Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹21,175
Closing Date
28 Sept 2026, 2:00 pmDue tomorrow
OfficeofAssistant EngineerLIDEWSectionMudakuzhaGP
OfficeofAssistant EngineerLIDEWSectionMudakuzhaGP
235/26-27 Compound wall renovation for Anganwady No 73 chundakuzhy in ward 4 of Mudakuzha GP
2026_LSGD_839790_10
10/AE/LSGD/MUDAKUZHA/25-26
Open Tender
Civil Works - Others
Item Rate
Mudakuzha GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
₹21,175
18 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1compound wall | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 41.21 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.93 | cum | - | - |
| 1.003 | OD182783/2026-2027:60.7.3 DISMANTLING DR - Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 35.1 | cum | - | - |
| 1.004 | OD92576/2026-2027:60.7.8 DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 53.98 | cum | - | - |
| 1.005 | OD92578/2026-2027:60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 110.82 | cum | - | - |
| 1.006 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.61 | cum | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 21.35 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 742.98 | kilogram | - | - |
| 1.009 | OD186542/2026-2027:Laterite masonry with neatly dressed departmental laterate stone in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 2 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
235sbd.pdf
Tender Documents • 1.72 MB
235nit.pdf
Tender Documents • 0.03 MB
BOQ_1475875.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .