,
Signages road markings,
road furniture ,street
light,Iconic FAÇADE work
with decorative
programming lighting etc.)
(6) Wing walls/return walls -
(7) Guide Bunds, River Training
(8) Approaches, Retaining wall 3.80 %
,Toe wall ,Service Road with
signages, and Gantry
1.3 Procedure of estimating the value of work done
1.3.3 Major Bridge works, ROB/RUB and Structures.
Procedure for estimating the value of Major Bridge works, ROB/RUB and Structures
shall be as stated in table 1.3.3:
Stage of Payment Weightage Payment Procedure
A.1- Widening and (i) Foundation: Cost of each
repairs of Major Bridges Major Bridge shall be
determined on pro rata basis
(i) Preparatory work 27.58 % with respect to the total
,dismantling and foundation linear length (m) of the Major
Bridge. Payment against
foundation shall be made on
pro- rata basis on completion
of a stage i.e. not less than
25% of the scope of
preparatory work,
dismantling and foundation,
of the major Bridge subject to
completion of atleast two
foundations of the major
In case where load testing is
required for foundation, the
trigger of first payment shall
include load testing also
where specified
(ii) Sub-structure 7.91 % (ii) Sub-Structure:. Payment
against Sub- structure shall be
made on pro-rata basis on
completion of a stage i.e. not
less than 25% of the scope of
sub- structure of the major
bridge subject to completion
Stage of Payment Weightage Payment Procedure
of atleast two sub-structures
of abutments/piers upto
abutment/pier cap level of
the major bridge.
(iii) Super-structure 55.58 % (iii) Super-structure:
(including bearings) Payment shall be made on
pro-rata basis on completion
of a stage i.e. completion of
super-structure upto deck
slab including bearings of
atleast one span in as
specified here in under.
For steel girders segments,
interim payments shall be
made at 75% of the cost of
the element, as derived from
applicable SOR on base date
with tender discount /
premium applied thereon.
(iv) Wearing Coat including 1.71 % (iv) Wearing Coat: Payment
expansion joints shall be made on completion
of wearing coat including
expansion joints complete in
all respects as specified.
(v) Miscellaneous Items like 1.94 % (v) Miscellaneous: Payments
hand rails, crash barriers, shall be made on completion
road markings, Signanges, of all miscellaneous works
like hand rails, crash barriers,
Road furniture, street light
road markings ,road signages,
etc. Street light etc. complete in
all respects as specified.
(vi) Wing walls/return walls - (vi) Wing walls/return walls:
Payments shall be made on
completion of all wing
walls/return walls complete in
all respects as specified
(vii) Guide Bunds, River 4.70 % (vii) Guide Bunds, River
Training works, pier Training works: Payments
protection etc. shall be made on completion
of all guide bunds/river
training works, pier
protection works etc.
complete in all respects as
(viii) Approaches with 0.08 % (viii) Approaches: Payments
signages and gantry shall be made on completion
of both approaches including
stone pitching, protection
works, signages, Gantry etc.
Stage of Payment Weightage Payment Procedure
complete in all respects as
A.2- New Major Bridges
(i) Foundation: Cost of each
(i) Preparatory work, 31.03 % Major Bridge shall be
Dismantling work & determined on pro rata basis
Foundation with respect to the total
linear length (m) of the Major
Bridge. Payment against
foundation shall be made on
pro- rata basis on completion
of a stage i.e. Not less than
25% of the scope of
foundation of the major
Bridge subject to
completion of at least two
foundations of the major
In case where load testing is
required for foundation, the
trigger of first payment shall
include load testing also
where specified.
(ii) Sub-structure 5.93 % (ii) Sub-Structure:.
Payment against Sub-
structure shall be made on
pro-rata basis on completion
of a stage i.e. not less than
25% of the scope of sub-
structure of the major bridge
subject to completion of
atleast two sub-structures of
abutments/piers upto
abutment/pier cap level of
the major bridge.
(iii) Super-structure 44.84 % (iii) Super-structure:
(including bearings
Payment shall be made on
pro-rata basis on completion
of a stage i.e. completion of
super-structure upto deck
slab including bearings of
atleast one span in as
specified here in under.
For steel girders segments,
interim payments shall be
made at 75% of the cost of
the element, as derived from
Stage of Payment Weightage Payment Procedure
applicable SOR on base date
with tender discount /
premium applied thereon.
(iv) Wearing Coat including 1.16 % (iv) Wearing Coat: Payment
expansion joints bearings) shall be made on completion
of wearing coat including
expansion joints complete in
all respects as specified.
(v) Miscellaneous Items like 12.74 % (v) Miscellaneous: Payments
hand rails, crash barriers, shall be made on completion
road markings, Signages, of all miscellaneous works
Street light etc. like hand rails, crash barriers,
road markings, signages
Street light ,iconic FAÇADE
work with decorative
programming lighting etc.
complete in all respects as
(vii) Guide Bunds, River - (vii) Guide Bunds, River
Training works etc. Training works: Payments
shall be made on completion
of all guide bunds/river
training works etc. complete
in all respects as specified.
(viii) Approaches (including 3.80% (viii) Approaches: Payments
Retaining walls, Toe wall, shall be made on completion
Service Road with Road of both approaches including
signages etc ) Retaining walls, Toe wall,
Service Road with Road
signages etc complete in all
respects as specified.
1.3.4 Other works.
Procedure for estimating the value of other works done shall be as stated in table 1.3.4.
Stage of Payment Weightage Payment Procedure
(vii) Safety and traffic 1% Payment shall be made on
management during prorata basis every six
construction months.
2. Procedure for payment for Maintenance
(See Clause 10.2 (iv))
In compliance of the obligations set forth in Clause 10.2 of this Agreement, the Contractor
shall furnish to the Authority’s Engineer, free of cost, all Drawings listed in Annex-I of this
2. Additional Drawings
If the Authority’s Engineer determines that for discharging its duties and functions under this
Agreement, it requires any drawings other than those listed in Annex-I, it may by notice
require the Contractor to prepare and furnish such drawings forthwith. Upon receiving a
requisition to this effect, the Contractor shall promptly prepare and furnish such drawings to
the Authority’s Engineer, as if such drawings formed part of Annex-I of this Schedule-I.
List of Drawings
1. General Arrangement Drawing
2. Typical Cross Sections – TCS 1, TCS 2 & TCS
(See Clause 10.3 (ii))
Project Completion Schedule
1. Project Completion Schedule
During Construction period, the Contractor shall comply with the requirements set forth in
this Schedule-J for each of the Project Milestones and the Scheduled Completion Date.
Within 15 (fifteen) days of the date of each Project Milestone, the Contractor shall notify the
Authority of such compliance along with necessary particulars thereof.
2. Project Milestone-I
(i) Project Milestone-I shall occur on the date falling on the [37.5% of the Scheduled
Construction Period day from the Appointed Date (the “Project Milestone- I”).
(ii) Prior to the occurrence of Project Milestone-I, the Contractor shall have commenced
construction of the entire Project corridor and submitted to the Authority duly and
validly prepared Stage Payment Statements for an amount not less than 35% (thirty
five per cent) of the Contract Price and should have started construction of all
bridges of Phase 1 & Phase 2 and Phase 1 should be completed in all respect in first
3. Project Milestone-II
(i) Project Milestone-II shall occur on the date falling on the [60% of the Scheduled
Construction Period] day from the Appointed Date (the “Project Milestone- II”).
(ii) Prior to the occurrence of Project Milestone-II, the Contractor shall have continued
with construction of the entire Project corridor and submitted to the Authority duly
and validly prepared Stage Payment Statements for an amount not less than 55%
(fifty-five per cent) of the Contract Price and should have started construction of all
4. Project Milestone-III
(i) Project Milestone-III shall occur on the date falling on the [85% of the Scheduled
Construction Period] day from the Appointed Date (the “Project Milestone- III”).
(ii) Prior to the occurrence of Project Milestone-III, the Contractor shall have continued
with construction of the of the entire Project corridor and submitted to the
Authority duly and validly prepared Stage Payment Statements for an amount not
less than 80% (eighty per cent) of the Contract Price and should have started
construction of all project facilities.
5. Scheduled Completion Date
(i) The Scheduled Completion Date shall occur on the [Scheduled Construction Period]
day from the Appointed Date.
(ii) On or before the Scheduled Completion Date, the Contractor shall have completed
construction in accordance with this Agreement.
6. Extension of time
Upon extension of any or all of the aforesaid Project Milestones or the Scheduled
Completion Date, as the case may be, under and in accordance with the provisions of this
Agreement, the Project Completion Schedule shall be deemed to have been amended
(See Clause 12.1 (ii))
Tests on Completion
1. Schedule for Tests
(i) The Contractor shall, no later than 30 (thirty) days prior to the likely completion of
construction, notify the Authority’s Engineer and the Authority of its intent to subject the
Project Highway to Tests, and no later than 10(ten) days prior to the actual date of Tests,
furnish to the Authority’s Engineer and the Authority detailed inventory and particulars of all
works and equipment forming part of Works.
(ii) The Contractor shall notify the Authority’s Engineer of its readiness to subject the Project
Highway to Tests at any time after 10 (ten) days from the date of such notice, and upon
receipt of such notice, the Authority’s Engineer shall, in consultation with the Contractor,
determine the date and time for each Test and notify the same to the Authority who may
designate its representative to witness the Tests. The Authority’s Engineer shall thereupon
conduct the Tests itself or cause any of the Tests to be conducted in accordance with Article
12 and this Schedule-K.
(i) Visual and physical test: The Authority’s Engineer shall conduct a visual and physical check of
construction to determine that all works and equipment forming part thereof conform to
the provisions of this Agreement.
(ii) Riding quality test: Riding quality of each lane of the carriageway shall be checked by Visual
inspection with the help of a Network Survey Vehicle (NSV) fitted with latest equipments
and the maximum permissible roughness for purposes of this Test shall be [2,000 (two
thousand)] mm for each kilometre.
(iii) Tests for bridges: All major and minor bridges shall be subjected to the rebound hammer
and ultrasonic pulse velocity tests, to be conducted in accordance with the procedure
described in Special Report No. 17: 1996 of the IRC Highway Research Board on Non-
destructive Testing Techniques, at two spots in every span, to be chosen at random by the
Authority’s Engineer. Bridges with a span of 15 (fifteen) metres or more shall also be
subjected to load testing.
(iv) Other tests: The Authority’s Engineer may require the Contractor to carry out or cause to
be carried additional tests, in accordance with Good Industry Practice, for determining the
compliance of the Project Highway with Specifications and Standards, except tests as
specified in clause 5,but shall include measuring the reflectivity of road markings and road
signs; and measuring the illumination level (lux) of lighting using requisite testing
(v) Environmental audit: The Authority’s Engineer shall carry out a check to determine
conformity of the Project Highway with the environmental requirements set forth in
Applicable Laws and Applicable Permits.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 RFP_Subhashbridge_Feb 2026.pdf
2 EPC_Agreement_Feb 2026.pdf
3 EPC_Schedules _Feb 2026.pdf
4 SUBHASH BRIDGE GAD 01 GAD (EXISTING BRIDGE PROPOSED).pdf
5 TCS DETAILS.pdf
6 Sabarmati Soil Report Reference.pdf
7 Geo Dynamics Foundation Integrity.pdf
8 SUBHASH BRIDGE-NDT REPORT_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .