Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹19.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.1 L+₹8,130.52 (0.43%)Admitted-Fee/PreQual/Technical/Finance V S BHAVAN AYIRA P O | KERALA | ₹19.1 L+₹8,130.52 (0.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.3 L+₹27,202.51 (1.43%)Admitted-Fee/PreQual/Technical/Finance VADOORKONAM | IDUKKI | KERALA | 685533 | ₹19.3 L+₹27,202.51 (1.43%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JUSTIN JOSE L3 | JOHN VICTOR G L1 | VINCENT V L2 |
|---|---|---|---|---|---|---|
| 1.00Renovation of pond | ||||||
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 160 | hour | 423.78 ₹67,804.8 | 419 ₹67,040 Lowest | 419.59 ₹67,134.4 |
| 1.00 | OD51353/2025-2026: Excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the pond by mechanical means or manual means with all lead and lift including disposal of the removed earth, silt, clay, mud etc to places as directed by the Engineer in charge, complete as per the directions of the Engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of
water in the pond. | 2,241.75 | cum | 239.65 ₹5,37,235.39 | 235 ₹5,26,811.25 Lowest | 237.28 ₹5,31,922.44 |
| 1.00 | OD51425/2025-2026: conveyance /carriage charges for rubbish/silt/plastic collected from the site to contractors own dumping area within 5 km without causing damages to environment or society. | 1,905.49 | cum | 214.7 ₹4,09,108.27 | 212 ₹4,03,963.46 Lowest | 212.57 ₹4,05,049.58 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.62 | cum | 1,981.22 ₹5,200.7 | 1,959 ₹5,142.38 Lowest | 1,961.63 ₹5,149.28 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 7.14 | cum | 2,364.63 ₹16,883.46 | 2,338 ₹16,693.32 Lowest | 2,341.24 ₹16,716.45 |
| 1.01 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 5 | cum | 5,743.51 ₹28,706.06 | 5,680 ₹28,388.64 Lowest | 5,686.71 ₹28,422.18 |
| 1.01 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 52 | sqm | 70.57 ₹3,669.64 | 69 ₹3,588 Lowest | 69.87 ₹3,633.24 |
| 1.01 | 11.20.4:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment | 34.4 | sqm | 1,083.12 ₹37,259.33 | 1,071 ₹36,842.4 Lowest | 1,072.41 ₹36,890.9 |
| 1.01 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.59 | cum | 9,653.64 ₹25,022.23 | 9,547 ₹24,745.82 Lowest | 9,558.17 ₹24,774.78 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
17 Aug 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer, Minor Irrigation Division, Jalavijnana Bhavan, Kowdiyar P O Thiruvananthapuram-695003
Improvements and Maintenance of Paingachira pond
2026_Irrig_864242_1
01/EE-MI/2026-27
Open Tender
Civil Works - Water Works
Item Rate
270 days
Anamugham ward
7 documents required · 7 mandatory
₹2,760
₹50,000
19 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation of pond | |||||
| 1.001 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.002 | OD51353/2025-2026: Excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the pond by mechanical means or manual means with all lead and lift including disposal of the removed earth, silt, clay, mud etc to places as directed by the Engineer in charge, complete as per the directions of the Engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of
water in the pond. | - | cum | - | - |
| 1.003 | OD51425/2025-2026: conveyance /carriage charges for rubbish/silt/plastic collected from the site to contractors own dumping area within 5 km without causing damages to environment or society. | 0.2 | cum | - | - |
| 1.004 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.005 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1 | cum | - | - |
| 1.006 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | - | cum | - | - |
| 1.007 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 1.008 | 11.20.4:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment | 1 | sqm | - | - |
| 1.009 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
stage.html
html • 0.02 MB
finance_1462237.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1462237.xls
BOQ • 0.32 MB
SBD.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .