Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.5 LAccepted-AOC | ₹9.5 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹9.6 LRejected-AOC | ₹9.6 L | 2 | Rejected-AOC Rejected |
| 3 | 3₹9.8 LRejected-AOC | ₹9.8 L | 3 | Rejected-AOC Rejected |
| 4 | 4₹10.0 LRejected-AOC KATHARA POST DEVRANIA BAHERI BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹10.0 L | 4 | Rejected-AOC Rejected |
| 5 | 5₹10.0 LRejected-AOC | ₹10.0 L | 5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | m/s mohd.sajid thekedar L6 | M/S R S Enterises L5 | Lalit Kumar Rajani Thekedar L2 | M/S MOHD ISRAR CONSTRUCTION COMPANY L8 | MAHENDRA SINGH CONTRACTOR L3 | SURENDRA KUMAR CONTRACTOR L1 | NDPSY Enterprises L4 | RUDRA CONSTUCTION L7 | JULFIKAR AHMAD L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge | 19.8 | Cum | 522.48 ₹10,345.10 | - | 497 ₹9,840.60 | 539.27 ₹10,677.55 | 450 ₹8,910 | 4,977 ₹98,544.60 | 516.76 ₹10,231.85 | 545 ₹10,791 | 545.49 ₹10,800.70 |
| 1.02 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work inembankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge. | 648.1 | Cum | 100.8 ₹65,328.48 | 152.88 ₹99,081.53 | 145 ₹93,974.50 | 157.79 ₹1.0 L | 140 ₹90,734 | 140 ₹90,734 | 151.21 ₹97,999.20 | 155 ₹1.0 L | 159.61 ₹1.0 L |
| 1.03 | Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc. | 212.75 | Cum | 134.4 ₹28,593.60 | 100.8 ₹21,445.20 | 96 ₹20,424 | 104.04 ₹22,134.51 | 90 ₹19,147.50 | 96 ₹20,424 | 99.7 ₹21,211.18 | 106 ₹22,551.50 | 105.24 ₹22,389.81 |
| 1.04 | Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but including cost of shuttering. | 14.76 | Cum | 5,124 ₹75,630.24 | 5,761.31 ₹85,036.94 | 6,720 ₹99,187.20 | 5,946.49 ₹87,770.19 | 5,690 ₹83,984.40 | 5,486 ₹80,973.36 | 5,698.21 ₹84,105.58 | 6,034 ₹89,061.84 | 6,015.08 ₹88,782.58 |
| 1.05 | Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. | 74.44 | Cum | 5,460 ₹4.1 L | 5,203.3 ₹3.9 L | 4,955 ₹3.7 L | 5,370.54 ₹4.0 L | 5,140 ₹3.8 L | 4,950 ₹3.7 L | 5,145.98 ₹3.8 L | 5,250 ₹3.9 L | 5,432.49 ₹4.0 L |
| 1.06 | Struck deep pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete. | 61.63 | Sqm | 168 ₹10,353.84 | 137.76 ₹8,490.15 | 130 ₹8,011.90 | 142.19 ₹8,763.17 | 136 ₹8,381.68 | 130 ₹8,011.90 | 136.25 ₹8,397.09 | 145 ₹8,936.35 | 143.82 ₹8,863.63 |
| 1.07 | Centering and shuttering or steel shuttering for R.C.C. work including cost of all material, labour and T&P etc. complete. | 81.73 | Sqm | 866.88 ₹70,850.10 | 811.44 ₹66,318.99 | 772 ₹63,095.56 | 837.52 ₹68,450.51 | 800 ₹65,384 | 772 ₹63,095.56 | 802.55 ₹65,592.41 | 850 ₹69,470.50 | 847.18 ₹69,240.02 |
| 1.08 | Reinforcement in slab, laying,cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work. | 1.48 | MT | 76,650 ₹1.1 L | 68,308.8 ₹1.0 L | 65,000 ₹96,200 | 70,504.4 ₹1.0 L | 67,000 ₹99,160 | 6,500 ₹9,620 | 67,560.66 ₹99,989.78 | 71,037 ₹1.1 L | 71,317.6 ₹1.1 L |
| 1.09 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement. | 2.5 | Cum | 6,874.56 ₹17,186.40 | 7,166.21 ₹17,915.53 | 60 ₹150 | 7,396.55 ₹18,491.38 | 7,000 ₹17,500 | 6,724 ₹16,810 | 7,087.72 ₹17,719.30 | 7,510 ₹18,775 | 7,481.86 ₹18,704.65 |
| 1.10 | Laying R.C.C. 1:1:2 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement. | 26.51 | Cum | 7,524.72 ₹2.0 L | 7,848.46 ₹2.1 L | 7,475 ₹2.0 L | 8,100.73 ₹2.1 L | 7,700 ₹2.0 L | 7,300 ₹1.9 L | 7,762.33 ₹2.1 L | 7,980 ₹2.1 L | 8,194 ₹2.2 L |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
30 Oct 2025, 10:00 amClosed
Executive Engineer
Office Sharda Sagar Division Pilibhit
Reconstruction of V.R.B. at km 5.555 of Neoria Drain for year 2025-26
2025_UPIDC_1085029_6
05/E.E/2025-26
Open Tender
Civil Works
60 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹24,000
13 Mar 2026
25 Oct 2025
30 Oct 2025
25 Oct 2025
30 Oct 2025
25 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.36 MB
BOQ_1988235.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid