| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.7 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹98.6 L+₹45.9 L (87.1%)Rejected-Finance 20 SC BOSE COLONY GALL NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L2 | Rejected-Finance NOT BEING L1 | |
| 3 | Rejected-Technical 1630 SECTOR 7C CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | - | Rejected-Technical Not recommended as the firm has not intimated whether they are AMISP or otherwise. Also the firm has not furnished any MoU in this regard |
| Sl No | Description | Qty | Unit | Amit Engineering L1 | M K ENGINEERS CO. L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnecting and taking down carefully existing electric meter and deposit to E&M store yard of AGE (MES) for keeping in safe custody for BER board and making good the disturbed surfaces of walls floors filling up of holes plastering while washing distempering etc matching to the exisgting etc. complete all as directed. | 368 | Each | 400 ₹1,47,200 Lowest | 400 ₹1,47,200 Lowest |
| 2.00Design, supply installation testing, commissioning & integration of Advance Metering Infrastructure (AMI) for Haldwani stations under GE ranikhet comprising of Performing site survey and deciding the communication technology to ensure data availability/ connectivity of all the consumers. The design should be in such a way that it must include atleast three different makes of smart meters not more than 33% meters of each make must be installed at site: It will include the following components: | |||||
| 3.00 | Supply installation testing & commissioning of Smart Prepaid Energy Meters, Complying to BIS-16444, ISI Marked in existing Meter Board/ Floor Panels, current range 10-60 Amp, 240 V for single phase and current range 10-60 Amp, 415 volt for 3 phase, accuracy class 1.0 UC1 category and above along with in built load control switch, containing provision for TOD & RTC, capable to define mulgtiple gtanff slabs incl meter boxes for Haldwani Stations under GE Ranikhet complete all as specified and directed.
(a) Single phase ,2 wire, AC Static Direct connected : 334
(b) Three phase ,4 wire, AC Static Direct connected : 34
Meter should support the following data:-
(i) 15/30 min instantaneous data for voltage, current power factor, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand.
(ii) Meter should have connect/ disconnect functionality operable for mdm/ billing software and prepaid features would be operable for MDM/ Billing end as per IS 15959 part 2.
(iii) Meter should support communication protocol through RF/4G/NB IOT with the software all as required at site and directed. In case of RF communication, the cost of DCU and repeaters are deemed to be included in the rates quoted for meters.
(iv) The meter should support open communication protocol DLMS with the software. | 1 | Each Job | 20,13,900 ₹20,13,900 Lowest | 50,65,000 ₹50,65,000 |
| 4.00Note (i) The defect liability period will be 2 years from the date of completion of Phase-I. (ii) Any variaiton in quantity of Smart Prepaid Meter (AMI) will be paid and deducted as per the supplementary rate for single and 3 phase smart meter beyond the qunatity mentioned here-in-before as per rates given below:- (a) Single Phase meter - Rs 6838/- per meter. (b) Three phase meter Rs 8135/- per meter. (iii) The rent and water supply bill and any other charges or levy will be included in software as directed by GE. | |||||
| 5.00 | Supply and configuration of the web based software for three phase 440 volt and single phase 220 volt smart prepaid meter with fwg modules:-
(i) Meter Data Management Module
The meter data management module would be responsible for collecting the data from concentrator and make the data available to the billing system. the meter data management system would capture and provide the fwg data:-
(ii) Real Time Energy monitoring with 30 min instantaneous data from all the meters for seven parameters- Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency.
(iii) Monthly billing survey data for Cummulative energy and max demand.
(iv) Postpaid/ Prepaid Billing module
The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data/ billing data available to admin and end users. The biling module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required. | 368 | Each | 580 ₹2,13,440 Lowest | 800 ₹2,94,400 |
| 6.00(v) Occupation and Vacation Module:- The system would support occupation/ vacation and billing reports. The software would be collecting data from meter. The software would provide access to authorised MES rep as well as the occupant of the data. (vi) Web Site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access fo the key information on an android mobiles app (for admin use). (vii) Custumer Portal: The system would include a custumer portal for the resident/ occupant to log in and view their own energy/ billing data. There would be android and iOS moble apps for the user to monitor its own data and balance on regular basis. | |||||
| 7.00(viii) Energy Accountig Module The system would include features of energy accounting. The sysem would be able to account for total energy block wise facility wise and would also allow calculations of unaccounted energy in case totla energy meter is also available. (xi) Communication Module: The system would provide communication of energy data and bills via print, email and sms methods. (x) Meter Master Data: The system would support meter master data repository. The system would support meter replacement process. (xi) Excel Export: The system would support export of metering and billing data in excel format. | |||||
| 8.00(xii) Customer Care Module: The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaint resolution. (xiii) Meter installation module: The software would include an app based meter installation module where the installation or change can be captured on the app itself and the readings may be demonstrated to the user if on the app itself. (xiv) Activities Communication: The software should support communication of the various activities such as occupation, vacation meter change, personal detail change etc with the user as well as the departmental on email the software should be demonstrated to work in both RF and GPRS-based systems for future compatibility (xv) Cyber security of software: The software provided for the smart prepaid meters shall be secure from cyber threats and shall be provided regular security patches ang updates including firewall and latest feature updates | |||||
| 9.00 | Supply, installation one broadband connections at Haldwani station with high speed internet connection for two years complete all as directed. | 24 | Per Month | 3,000 ₹72,000 Lowest | 20,000 ₹4,80,000 |
| 10.00 | M&L for integration meter with existing server (GCC) complete all as specified and directed by Engr in charge | 368 | Each Meter | 55 ₹20,240 Lowest | 200 ₹73,600 |
Tender Value
₹58.4 L
EMD Value
₹1.1 L
Closing Date
11 Apr 2026, 6:00 pmClosed
CHIEF ENGINEER BAREILLY ZONE
HEADQUARTERS CHIEF ENGINEER BAREILLY ZONE BAREILLY
PROVISION OF SMART PREPAID ELECTRIC METERS AT MIL STATION HALDWANI
2026_MES_750796_1
CEBZ/PGH/T-20 OF 2025-26
Open Tender
Civil Works
Item Rate
HALDWANI
AS PER NIT
8 documents required · 8 mandatory
₹1,000
GE MES RANIKHET
₹1.1 L
30 Jul 2026
31 Jan 2026
18 Apr 2026
31 Jan 2026
11 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting and taking down carefully existing electric meter and deposit to E&M store yard of AGE (MES) for keeping in safe custody for BER board and making good the disturbed surfaces of walls floors filling up of holes plastering while washing distempering etc matching to the exisgting etc. complete all as directed. | 368 | Each | - | - |
| 2 | Design, supply installation testing, commissioning & integration of Advance Metering Infrastructure (AMI) for Haldwani stations under GE ranikhet comprising of Performing site survey and deciding the communication technology to ensure data availability/ connectivity of all the consumers. The design should be in such a way that it must include atleast three different makes of smart meters not more than 33% meters of each make must be installed at site:
It will include the following components: | - | - | - | - |
| 3 | Supply installation testing & commissioning of Smart Prepaid Energy Meters, Complying to BIS-16444, ISI Marked in existing Meter Board/ Floor Panels, current range 10-60 Amp, 240 V, accuracy class 1.0 UC1 category and above along with in built load control switch, containing provision for TOD & RTC, capable to define mulgtiple gtanff slabs incl meter boxes for Haldwani Stations under GE Ranikhet complete all as specified and directed.
(a) Single phase ,2 wire, AC Static Direct connected : 334
(b) Three phase ,4 wire, AC Static Direct connected : 34
Meter should support the following data:-
(i) 15/30 min instantaneous data for voltage, current power factor, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand.
(ii) Meter should have connect/ disconnect functionality operable for mdm/ billing software and prepaid features would be operable for MDM/ Billing end as per IS 15959 part 2.
(iii) Meter should support communication protocol through RF/4G/NB IOT with the software all as required at site and directed. In case of RF communication, the cost of DCU and repeaters are deemed to be included in the rates quoted for meters.
(iv) The meter should support open communication protocol DLMS with the software. | - | Each Job | - | - |
| 5 | Supply and configuration of the web based software for three phase 440 volt and single phase 220 volt smart prepaid meter with fwg modules:-
(i) Meter Data Management Module
The meter data management module would be responsible for collecting the data from concentrator and make the data available to the billing system. the meter data management system would capture and provide the fwg data:-
(ii) Real Time Energy monitoring with 30 min instantaneous data from all the meters for seven parameters- Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency.
(iii) Monthly billing survey data for Cummulative energy and max demand.
(iv) Postpaid/ Prepaid Billing module
The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data/ billing data available to admin and end users. The biling module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required. | 368 | Each | - | - |
| 6 | (v) Occupation and Vacation Module:-
The system would support occupation/ vacation and billing reports.
The software would be collecting data from meter. The software would provide access to authorised MES rep as well as the occupant of the data.
(vi) Web Site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access fo the key information on an android mobiles app (for admin use).
(vii) Custumer Portal:
The system would include a custumer portal for the resident/ occupant to log in and view their own energy/ billing data. There would be android and iOS moble apps for the user to monitor its own data and balance on regular basis. | - | - | - | - |
| 7 | (viii) Energy Accountig Module
The system would include features of energy accounting. The sysem would be able to account for total energy block wise facility wise and would also allow calculations of unaccounted energy in case totla energy meter is also available.
(xi) Communication Module:
The system would provide communication of energy data and bills via print, email and sms methods.
(x) Meter Master Data:
The system would support meter master data repository. The system would support meter replacement process.
(xi) Excel Export:
The system would support export of metering and billing data in excel format. | - | - | - | - |
| 8 | (xii) Customer Care Module: The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaint resolution.
(xiii) Meter installation module: The software would include an app based meter installation module where the installation or change can be captured on the app itself and the readings may be demonstrated to the user if on the app itself.
(xiv) Activities Communication: The software should support communication of the various activities such as occupation, vacation meter change, personal detail change etc with the user as well as the departmental on email the software should be demonstrated to work in both RF and GPRS-based systems for future compatibility
(xv) Cyber security of software: The software provided for the smart prepaid meters shall be secure from cyber threats and shall be provided regular security patches ang updates including firewall and latest feature updates | - | - | - | - |
| 9 | Supply, installation one broadband connections at Haldwani station with high speed internet connection for two years complete all as directed. | 24 | Per Month | - | - |
| 10 | M&L for integration meter with existing server (GCC) complete all as specified and directed by Engr in charge | 368 | Each Meter | - | - |
| 11 | Provision of wireless Report Printer with 12 pages per minute capacity, 600 x 600 dpi with HP, REt, 1200 dpi effective output quality (600 x 600 x 2 dpi with REt, with duty cycle 3,000 single-sided pages per month for report printing complete as required, | 1 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
tend_doc.pdf
Tender Documents • 1.33 MB
BOQ_840891.xls
BOQ • 0.41 MB
8852224.pdf
PDF • 0.35 MB
885224.pdf
PDF • 0.34 MB
885224.pdf
PDF • 0.34 MB
5224.pdf
PDF • 0.01 MB
885224pdf.pdf
PDF • 0.01 MB
pdfff.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .