| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.0 L+₹47,303.23 (4.96%)Rejected-AOC KERALA KL KERALA | L2 | Rejected-AOC L2 | |
| 3 | L3₹10.3 L+₹78,854.31 (8.26%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹10.6 L+₹1.0 L (10.6%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹11.3 L+₹1.7 L (18.1%)Rejected-AOC MIHAD HOUSE PURAKKAD POST PAYYOLI KOZHIKODE | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | VK BALAN L2 | P.T.USMAN L5 | Ramakrishnan L1 | SHAMIR T L4 | MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Rectification of canal | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 560 | sqm | 14.84 ₹8,310.4 | 16.7 ₹9,352 | 8.19 ₹4,586.4 Lowest | 15.64 ₹8,758.4 | 15.3 ₹8,568 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 2.5 | cum | 2,055.22 ₹5,138.05 | 2,311.84 ₹5,779.6 | 1,987.45 ₹4,968.63 Lowest | 2,165.5 ₹5,413.75 | 2,119.95 ₹5,299.88 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 4.8 | cum | 1,269.28 ₹6,092.54 | 1,427.77 ₹6,853.3 | 1,227.43 ₹5,891.66 Lowest | 1,337.39 ₹6,419.47 | 1,309.26 ₹6,284.45 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 10 | hour | 373.1 ₹3,731 | 419.69 ₹4,196.9 | 364.26 ₹3,642.6 Lowest | 393 ₹3,930 | 384.85 ₹3,848.5 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 64.16 | cum | 293.73 ₹18,844.25 | 330.41 ₹21,197.45 | 189.82 ₹12,177.9 Lowest | 309.49 ₹19,855.33 | 302.98 ₹19,437.68 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 30.74 | cum | 6,477.7 ₹1,99,111.54 | 7,286.51 ₹2,23,972.74 | 6,264.07 ₹1,92,544.98 Lowest | 6,825.27 ₹2,09,795.15 | 6,681.72 ₹2,05,382.71 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 65.99 | cum | 6,997.23 ₹4,61,733.21 | 7,870.91 ₹5,19,385.61 | 6,766.47 ₹4,46,505.82 Lowest | 7,372.68 ₹4,86,508.41 | 7,217.62 ₹4,76,276.31 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.52 | cum | 7,541.75 ₹56,713.96 | 8,483.41 ₹63,795.24 | 7,293.01 ₹54,843.44 Lowest | 7,946.4 ₹59,756.93 | 7,779.27 ₹58,500.11 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 265.07 | sqm | 685.58 ₹1,81,725.32 | 771.19 ₹2,04,417.79 | 662.99 ₹1,75,737.43 Lowest | 722.37 ₹1,91,477.17 | 707.2 ₹1,87,456.09 |
Tender Value
₹11.3 L
EMD Value
₹28,163
Closing Date
18 Aug 2025, 6:55 pmClosed
Assistant Executive Engineer
O/O Assistant Executive Engineer KyIP Canal Subdivision Vadakara
GENERAL KyIP ACP Plan 2025 26 Rectification of leaked portion of Right Bank Main Canal Near Ch 29 500km General Civil Work General Civil Work
2025_Irrig_784339_1
IRR/PI/TR/2546/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Thanneerpanthal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹28,163
Yes
3 Dec 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
Amount
Rectification of canal
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
VK BALAN (BID ID -2292480)
MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY (BID ID -2294265)
SHAMIR T (BID ID -2292010)
P.T.USMAN (BID ID -2292539)
Bidder Name
VK BALAN
Ramakrishnan
P.T.USMAN
SHAMIR T
MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1288399.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .