Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.2 L
EMD Value
₹9,928
Closing Date
15 Oct 2026, 1:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
NEERAJ KAALIA
CE DCRTPP Yamuna Nagar
Reconstruction of HCL tank foundation at D.M. plant, DCRTPP, HPGCL, Yamuna Nagar
2026_HBC_546799_1
2026B5502F67 29FC 4784 A414 C3EAA16433A3711PGC
Open Tender
Civil Works
Works
60 days
DCRTPP
As per PQR of NIT
3 documents required · 3 mandatory
₹1,180
₹9,928
Yes
15 Oct 2026
11 Sept 2026
16 Oct 2026
11 Sept 2026
15 Oct 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.
Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,160.42 | Kg | 66 | ₹1,42,587.72 |
| 2 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.
Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,141.69 | Kg | 68 | ₹77,634.58 |
| 3 | HSR Item 11.73.2-Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. 2. On concrete work | 52.4 | Sqm | 79 | ₹4,139.6 |
| 4 | HSR Item 6.25.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | 15.12 | Cum | 4,464 | ₹67,495.68 |
| 5 | HSR Item 6 25.2-Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level | 6.09 | Cum | 4,502 | ₹27,426.18 |
| 6 | HSR Item 5 43.1-Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. 1. For thickness of tiles 10 mm to 25 mm | 79 | Sqm | 22 | ₹1,738 |
| 7 | HSR Item 5.25-Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 22.12 | Cum | 1,562 | ₹34,551.44 |
| 8 | HSR Item 11.4.2-10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand) | 60.6 | Sqm | 114 | ₹6,908.4 |
| 9 | HSR Item 6.29.1-Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | 14.94 | Sqm | 155 | ₹2,315.7 |
| 10 | HSR Item 6.29.3-Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts | 16.56 | Sqm | 261 | ₹4,322.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_626438.xls
BOQ • 0.28 MB
546799Corigendum2.pdf
PDF • 0.08 MB
546799Corigendum1.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .