Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 472 C 1 TOCOL MACHINE TOOLS PRIVATE LIMITED 13TH CROSS 4TH PHASE PEENYA INDUSTRIAL AREA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹20.1 L
Closing Date
22 Feb 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard, Naval Base, Karwar 581308.
UNDERTAKING ONE YEAR EXTENDABLE TO TWO MORE YEARS RRC FOR ROUTINES REPAIRS OF TURBO DRIVEN AUXILIARIES (TDFL PUMP TURBO GENERATOR TD AC TURBO DRIVE (MTXM2000) AND FEED CONDENSATE BOOSTER TRANSFER PUMP (FCBT) ONBOARD INS VIKRAMADITYA
2024_NAVY_642684_1
REG-RRC-9001-TD AUX-2023-24-0391
Single
Marine Services
Item Rate
1095 days
NAVAL SHIP REPAIR YARD, NAVAL BASE, KARWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20.1 L
Yes
23 Feb 2024
16 Feb 2024
23 Feb 2024
17 Feb 2024
22 Feb 2024
17 Feb 2024
Amount
Feed Condensate & booster Transfer Pump (FCBT):-4000 Hrly Routines
4000H1- Check serviceability of electro hydraulic manipulators.If any part found deteriorated, replace it.
4000H2- Check axial float of the turbine. If any part found deteriorated, replace it.
4000H3- Check seals of servomotor for leaks. If any part found deteriorated, replace it.
4000H4- Check setting of protection system as per technical document.
4000H5- Renew packing of seals of feed and condensate booster pump. If any part found deteriorated, replace it.
4000H6- Check circuits of protection and alarm system pressure drop as per para 6.2.6 and 6.2.7 of operating manual. If any part found deteriorated, replace it.
24000 Hrly Routines
24000H1- Carry out 4000 hourly routines. If any part found deteriorated, replace it.
24000H2- Check condition of unloading device by taking the axial clearance of feed pump rotor. If any part found deteriorated, replace it.
24000H3- Check and replace if required, the rubber rings, seals, and springs of servomotors, bellows of drop regulator, signalling devices, drop meter and manipulators. If any part found deteriorated, replace it.
24000H4- Replace the bottom bearings on water lubrication of feed and booster condensate pumps. If any part found deteriorated, replace it.
24000H5- Replace the bushes of shafts under the seals of feed and condensate booster pump. If any part found deteriorated, replace it.
Service - Inspection of toothed coupling of feed and condensate- Booster pump. (a) De-couple the pumps from drive rotor. (b) Inspect the coupling teeth and fixing keys. (c) If any part found deteriorated, replace it.
Service - Overhauling of feed pump. (a) Transport the pump to repair facility. (b) Carry out overhauling of pump as per maintenance manual. (c) Balance the feed pump rotor dynamically. (d) Record all clearances and dimensions in logbook. (e) Shipping/unshipping of Feed pump assembly. If any part found deteriorated, replace it.
Service - Overhauling of Condensate-booster pump. (a) Transport the pump to repair facility. (b) Carry out overhauling of pump as per maintenance manual. (c) Balance the feed pump rotor dynamically. (d) Record all clearances and dimensions in logbook. (e) Shipping/unshipping of Condensate--booster pump assembly. If any part found deteriorated, replace it.
Service - Overhauling of Geared-Turbine assembly. (a) Perform condition inspection of turbine nad gearbox assembly at factory. (b) Renew all ball bearing (c) Hydraulic testing of water chamber and turbine casing to be undertaken. (d) Renew all parts which found defective during technical condition inspection. (e) .Carry out dynamic balancing of turbine rotor, intermediate gear and secondary gear. If any part found deteriorated, replace it.
Routines TDFL Pump :-Annual Routine
A4- Check servicability and undertake adjustment of regulation and Protection assemblies.If any part found deteriorated, replace it.
Five Annual Routine
5A1- Remove all pipes and valves. If any part found deteriorated, replace it.
5A2- Disassemble the Turbodrive into assemblies and parts. reassemble of regulation and protection assemblies. undertake cleaning, oil washing, visual inspection and measurement of parts and grinding of split surfaces. disassemble the screw pump, remove pump screws and visually inspect internal surfaces of case. check turbine rotors, reduction gear and pump for runout. If any part found deteriorated, replace it.
5A3- Undertake routine repair of valves and filters. If any part found deteriorated, replace it.
5A4- Carry out hydraulic tests of the pump. If any part found deteriorated, replace it.
5A5- Carry out alignment of turbine with pump. If any part found deteriorated, replace it.
Ten Annual Routine
10A1- Undertake medium repair of the pump. If any part found deteriorated, replace it.
4000H3 - Check the protection system adjustment according to operating document . If any part found deteriorated, replace it.
4000H5 - Carry out maintenance of fuel pump in accordance with om h41. If any part found deteriorated, replace it.
24000H1 - Carry out revision of CAFS units replacing the springs refer section 11.5 of operating document . If any part found deteriorated, replace it.
MR1 - Overhaul Turbo Driven fuel pump in accordance with section 11 of 01. If any part found deteriorated, replace it.
Service - Overhaul and set the turbine relief valve. If any part found deteriorated, replace it.
Service - Overhaul and set the pump relief valve. If any part found deteriorated, replace it.
Service - Overhaul the hand lub oil pump. If any part found deteriorated, replace it.
Turbo Alternator:-2000 Hourly Routines
2000H7 - Check the condition of the units on which operation comments were made during the preceding operation period. If any part found deteriorated, replace it.
2000H8 - Check the pressure differential governor of the starting oil pump, in case of sludge in the governor. If any part found deteriorated, replace it.
2000H9 - Check the rotor run out in the thrust bearing. If any part found deteriorated, replace it.
2000H10 - On completing of the service life (10000-12000 hrs.), replace the major parts of Turbo alternator. If any part found deteriorated, replace it.
2000H12 - Carry out the inspection/ renewal of metal balls of lub oil system shuttle valves/ NR valves. If any part found deteriorated, replace it.
Short Refit Routines
SR1 - Inspect 25% of system valves. If any part found deteriorated, replace it.
SR3 - Open all units of governing and protection units and remove the sludge. If any part found deteriorated, replace it.
5 Annual Routines
5A2 - Open and check all bearings of T/A. If any part found deteriorated, replace it.
5A3 - Check the journals, thrust collars, white metal lining and thrust block. If any part found deteriorated, replace it.
5A4 - Check the rotor working position and rotor run out. If any part found deteriorated, replace it.
5A5 - Check and clean the sump from deposited sludge by rolling out the lower half-liners. If any part found deteriorated, replace it.
5A6 - Open and check the governor and protection units. If any part found deteriorated, replace it.
5A7 - Check thoroughly the bushing, slides, springs and other parts. If any part found deteriorated, replace it.
5A8 - Check the bellows and governor and protection units, if any part deteriorated replace it.
5A9 - Open the steam distributor and check the valves, seats, bellows and rods thoroughly. If any part found deteriorated, replace it.
5A10 - Open the steam stop valve and check the bellow and steam admission screen. If any part found deteriorated, replace it.
5A11 - Check the parts of turning gear. If any part found deteriorated, replace it.
5A12 - Open and check the starting oil pump. If any part found deteriorated, replace it.
5A13 - Check the injectors nozzles for cleanness. If any part found deteriorated, replace it.
5A14 - Check the fixing dimensions of the injector nozzles. If any part found deteriorated, replace it.
5A15 - Open the oil cooler covers and check the inner surfaces of the oil cooler tubes as well as tube sheets and protectors. Clean the tube inner surfaces. If any part found deteriorated, replace it.
5A16 - Pressure test lub oil cooler. If any part found deteriorated, replace it.
5A17 - Open the ejector and check the nozzles and diffusers for wear and cleanness. If any part found deteriorated, replace it.
5A18 - Inspect labyrinth glands. If any part found deteriorated, replace it.
5A19 - Open the covers of ejector cooler water chambers and check the tube sheets, covers and protectors. Clean the tube inner surfaces. If any part found deteriorated, replace it.
5A20 - Pressure test air ejector coolers. If any part found deteriorated, replace it.
5A21 - Open the condenser water chambers and check the tube sheets surface, tubes and protector. If any part found deteriorated, replace it.
5A22 - Check the condition of condenser steam surface through turbine exhaust inlet. If any part found deteriorated, replace it.
5A23 - Overhaul completely the oil-water-steam pipeline fittings. Eliminate the defects revealed. If any part found deteriorated, replace it.
5A24 - Carry out the sampling of the fastening material fitted new. If any part found deteriorated, replace it.
5A25 - Check the condition of the pipelines by sampling. If any part found deteriorated, replace it.
Turbo Generator Seawater Pump:-Occasional Routines
01 - All rubber items are to be replaced whenever the pump is dismantled for repair/overhaul. If any part found deteriorated, replace it.
25000 Hourly Routines
25000H1 - Replace the impeller. If any part found deteriorated, replace it.
50000 Hourly Routines
50000H1 - Replace the end face seal assembly. If any part found deteriorated, replace it.
50000H2 - Replace the sealing rings. If any part found deteriorated, replace it.
Normal Refit Routines
NR1 - Renew all SV mounts. If any part found deteriorated, replace it.
Service- Gear box inspection. (a) Excute the tasks as per ser 1. (b) Carry out visual inspection of gears (c ) Open bearing and check the oil clearance using lead wire. If any part found deteriorated, replace it.
Repair and setting to work of Gland steam regulator. (a) Degutting/Removal of the assembly from foundation. (b) Disassemble the unit in full scope. (c ) Remove differential piston along with stem. (d) Remove slide valve assembled with stem. (e ) Carry out technical condition inspection of gland steam regulator and its parts by visual inspection, undertake dye penetrant test of problem section, carry out quality inspection checks of parts. (f) Check run out stem assembled with slide valve. (g) Carry out replacementment of parts view crumpling of accordinons of bellows, cracks or leakages of welds, and deformation of spring. (h) rough- Grind places of contact of spherical surface of membrane and flat spring preserving the sphere. (j) Replace the stuffing of angle valves. (k) Check the movement of piston and slide valve under its own weight should be smooth with out seizures. (l) Carry out STW post assembly. If any part found deteriorated, replace it.
Service- Overhauling and setting to work of feed controller. (a) Unistall feed controller from condenser. (b) Deassembled and check the parts for any mechanical damage. (c ) Check and if required, replace the diaphragm bundle and nozzles from SPTA. (d) Check the seals and joints for damage and leakages. (e ) Check the backlash of drive elements of servo motor, regulative valve and spring. (f) Carryout settig to work on test rig. (g) Overhaul the actuator assembly. If any part found deteriorated, replace it.
Service -Inspection & Repair of steam reducer. (a) Dissemble the steam reducer. (b) Carry out technical condition inspection of internal parts and cavity. (c ) Check piston, Piston rings, springs, seat,stem etc. for damage and replace defective parts/components. (d) Assemble the reducer and carry out functional checks onboard ship. If any part found deteriorated, replace it.
Service - Repair /Refurbishment of steam Distributer. (a) Nozzle and valve seat t be lapped and tested for leakages view found jammed and pitting and deposits observed on valve lid and seat. (b) Steel bellows to be checked and replaced if required. (c) Check clearance in ball joints, replace the bronze bearing if required. (d) Grease all joints. If any part found deteriorated, replace it.
Service - Setting to work regulation and protection unit. (a) Carry out STW of cutoff slide valve (b) Set/tune the pressure corrector. (c) Set/tune the irregularity arrangement component. (d) Check and set the over speed trip. (e ) Set the low lub oil trip. (f)Check the operation of hand trip. (d) Load trials tobe undertaken. If any part found deteriorated, replace it.
Service- Quick closing valve(QCV) (a) Remove the QCV from steam distribution assembly. (b) Dismantle the QCV using special attachment. (c ) Check condition of steam strainer. Replace if required. (d) Check condition of bushing, case, valve seat, stem, piston rings oil valve, spring, bellow, bearings, measure and record all dimensions. (e ) Replace the components if found defective/dimensions more than designed limit. (f) Post-assembly, check the servicieablity of quick closing valve on test bench. If any part found deteriorated, replace it.
TD A/C Turbo Drive (MTXM2000):-5000 Hourly Routines
5000H1 - Open and clean the oil filters. If any part found deteriorated, replace it.
5000H2 - Check the conditions of the protectors of the condenser, oil cooler and ejector. Replace protectors in case the wear of their working section is more than 50%. If any part found deteriorated, replace it.
5000H7 - Dismantle and inspect the differential pressure governor of the starting oil pump. In case of great amount of sludge in the governor, open the cut-off pilot. If necessary, open and clean sludge from all components of the governor unit and those of the protector unit. If any part found deteriorated, replace it.
5000H8 - Check the rotor wear down in the thrust bearing. If any part found deteriorated, replace it.
5000H9 - When the service life (10000 to 12000 hours) is over, replace the following components - Pressure relay, Type Ⱦ21K1 - Electric motors, Type AȾH-100 and ȾM160MB4 - Electric magnet, Type ɗM33-71311 - Voltmeter, Type M1618T - Micro switch, Type Ⱦ311. If any part found deteriorated, replace it.
5000H10 - Carry out calibration of Feed regulator and complete flushing through of the system. If any part found deteriorated, replace it.
Normal Refit Routines
NR1 - Inspect 50 % of system lines. If any part found deteriorated, replace it.
NR2 - Dismantle completely and clean all pipes of the oil system and oil tank. If any part found deteriorated, replace it.
NR4 - Disassemble the governor unit and protection unit; inspect thoroughly the bushings, pilot valves, springs and other parts. Rectify observed defects. Check the bellows, governor unit and protection unit for medium tightness using Kerosene. Replace them, if necessary. If any part found deteriorated, replace it.
NR5 - Disassemble the steam distributor, inspect thoroughly the valves and seats, Check the bellows and rods for proper state. Check the mounting dimensions and clearances for their compliance with those specified in the Log. If any part found deteriorated, replace it.
NR6 - Dismantle the stop valve. In case of sluggish operation; inspect thoroughly the bellows and steam screen. If any part found deteriorated, replace it.
NR7 - Open the turbine steam section. Inspect the rotor flow path, packings, nozzle segments and guide apparatus. Measure accessible clearances of the flow path. If any part found deteriorated, replace it.
NR8 - Dismantle and inspect the barring/turning gear. If any part found deteriorated, replace it.
NR9 - Overhaul Oil pumps, in case of abnormality during last operation. If any part found deteriorated, replace it.
NR10 - Check the injector nozzle for its cleanness. Check the mounting dimensions. If any part found deteriorated, replace it.
NR11 - Remove the oil cooler covers. Inspect the inner surfaces of the oil cooler tubes as well as tube sheets and protectors. If necessary, clean the tube inner surfaces. Test the oil cooler water space under the hydraulic pressure. If any part found deteriorated, replace it.
NR12 - Open the Ejector and check the nozzle and diffuser for wear, cleanness and right installation. Replace the nozzle in case of its erosion. Dismantle the steam filter and check for it cleanness. Open the covers of the ejector cooler water chambers, inspect the tube sheets, covers, protectors, clean the tube inner surfaces. Test the ejector cooler water space under the hydraulic pressure. If any part found deteriorated, replace it.
NR13 - Open the condenser water boxes, wash and clean the tube sheet surfaces, inspect tubes and protectors. Inspect the condition of the condenser steam surface via the turbine exhaust pipe union. Dismantle, inspect, replace, if necessary, and reassemble the oilwater-steam pipeline fittings. If any part found deteriorated, replace it.
NR15 - Inspect the bolted connections. Carry out the laboratory sampling analysis of the refitted fasteners material. If any part found deteriorated, replace it.
NR16 - Check condition of mounts of turbine. Replace if necessary. If any part found deteriorated, replace it.
Repair and setting to work of Gland steam Regulator. (a) Degutting/ Removal of the assembly from foundation. (b) Disassemble the unit in full scope. (c) Remove differential piston along with stem. (d) Remove slide valve assembled with stem. (e) Carry out technical condition inspection of gland steam regulator and its parts by visual inspection. undertake dye penetrant test of problem sections. Carry out quality inspection checks of parts. (f) Check run out of stem assembled with slide valve. (g) Carry out replacement of parts view crumpling of accordions of bellows, cracks or leakages of welds and deformation of spring. (h) Rough-grind places of contact of spherical surface of membrance and flat spring preserving the sphere. (j) Replace the stuffing of angle valves. (k) Check the Movement of piston and slide valve under its own weight should be smooth without seizures. (l) carry out STW post assembly. If any part found deteriorated, replace it.
Service - Overhauling and setting to work of feed controller- (a) Uninstall feed controller from condenser. (b) Disassemble and check the parts for any mechanical damage. (c ) Check and , if required. Replace the diaphragm bundle and nozzles from SPTA. (d) Check the seal and joints for damage and lekage. (e ) Check the backlash of drive elements of servo motor, regulating valve and spring. (f) Carry out setting to work on test rig. (g) Overhaul the actuator assembly If any part found deteriorated, replace it.
Service- Inspection & Repair of steam reducer. (a) Disassemble the reducer. (b) Carry out technical condition inspection of internal parts and cavity. (c ) Check piston, piston rings, springs, seat, steam etc, for damage and replace defective [arts/components. (d) Assemble the reducer and carry out functional checks onboard ship. If any part found deteriorated, replace it.
Service - Repair/refurbishment of steam Distributer. (a) Nozzle and valve seat to be lapped and tested for leakages view found jammed and pitting and deposits observed on valve lid and seat. (b) Steel bellows to be checked and replaced if required. (c) Check clearance in ball joints, replace the bronze bearing if required. (d) Grease all joints. If any part found deteriorated, replace it.
Service - Deputation of service Engineer for HAT - days/TDAC.
Service - Deputation of service Engineer for SAT - days
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .