Executive Engineer R and B Division Modasa
Construction of New Rest House at Shamlaji Ta. Bhiloda Dist. Aravalli (Providing Parking, Cattle Trap & Miscellaneous Work)
304979
Nivida No.01 of 2026-27
Open
Civil Works - Others
Works
Arvalli
7 documents required · 4 mandatory · 3 optional
₹900
ExecutiveEngineer, R & B Division, Modasa
₹9,000
18 May 2026
18 May 2026
18 May 2026
2 Jun 2026
18 May 2026
Bill of Quantities
Rates Total Amount
Rates Total Amount
Item of work Quantity Unit to estimated
1 Demolition including stacking of serviceable materilas and 6.00 Cum 1081.84
disposal of unserviceable materials with all lead and lift.
2 Excavation for foundation upto 1.5 m depth including 4.00 Cum 157.08
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(B) Dense or
3 Providing and laying controlled cement concrete M.150 for 21.00 Cum 5339.87
curing complete including cost of formwork but excluding
the cost of reinforcement for reinforced concrete work in
(A) Foundations, footings,Base of columns and Mass
4 Providing and laying controlled cement concrete M.250 and 7.00 Cum 5800.54
curing complete including cost of formwork but excluding
the cost of reinforcement for reinforced concrete work in
(A) Foundations, footings, Base of columns and Mass
5 Providing TMT Bar FE 500D reinforcement for R.C.C. 700.00 Kg. 77.29
work including bending, binding and placing in position
complete for All Floor
6 Steel work, welded in built up sections framed work 31.00 Quintal 9108.49
including cutting, hoisting, fixing in position and applying a
priming coat of red lead paint. (A)In beams and joists,
channels angles Tees, flats, with connecting plates or angle
cleats as in main and cross beams. Hip and jack rafters,
purlins conneted to common rafters and the like
Rates Total Amount
Rates Total Amount
Item of work Quantity Unit to estimated
7 Painting two coats (excluding priming coat) on external 81.00 Sqmt. 22.75
surface of new rain water, soil, waste and vent pipes and
fittings with ready mixed bituminous brushing, black,
anticorrosive to give an even shade including cleaning of
all dirt, dust and other foreign matter. (B) 75mm dia.
8 Providing corrugated G.I. sheet of class-3 roofing fixed with 179.00 Sqmt. 734.19
glavanished iron J or L Hooks, Bolts and nuts 8mm
diameter with bitumen and G.I. limpet washer or G.I. limpet
washer. filled with white lead complete excluding the cost
of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet.
9 Providing and fixing pre-cast Rubber Dye / steel Dye inter 165.00 Sqmt. 706.93
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as
per approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and filling the
joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete.
10 Construction of Cattle trap made from ISMC 100 border 18.00 Sqmt. 5546.92
and G.I. pipe 50 mm dia. Heavy duty at 12cm spacing by
welding and for supports 2 nos. I.S.M.C. 100x75x6 section
fixing in prepared chamber as per drawing.
Total Cost of Construction Cost
(Rupees Eight lakh Forty Six Thousand Seventy Seven and Thirty Seven Paise Only)
I/We am/are willing to carry out the work at ………………………………………………..% above/below (percent
should be written in figures and words) of the estimated rates mentioned above. Amount of my/our tender works out
*Estimated amount *Estimated amount
Put to tender Rs…846077.37 Put to tender Rs.846077.37
Deduct ……. % below Rs……………………..…. Add ……. % Avove Rs…………..….
Net Rs. …………………….… Total Rs. ………….…
The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
Rates Total Amount
Rates Total Amount
Item of work Quantity Unit to estimated
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
4 there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
5 Dismentalling of Credit materials amounting of Rs. -0.00/- must be recovered from Contractor's respective
Deputy Executive Engineer Executive Engineer
R&B Sub Division R&B Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book_2023_PARKING AT NEW REST HOUSE SHAMLAJI_2026_04_07.pdf
BOQ_PARKING AT NEW REST HOUSE SHAMLAJI.pdf
05 General Specification - State.pdf
06 Specification Index_.pdf
07 BUILDING WORK BOOKLET.pdf
08 Details Specification_.pdf
GR - 1.pdf
GR - 2.pdf
GR - 3.pdf
GR - 4.pdf
GR - 5.pdf
WORK DETAIL - PARKING AT NEW REST HOUSE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .