| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 CrAdmitted-Finance | -22.29% | ₹8.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.9 Cr+₹5.4 L (0.61%)Admitted-Finance | -21.22% | ₹8.9 Cr+₹5.4 L (0.61%) | L2 | Admitted-Finance |
| 3 | L3₹9.1 Cr+₹23.9 L (2.70%)Admitted-Finance | -20.11% | ₹9.1 Cr+₹23.9 L (2.70%) | L3 | Admitted-Finance |
| 4 | L4₹9.3 Cr+₹40.6 L (4.58%)Admitted-Finance | -18.57% | ₹9.3 Cr+₹40.6 L (4.58%) | L4 | Admitted-Finance |
| 5 | L5₹9.5 Cr+₹64.6 L (7.29%)Admitted-Finance | -17.01% | ₹9.5 Cr+₹64.6 L (7.29%) | L5 | Admitted-Finance |
Tender Value
₹11.3 Cr
Closing Date
26 Jul 2021, 6:00 pmClosed
EE, RSAMB, Jodhpur-II
EE, RSAMB, Mandore mandi Jodhpur-II
Construction of TAD Girls Hostel, Multipupose Hostel and Additional Commisioner Office for Tribal Area Development Department ( TAD) at HQ_JODHPUR
2021_RSAMB_233037_1
NIT-04_2021-22
Open Tender
Civil Works - Buildings
Percentage
540 days
Jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
ICICI Bank A/C No 683401030353 IFSC ICIC0006834
Exempted
2 Aug 2021
16 Jul 2021
27 Jul 2021
16 Jul 2021
26 Jul 2021
16 Jul 2021
Amount
PART "A" CIVIL WORK NON BSR Providing & Fixing structural glazing using semi unitized system using aluminimum section of Jindal/ Hindalco/Mahaveer make for main mullion, corner mullion main transom and top & bottem transom for main frame and single glass shutter section as per approved drawing & design anodised to the required shade in minimum thickness of 15 micron & fixed to existing structure by GI brackets/ Structural fastener (Fisher/Hitich or equivalent make ) and fixing of toughened Safire blue glass 5mm thick pyrolatic solar control coated heat reflective glass of Saint Gobain/ Emirates/ Glaverble or equivalent make in blue shed ( to be got approved by Engineer In charge before execution). the glass is to be fixed to the single shutter unit frame with Structural Silicone glass sticking system using pressure grouting as per manufacture specifications G.E. / Dow Corning /Wecker make. The unit so manufacture specification - GE/Dow/Corning/ Weeker make including backer rods. The quoted rate to includes all scaffolding , lift & lead, fixing of system in curved areas final cleaning , civil works for fixing of system, complete as per direction of Engineer In charge. Panel size of Glass panes should not maore than 75cm x 75 cm.
Providing and laying CNS (Cohesive non swelling) layer below PCC block/ CC liningin required thickness comprisingofclaysilt and gravel mixed in desired ratio including excavation in borrow area / quarry, transportation to work site with all leads and lifts of all ingredients, mixing homogeneously by suitable method, laying in layers of 15-20 cm watering and compaction by mechanical vibro compactor to achieve a density of 98 % of standard proctor's density including dewatering whenever necessary and complete as per technical specifications. Ingredients of CNS layers are: - (i) clay 20% (ii) Silt 35%(iii) Sand 40%(iv) gravel 5%
PIC of incerator (Sanitary Napkin Destroyer) automated electric operated loading capacity 5 in one go to 100 in 8 hrs wall mounted ecofriendly Wt 30-40 kg with warrenty 2 years in MS cabin with epoxy anti jstic paint paint automated and operated electrically to burn completely the used Sanitary Napkins and create an Environmental friendly atmosphere as approved by Engineer-in-charge.
Filling the gap upto 5 mm depth and 5 mm width in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete. (Jaipur BSR 2019 item no 16.7)
Add Extra for using M.S.clips of special design for spacing from mounted wall for holding 110mm dia. Pipe with all required Z Channel, nuts and fastner, including the painting of clips with redoxide and emulsion paint as per direction of engineer-in-charge. Calculation as Per Holding Each 4 Mtr. Pipe
Add extra for Providing and Fixing Fiber Glass mesh 80 GSM, 2M x 300M on outer AAC Block walls including the cost of fixing with nails. Complete in all respect as per directions of engineer in charge.
PART "B" ELECTRIC WORK NON BSR ITEM Supplying, installation, Testing and commissioning of the passenger/goods/Stretcher or Bed elevator having following main features:
(a) MOTOR : Gearless lift drive comorising of high starting torque lift duty, 3 phase 440 Volts A.C. permanent magnetic synchronous motor of proper rating with high efficiency shell be used.
( c ) Traction Media : Main hoist flat coated steel belt / rope. Thimbles of spring permit adjustment of uniform tension for smooth operation of the elevator Pulse belt monitoring system to avoid the cut in the belt.
(d) Car : Car should be with M S platform with bracing of adquate size and to sustain the impact load cabin plus passengers with safety factor of fire for steel with Anti skid PVC flooring and side panels should be of Stainless steel with hair line finish of sheet of grade 304 duty with S.S. handralis. Car ceiling shall be steel finish with aesthetic appearances with LED ceiling lights. The size of the car shall be taken as per available lift well size and relevant BIS code of lifts. Car panel will also be of S.S. 304 grade finished with emergency stop device, emergency alarm, mechanical door safety device, full lenght infra-red curtain in car door, facility of auto/attended mode. All car panel buttons and all floor switches must be with brail language as per lift act. Agency shall also provide & instell one No. 2 MP, IR, IP based ceiling mounted Dome Camerain the car complete with connecting cables & accessories (To be connected with existing CCTV system in the Building). The insoection unit shall be provided at the top of the car.
(e) Landing Doors : All landing door shall be fully automatic centre opening / telescopic made of hair line finish stainless steel grade 304 with key holes and infrared curtains with unlocking facility from outside.
(f) Emergency light : Appropriate rechargeable battery operated LED emergency light in the car and along with alarm switch shall be provided.
(g) ARD : Automatic rescue Device (ARD) shall be provided according to passenger capacity with SMF batteries af approved brands as per BSR.
(h) Audio - visual Indication : Audio visual indication in the lift car, showing over loading such that doors kept open till excess load is removed.
(i) Scrolling Indicators : Digital scrolling indicator system for up-down arrow with floor position indicator shall be provided inside the car and at all stops/floors.
(j) Buffers : Spring buffers/PU Buffers shall be provided.
(k) Car Fan : ENERGY EFFICIENT Car fan/blower with automatic sleep timer shall be provided.
(l) Voice Annunciator : Voice annunciator with suitable music timer shall be provided in lift car.
(m) Self diagnostics system for operational and safty paramenters shall be provided in control panel.
(n) Mechanical/Electronic over speed governor, door key holes in the floor doors, fireman switch shall be provided.
(o) lift machine hoisting arrangement in the lift machine room, counter balcnce to promote smoth and economic operation complete with steel guide rails for the car & counter weight, Trap Door, Lifting hooks as required and monkey ladders for lift pit should be provided by the agency along with all other steel structure works, foundations for the machine etc as required.
(p) Permanent wiring in lift machine room and in lift well with providing and fixing of electrical distiribution board complete with SP & TP MCB'S proper numbers of light points, with LED fixtures, exhaust fan, 2 nis copper plate/ chemical earthing with 8 SWG copper earth wire and plug points shall be provided by the agency. (Power supply of 3 phase 440 V shall be made available by department in lift machine room).
(q) All civil work related to installation of lift like finishing, cleaning and levelling of lift pit, white wash of lift well and in machine room shall be done by the lift erecting agency without any extra cost.
( r) Granite or marble cladding around all landing door openings shall be in the scope of lift installation agency and additional payment shall be made according to the actual measurement/ schedule by the department to the lift agency.
(s) Agency has to provide all working drawing and documents to comply latest BIS specification and make proper liasion services for obtaining all necessary permissions.
13 Passengers/884 kg, 3 stops, rated speed adjustable up to 1.0 mtr/sec with 2 years comprehensive maintenance/ DLP. (Note Base Rs. 65000/- only 2 Stop)
FAZLUR-REHMAN AND SONS
M/S Naresh Kumar Goyal
naveen kumar
JAI BABA CONSTRUCTION COMPANY
naveen kumar
M/S Naresh Kumar Goyal
M/S JEET CONSTRUCTION CO
JAI BABA CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BID_DOCUMENT.pdf
Tender Documents • 5.13 MB
Technical_Bid.pdf
Additional Documents • 0.22 MB
Other_Document.pdf
Other Document • 2.88 MB
BOQ_415867.xls
BOQ • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .