Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42,325.83Admitted-Fee/PreQual/Technical/Finance KARIPPOL PO MALAPPURAM PIN 676552 | MALAPPURAM | MALAPPURAM | KERALA | 676552 | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹42,330
EMD Value
₹1,058
Closing Date
17 Jul 2026, 6:00 pmClosed
Assistant Engineer
LIDEW Section Cheriyamundam GP
Cheriyamundam GP (Project.No.158/2025-26)-Renovation of the Rain Water Tank at the office compound-General Civil Work (Retender)
2026_LSGD_859991_1
T2/AE/LIDEW/CHDM/26-27
Open Tender
Civil Works - Others
Percentage
180 days
Office of the Assistant Engineer
Please refer Tender documents.
7 documents required · 7 mandatory
₹335
₹1,058
Yes
20 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RAIN WATER STORAGE TANK MAINTENACE | |||||
| 1.001 | OD503872/2025-2026:Engaging man coolie | - | each | 994 | - |
| 1.002 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | - | sqm | 532.5 | - |
| 1.003 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | - | sqm | 674.44 | - |
| 1.004 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 0.6 | sqm | 104.66 | ₹62.69 |
| 1.005 | OD504064/2025-2026:Providing and fixing granite of any colour and shade for name board of required size laid over base of cement mortar 1:4(1 cement :4 coarse sand )including all charges etc complete at all levels ,lettering and fixing . | - | each | 2,806.51 | - |
stage.html
html • 0.02 MB
finance_1454200.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
affi158.pdf
Tender Documents • 0.23 MB
FORM158.pdf
Tender Documents • 0.24 MB
BOQ_1454200.xls
BOQ • 0.31 MB
SBD158.pdf
Tender Documents • 0.44 MB
epay305.pdf
Additional Documents • 0.23 MB
inte305.pdf
Additional Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .