| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹33.6 L+₹64,036.27 (1.94%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹35.2 L+₹2.3 L (6.94%)Accepted-Finance POYYA KRISHNANKOTTA ROAD COMPANYPADY JUNCTION POYYA POST THRISSUR KERALA 680733 | POYYA | THRISSUR | KERALA | 680733 | L3 | Accepted-Finance Accepted | |
| 4 | L4₹37.1 L+₹4.2 L (12.7%)Accepted-Finance | L4 | Accepted-Finance Accepted | |
| 5 | L5₹37.3 L+₹4.4 L (13.2%)Accepted-Finance | L5 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | M M SULAIMAN L1 | HASHIM A L5 | HARIDAS PANTHAPLACKAL MADHAVANPILLAI L6 | Jomon joseph L4 | Rakesh Associates L2 | TENSON C K L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Quoted Amount of BOQ1 in figures | 1 | Nos | 32,96,225.75 ₹32,96,225.75 Lowest | 37,31,343.97 ₹37,31,343.97 | 40,35,105.75 ₹40,35,105.75 | 37,14,924.42 ₹37,14,924.42 | 33,60,262.02 ₹33,60,262.02 | 35,24,868.06 ₹35,24,868.06 |
| 2.00 | If GST registered contractor quote GST @18% other quoted rates not acceptable. | 1 | Nos | 18 ₹5,93,320.64 Lowest | 18 ₹6,71,641.91 | 18 ₹7,26,319.04 | 18 ₹6,68,686.4 | 18 ₹6,04,847.16 | 18 ₹6,34,476.25 |
Tender Value
₹41.0 L
EMD Value
₹50,000
Closing Date
29 Sept 2026, 3:00 pmClosed
AEE,Transmission Subdivision ,Changanacherry
O/o AEE,Transmission subdivision, Changanacherry
Formation of Road to new 110 kV Yard and Quarters at 66 kV Substation ,Changanacherry in connection with the upgradation work
2026_KSEB_866679_1
e- tender 02/TSD_CHRY/2026-27 Dated 24.08.26
Open Tender
Civil Works - Roads
Percentage
66 kV Substation Changanacherry
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹50,000
9 Oct 2026
24 Aug 2026
1 Oct 2026
29 Aug 2026
29 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone
rubble masonry manually / by
mechanical means including
stacking of serviceable
material and disposal of
unserviceable material within
50 metres lead as per
direction of Engineer -in-
Charges:In cement mortar | - | cub.m | 0.8 | - |
| 2 | Demolishing cement
concrete manually / by
mechanical means including
disposal of material within 50
metres lead as per direction of
Engineer - in-
Charge.Nominal concrete
1:3:6 or richer mix (i/c
equivalent design mix) | 1 | cub.m | 0.4 | ₹0.4 |
| 3 | Demolishing R.C.C.
work manually / by
mechanical means including
stacking of steel bars and
disposal of unserviceable
material with in 50 metres
lead as per direction of
Engineer -in-Charge | - | cub.m | 1 | - |
| 4 | Demolishing brick
work manually / by
mechanical means including
stacking of serviceable
material and disposal of
unserviceable material within
50 metres lead as per
direction of Engineer-in-
Charge.In cement mortar | - | cub.m | - | - |
| 5 | Dismantling barbed
wire or flexible wire rope in
fencing including making
rolls and stacking within 50
metres lead. | - | kg | - | - |
| 6 | Dismantling steel
work in built up sections in
angles, tees, flats and
channels including all gusset
plates,boltd, nuts, cutting
rivets, welding etc. including
dismembering and stacking
within 50 metres lead. | - | kg | 1 | - |
| 7 | Surface dressing of
the ground including
removing vegetation and inequalities
not exceeding 15
cm deep and disposal of
rubbish, lead up to 50 m and
lift up to 1.5 m.All kinds of
soil | - | sq.m | - | - |
| 8 | Earth work in
excavation by mechanical means (Hydraulic excavator)
/manual means in foundation
trenches or drains (not
exceeding 1.5 m in width or
10 sqm on plan), including
dressing of sides and
ramming of bottoms, lift up to
1.5 m, including getting out
the excavated soil and
disposal of surplus excavated
soil as directed, within a lead
of 50 m.All kinds of soil | - | cub.m | 0.2 | - |
| 9 | Providing and laying
in position cement concrete of
specified grade excluding the
cost of centering and
shuttering - All work up to
plinth level:1:4:8 (1 cement :
4 coarse sand : 8 graded stone
aggregate 40 nominal size) | - | cub.m | 0.4 | - |
| 10 | Providing and laying
in position specified grade of
reinforced cement concrete,
excluding the cost of
centering, shuttering,
finishing and reinforcement -
All work up to plinth
level:1:1:5:3 (1 cement 1.5
coarse sand :3 graded stone
aggregate 20 mm nominal
size | - | cub.m | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1466919.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_1466919.xls
BOQ • 0.56 MB
TenderDocumentChryRoadFormation.pdf
Tender Documents • 1.22 MB
CorrigendumRoadFormationTenderExperienceModified.pdf
PDF • 0.27 MB
CorrigendumDLPCorrected.pdf
PDF • 0.27 MB
CorrigendumTenderEXPERENCE.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .