Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36,391.52Accepted-AOC | ₹36,391.52 | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | B.VASUDEVAN L2 | SAFVAN RABEEH KK L1 |
|---|---|---|---|---|---|
| 1.00Renovation works | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.98 | cum | 350 ₹693 | 330 ₹653.4 Lowest |
| 1.00 | OD16139/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking
materials
useful for reuse for any thickness of walls in DR masonry including disposal of
debris within a distance of 150m | 7.56 | cum | 700 ₹5,292 | 695.8 ₹5,260.25 Lowest |
| 1.00 | OD16140/2026-2027:(OD From DAR : 60.7.8)
DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 5.29 | cum | 2,000 ₹10,584 | 1,576 ₹8,340.19 Lowest |
| 1.00 | OD16142/2026-2027:(OD From 60.7.1): DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 4.25 | cum | 4,000 ₹16,992 | 3,668 ₹15,581.66 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.2 | sqm | 400 ₹480 | 35 ₹42 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.3 | cum | 8,500 ₹2,550 | 8,483.4 ₹2,545.02 Lowest |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 10.8 | sqm | 400 ₹4,320 | 367.5 ₹3,969 Lowest |
Tender Value
₹36,780
Closing Date
28 May 2026, 4:00 pmClosed
ASSISTANT ENGINEER
AE LSGD KONDOTTY
Annual Plan-Kondotty Municipality-2026-2027- Petty works- Renovation of Karimukku Thodu-Petty works-General Civil Work
2026_LSGD_852030_17
4/AE/LSGD/KDTY/2026-27/A
Open Tender
Civil Works - Others
Item Rate
180 days
KONDOTTY
Please refer Tender documents.
9 documents required · 9 mandatory
₹335
5 Sept 2026
21 May 2026
29 May 2026
21 May 2026
28 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation works | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | OD16139/2026-2027:DISMANTLING DR - Dismanling , clearing away and carefully stacking
materials
useful for reuse for any thickness of walls in DR masonry including disposal of
debris within a distance of 150m | 1 | cum | - | - |
| 1.003 | OD16140/2026-2027:(OD From DAR : 60.7.8)
DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.004 | OD16142/2026-2027:(OD From 60.7.1): DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1439888.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
generalestpdfview.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.82 MB
BOQ_1439888.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .