Tender Value
₹6.6 L
EMD Value
₹13,500
Closing Date
28 Sept 2026, 5:00 pmDue tomorrow
Executive Engineer
HPPWD Division Nurpur
C/O slab culvert at RD 0/005) 1.50 Mtr Span
2026_PWD_144081_1
4337-38 dated 21.9.2026
Open Tender
Civil Works
Percentage
Nurpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Yes
₹13,500
Yes
23 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable matreial in ordinary soil upto 3.00 mtr. depth . as per the directions of the Engineer-in-Charge, including carriage of materials within all leads and lifts and other incidental charges. The rates are includes of royalty, octroi, toll tax and all other charges as imposed by the Government but excluding G.S.T. | 95.3 | Per Cubic Meter | 298.5 | ₹28,447.05 |
| 2 | Providing and Laying plain cement concrete 1:4:8 (one cement is to four sand isto eight graded crushed stone aggregate with nominal mix in open foundations complete as per drawing and technical specifications clauses 802, 803, 1202 & 1203 and as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royalty, Malkana, toll tax, sales tax,GST or any other taxes imposed by the Government. but excluding G.S.T. | 2.53 | Per Cubic Meter | 3,460 | ₹8,753.8 |
| 3 | Plain/ reinforced cement concrete in sub structure , Bed block , Dirt wall etc. complete as per drawings and technical specification clasue 802,804,805,806,807,1202, & 1204. For height upto 5 m RCC Grade M 15 (1:2.5:5) nominal mix abutments s per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royalty, Malkana, toll tax, sales tax,GST or any other taxes imposed by the Government but excluding G.S.T. | 63.53 | Per Cubic Meter | 4,477.9 | ₹2,84,480.99 |
| 4 | Providing and laying mechanically mixed and vibrated reinforced cement concrete nominal mix 1:2:4 (one cement isto two sand isto four graded crushed stone aggregate 20 mm (Twenty milli metre) nominal size mix design to obtain the minimum compressive strength of grade M-20 (M -twenty) in substructure as per drawing and MORD technical specification for Roads clause-802,804,805, 806, 807 1202 & 1203 including the cost of form work, but excluding the cost of reinforcement for reinforced concrete work in bed block, upto any floor level and curing complete including hauling of materials in all kinds of leads , lifts and other incidental, as per the entire satisfaction and direction of Engineer-in-charge The rate including of octroi, royality, Malkana, Tol Tax, sale tax or other taxes imposed by the Government but excluding G.S.T. | 3.08 | Per Cubic Meter | 5,451.4 | ₹16,790.31 |
| 5 | Plain and laying reinforced cement conrete in superstructure slab as per drawings and technical specification clause 800,1205,.4 & 1205.5 RCC grade M 20 for nominal mix 1:1.5:3 upto 5 m height in superstructure slab s per the entire satisfaction and direction of Engineer-in-charge The rate including of octroi, royality, Malkana, Tol Tax, sale tax or other taxes imposed by the Government but excluding G.S.T. | 15.31 | Per Cubic Meter | 5,451.4 | ₹83,460.93 |
| 6 | Plain and laying reinforced cement conrete in superstructure slab wearing coarse as per drawings and technical specification clause 800,1205,.4 & 1205.5 RCC grade M 25 ( 1:1.:2) upto 5 m height Wearing coarse slab s per the entire satisfaction and direction of Engineer-in-charge The rate including of octroi, royality, Malkana, Tol Tax, sale tax or other taxes imposed by the Government but excluding G.S.T. | 2.39 | Per Cubic Meter | 6,076.55 | ₹14,522.95 |
| 7 | Supplying fitting and placing HYSD Bar reinforcement in superstructure conmplete as per drawing and technical specification clause 1002,1010, & 1202 s per the entire satisfaction and direction of Engineer-in-charge The rate including of octroi, royality, Malkana, Tol Tax, sale tax or other taxes imposed by the Government but excluding G.S.T. | 2.78 | Tonne | 77,900 | ₹2,16,562 |
| 8 | Providing and laying flooring laid over cement concrete bedding complete as per drawaings and technical specification clause 1303 cement concrete blocks gradew M-15 1:2.5:5 s per the entire satisfaction and direction of Engineer-in-charge The rate including of octroi, royality, Malkana, Tol Tax, sale tax or other taxes imposed by the Government but excluding G.S.T. | 2.48 | Per Cubic Meter | 4,477.9 | ₹11,105.19 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 4.42 MB
SBD1626.pdf
Tender Documents • 2.58 MB
BOQ_214253.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .