Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC | L1 | Accepted-AOC L1 and Reasonable | |
| 2 | L2₹28.3 L+₹1.4 L (5.33%)Rejected-AOC | L2 | Rejected-AOC Not L1 | |
| 3 | L3₹28.4 L+₹1.6 L (5.80%)Rejected-AOC H NO 19 6 243 1 NGO S COLONY SHIV NAGAR NORTH BIDAR 585401 | BIDAR | KARNATAKA | 585401 | L3 | Rejected-AOC Not L1 | |
| 4 | L4₹28.6 L+₹1.7 L (6.48%)Rejected-AOC | L4 | Rejected-AOC Not L1 | |
| 5 | L5₹29.7 L+₹2.9 L (10.7%)Rejected-AOC | L5 | Rejected-AOC Not L1 |
| Sl No | Description | Qty | Unit | M/s.Santosh Kotarki L2 | M/S RUDRAPPA CONSTRUCTIONS L1 | Mr Madhusudhan Kotarki L6 | AMAR CONSTRUCTION L5 | Siddique constructions L4 | SAYED MUSTAQ AHMED L7 | RAMESH CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00Note : All items to be operated under subject work is to be executed in restricted hours and availability of site will be as per flying schedule. On account of any misunderstanding in this regards, nothing extra is admissible. The quoted rates shall be deemed to consider above factors. | ||||||||||
| 1.00 | Grass cutting on shoulder of Run way, taxi tracks, over run area and adjacent areas as necessary including cleaning away all grass, vegetation sapling, shrubs, bush weed, undergrowth, roots, trees not exceeding 20 cm girth and removing rubbish etc., complete to a distance of 1.00 to 1.50 KM from the starting point complete all as specified and as directed.
Note: -
(i) Cutting and trimming of grass above ground level shall be done using mechanical grass cutter machine with operator and manual labour is permitted as per requirement of authorities of AF Station Bidar and as directed by Engineer-in-Charge.
(ii) Minimum 4 Nos of heavy duty petrol bush cutter (Grass cutting machine) having minimum daily output of 5000 sq m grass cutting per day is required along with operator.
(iii) The quoted rate shall deemed to inclusive of above provisions and nothing extra is payable in this regards. | 6,00,000 | SQUARE METRE | 2.1 ₹12,60,000 | 2 ₹12,00,000 | 2.2 ₹13,20,000 | 2.1 ₹12,60,000 | 2.15 ₹12,90,000 | 1.5 ₹9,00,000 Lowest | 2.15 ₹12,90,000 |
| 2.00 | All as per Serial Item No 1 here-in-above, but grass scrapping and de-rooting the vegetation / Grass, creepers along the lights of runways complete all as specified and as directed. | 80,000 | SQUARE METRE | 2.6 ₹2,08,000 | 2.4 ₹1,92,000 | 2.7 ₹2,16,000 | 2.6 ₹2,08,000 | 2.7 ₹2,16,000 | 1.5 ₹1,20,000 Lowest | 2.55 ₹2,04,000 |
| 3.00 | Demolition of stone masonry / brick work / PCC block masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars etc., complete all as specified and as directed. | 59.64 | CUBIC METRE | 650 ₹38,766 | 600 ₹35,784 Lowest | 1,000 ₹59,640 | 900 ₹53,676 | 670 ₹39,958.8 | 1,500 ₹89,460 | 600 ₹35,784 Lowest |
| 4.00 | Material and labour for providing Pre-cast cement concrete block masonry with Grade 'C' solid block, exceeding 10 cm in width, having minimum compressive strength of 50 Kg / Sq cm as per IS 2185 (Part-I) 2005 and set in CM 1:6 complete all as specified and as directed. | 59.64 | CUBIC METRE | 7,020 ₹4,18,672.8 | 6,900 ₹4,11,516 | 7,600 ₹4,53,264 | 7,500 ₹4,47,300 | 7,030 ₹4,19,269.2 | 5,000 ₹2,98,200 Lowest | 7,100 ₹4,23,444 |
| 5.00 | Material and labour for 50 mm dia UPVC pipes of pressure rating 10 Kg f / Sq cm laid in trenches / weep holes complete all as specified and as directed. | 21.3 | RUNNING METRE | 220 ₹4,686 | 200 ₹4,260 Lowest | 260 ₹5,538 | 250 ₹5,325 | 230 ₹4,899 | 500 ₹10,650 | 200 ₹4,260 Lowest |
| 6.00 | Material & Labour for plain cement concrete of 1:2:4 type B0 (using 12.5mm graded stone aggregate) as in copings, bed plates etc. including necessary formwork, complete all as specified and as directed. | 6.39 | CUBIC METRE | 7,000 ₹44,730 | 6,900 ₹44,091 | 8,000 ₹51,120 | 8,000 ₹51,120 | 7,000 ₹44,730 | 4,500 ₹28,755 Lowest | 7,100 ₹45,369 |
| 7.00 | Material and Labour for Rendering 15 mm thick in CM (1:4) on fair faces of brick or concrete surfaces finished fair and even in external surfaces complete all as specified and as directed. | 383.4 | SQUARE METRE | 260 ₹99,684 | 250 ₹95,850 Lowest | 310 ₹1,18,854 | 300 ₹1,15,020 | 270 ₹1,03,518 | 320 ₹1,22,688 | 260 ₹99,684 |
| 8.00 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for roof /chajja padding including removal of debris outside MD land, complete all as specified and as directed. | 46.33 | CUBIC METRE | 910 ₹42,160.3 | 900 ₹41,697 Lowest | 1,000 ₹46,330 | 1,000 ₹46,330 | 920 ₹42,623.6 | 1,200 ₹55,596 | 950 ₹44,013.5 |
| 9.00 | Material and labour for Plain Cement concrete 1:4:8 type D2 using 40mm graded stone aggregate for foundation filling and mass concreting complete all as specified and as directed. | 31.95 | CUBIC METRE | 5,020 ₹1,60,389 | 5,000 ₹1,59,750 | 6,100 ₹1,94,895 | 6,000 ₹1,91,700 | 5,030 ₹1,60,708.5 | 4,500 ₹1,43,775 Lowest | 5,000 ₹1,59,750 |
Tender Value
₹34 L
EMD Value
₹68,000
Closing Date
12 Jul 2025, 6:00 pmClosed
GE (AF) Bidar
Garrison Engineer (Air Force) Bidar, Military Engineer Services, Air Force Station Bidar, Bidar-585401
GRASS SCRAPING, DE-ROOTING VEGETATION, CREEPERS ETC USING BUSH CUTTERS ALONG RUNWAY AND REPAIRS TO DRAINS 2-20 AND 8-26 ENDS AT AFS BIDAR
2025_MES_716101_1
GE(AF)/BID/TOKEN/12 OF 2025-2026 8159
Open Tender
Civil Works
Item Rate
270 days
Bidar
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) Bidar
₹68,000
Yes
24 Sept 2025
21 Jun 2025
19 Jul 2025
21 Jun 2025
12 Jul 2025
5 Jul 2025
21 Jun 2025 - 28 Jun 2025
Amount
Note : All items to be operated under subject work is to be executed in restricted hours and availability of site will be as per flying schedule. On account of any misunderstanding in this regards, nothing extra is admissible. The quoted rates shall be deemed to consider above factors.
Grass cutting on shoulder of Run way, taxi tracks, over run area and adjacent areas as necessary including cleaning away all grass, vegetation sapling, shrubs, bush weed, undergrowth, roots, trees not exceeding 20 cm girth and removing rubbish etc., complete to a distance of 1.00 to 1.50 KM from the starting point complete all as specified and as directed. Note: - (i) Cutting and trimming of grass above ground level shall be done using mechanical grass cutter machine with operator and manual labour is permitted as per requirement of authorities of AF Station Bidar and as directed by Engineer-in-Charge. (ii) Minimum 4 Nos of heavy duty petrol bush cutter (Grass cutting machine) having minimum daily output of 5000 sq m grass cutting per day is required along with operator. (iii) The quoted rate shall deemed to inclusive of above provisions and nothing extra is payable in this regards.
All as per Serial Item No 1 here-in-above, but grass scrapping and de-rooting the vegetation / Grass, creepers along the lights of runways complete all as specified and as directed.
Demolition of stone masonry / brick work / PCC block masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars etc., complete all as specified and as directed.
Material and labour for providing Pre-cast cement concrete block masonry with Grade 'C' solid block, exceeding 10 cm in width, having minimum compressive strength of 50 Kg / Sq cm as per IS 2185 (Part-I) 2005 and set in CM 1:6 complete all as specified and as directed.
Material and labour for 50 mm dia UPVC pipes of pressure rating 10 Kg f / Sq cm laid in trenches / weep holes complete all as specified and as directed.
Material & Labour for plain cement concrete of 1:2:4 type B0 (using 12.5mm graded stone aggregate) as in copings, bed plates etc. including necessary formwork, complete all as specified and as directed.
Material and Labour for Rendering 15 mm thick in CM (1:4) on fair faces of brick or concrete surfaces finished fair and even in external surfaces complete all as specified and as directed.
Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for roof /chajja padding including removal of debris outside MD land, complete all as specified and as directed.
Material and labour for Plain Cement concrete 1:4:8 type D2 using 40mm graded stone aggregate for foundation filling and mass concreting complete all as specified and as directed.
Material and labour for, Plain cement concrete 1:2:4 type B-0 using 12.5 mm graded stone aggregate as in surface channels and drains including necessary form work complete all as specified and directed
Demolition of reinforced cement concrete as in drain cover slabs, including cutting reinforcement and similar work complete all as specified and as directed..
Material and labour, for providing precast reinforced cement concrete 1:2:4 type B1 using 20mm graded stone aggregate as in cover slab set in CM 1:6 including necessary form work. Note : Reinforcement will be measured and paid for separately.
Material and labour, for mild steel TMT bars 10 mm dia and over, cut to length, bent to shape required, including cranking bending spirally for handle, rungs and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips, as in cover slabs all as specified and as directed by Engineer-in-charge.
Removing existing RCC cover slabs on drains, of any size and re-fixing the same in position and setting in CM 1:4 complete all as specified and as directed. Note : Mode of measurement shall be Centre line of drain.
De-silting of drains not exceeding 1.5 m depth and getting out in loose soil, removing the same to a distance of 1.5 km and not exceeding 5 km, and depositing where directed complete all as specified and as directed.
M/s.Santosh Kotarki (BID ID -3350863)
RAMESH CONSTRUCTION COMPANY (BID ID -3352102)
Siddique constructions (BID ID -3354286)
AMAR CONSTRUCTION (BID ID -3352229)
Mr Madhusudhan Kotarki (BID ID -3351428)
SAYED MUSTAQ AHMED (BID ID -3354462)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .