Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91,462.97Accepted-AOC | ₹91,462.97 Quoted ₹91,462 | L1 | Accepted-AOC LOWEST |
| 2 | L2₹1.1 LRejected-AOC | ₹1.1 L | L2 | Rejected-AOC SECOND |
| 3 | L3₹1.1 LRejected-AOC | ₹1.1 L | L3 | Rejected-AOC THIRD |
| Sl No | Description | Qty | Unit | GOPALAN.M L2 | G.RAMACHANDRAN L3 | KAMARUDHEEN M L1 |
|---|---|---|---|---|---|---|
| 1.00Maintenance of Mangalam Dam Garden | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6 | cum | 359.72 ₹2,158.32 | 377.71 ₹2,266.26 | 312.25 ₹1,873.50 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.59 | cum | 7,932.89 ₹4,664.54 | 8,329.53 ₹4,897.76 | 6,885.75 ₹4,048.82 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.73 | cum | 9,235.97 ₹6,733.02 | 9,697.77 ₹7,069.67 | 8,016.81 ₹5,844.25 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 6.48 | sqm | 386.16 ₹2,502.32 | 405.47 ₹2,627.45 | 335.19 ₹2,172.03 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.83 | cum | 10,488.77 ₹8,726.66 | 11,013.21 ₹9,162.99 | 9,104.25 ₹7,574.74 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.67 | cum | 12,772.18 ₹8,582.90 | 13,410.79 ₹9,012.05 | 11,086.24 ₹7,449.95 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 77.4 | kilogram | 112.43 ₹8,701.97 | 118.05 ₹9,136.95 | 97.59 ₹7,553.37 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.6 | sqm | 386.16 ₹617.86 | 405.47 ₹648.75 | 335.19 ₹536.30 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 6.72 | sqm | 1,008.55 ₹6,777.46 | 1,058.98 ₹7,116.35 | 875.42 ₹5,882.82 |
Tender Value
Refer Docs
EMD Value
₹2,634
Closing Date
25 Aug 2025, 5:00 pmClosed
ASSASSISTANTEXECUTIVEENGINEER
ASSASSISTANTEXECUTIVEENGINEERCANALSCANALSUBDIVISIONOFFICEALATHUR
M a n g a l a m D a m G a r d e n Maintenance 2025 26Mangalam Dam Garden Maintenance 2025 26
2025_Irrig_788316_1
30 IRR/PI/TR/2883/2025_5_1_1/1
Open Tender
Civil Works - Others
270 days
ALATHUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,634
Yes
23 Jan 2026
19 Aug 2025
27 Aug 2025
19 Aug 2025
25 Aug 2025
19 Aug 2025
19 Aug 2025 - 21 Aug 2025
Amount
Maintenance of Mangalam Dam Garden
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
GOPALAN.M (BID ID -2307365)
G.RAMACHANDRAN (BID ID -2307517)
Bidder Name
G.RAMACHANDRAN
GOPALAN.M
KAMARUDHEEN M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1297486.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid