Loading…
Loading…
Tender Value
₹35.8 L
EMD Value
₹36,000
Closing Date
22 May 2026, 6:00 pmClosed
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
Construction of two H.R. on Ogan-Thuleta drain for controlling water in Vasan bund near vill. Vasan, Ta. Viramgam under S.I. Sub Dn., Sanand.
303220
03 of 2026-27
Open
Miscellaneous Works
Ahmedabad
6 documents required · 5 mandatory · 1 optional
₹1,500
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
₹36,000
8 May 2026
8 May 2026
8 May 2026
22 May 2026
8 May 2026
BILL OF QUANTITY
Name of Construction of two H.R. on Ogan-Thuleta drain for controlling water in Vasan bund
work: near vill. Vasan, Ta. Viramgam under S.I. Sub Dn., Sanand
Item NO. DESCRIPTION QTY. UNIT RATE in AMOUNT
Excavation in all sorts of soil (including wet and slushy
condition of soil) with yellow, sandy, gravelly soil
including soft murrum & H.M. including sorting &
stacking and depositing the excavated stuff in uniform
1 layers as and where directed upto lead of 30 mt. and lift 768.02 Cum. 75.00
as shown below including clearing the site etc.
complete. (Including dewatering)
(B) For foundation trenches of C.D. work (a)
Providing and laying CC 1:2:4 grade using
cement, sand and crushed metal incuding
providing and erecting necessary form work,
centering,vibrating, smooth finishing,watering and
curing as directed with all leads and lifts etc
complete. (a) Sub structures (MSA 20)
Providing and laying RCC 1:1.5:3 grade by using
cement, sand and crushed metal for different items
like copping work, pier cap, abutment cap,
Wearing coat, Skin concrete, Solid slab upto
cm. Thick, Barrel of canal syphons, barrel of RCC
through, & Beams for foundation and super
structure as per approved design including
providing necessary centering, shuttering and form
work, vibrating, smooth finishing, watering and
curing as directed with all leads and lifts etc.comp.
Providing, supplying, laying and fixing in position
under ground R.C.C. hume pipe of NP 2 class
pipes as per I.S.I. Standered specification of
prescribed diameter including filling the joints and
4 with providing necessary collars with cement 30 Rmt. 6045.00
mortar of proportion C.M. 1:1 inclusive of testing
for leakage and working pressure as directed with
all cost of materials and labour for all leads and lifts
etc. complete. 1200 mm Dia
Providing and laying HYSD steel bar reinforcement
for R.C.C works and anchor bars with providing
5 binding wires including cutting, bending, welding, 6.24 MT 72949.00
binding in position, hooking, placing in position with
all leads and lifts etc. complete.
Providing & fixing M.S. Screw gates with Capston
nut & thrust bearing as per detailed designed with
6 steel R.S.J at top incl. Necessary locking 11.52 Smt. 29689.00
arrangements, guide channel at bottom &
fastening & 3 coats Oil painting for main outlet.
Earth work in embankment from borrow pits in all
sorts of soil and soft murrum or other suitable
strata as directed including breaking the clods and
dressing to the design sections including cutting
7 the proud section with lead as under and all lift 408.00 Cum. 73.00
including site clearing etc. complete. For all canal
capacity (Dumper capacity = 14 M.T) (a) 0 to 30 m
(In words Rupees Thirty Five Lakhs Seventy Five Thousands One Hundred Twenty Six rupees and
Thirty Six Paisa only)
I/We am/are willing to carry out the work at…… % above/below percent(Should be written in figures and words) of
the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book Vasan.pdf
sch B Vasan Hr.pdf
Tender notice 03 of 2025-26 for CD and publish.pdf
Download all tender documents and submit your bid