| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAdmitted-Finance H 10 KARNI NAGAR NEW NAGAUR ROAD NEAR MANDORE POLICE STATION 8TH MILL MANDORE JODHPUR 342304 | JODHPUR | JODHPUR | RAJASTHAN | 342304 | ₹46.5 L | L1 | Admitted-Finance |
| 2 | L2₹47.6 L+₹1.1 L (2.37%)Admitted-Finance | ₹47.6 L+₹1.1 L (2.37%) | L2 | Admitted-Finance |
| 3 | L3₹47.6 L+₹1.2 L (2.48%)Admitted-Finance | ₹47.6 L+₹1.2 L (2.48%) | L3 | Admitted-Finance |
| 4 | L4₹50.9 L+₹4.4 L (9.45%)Admitted-Finance | ₹50.9 L+₹4.4 L (9.45%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shri Ram Traders Co L2 | Shri Electrical Enterprises L1 | Surendra Singh L4 | NISHA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Lifting/ lowering of non clog sewage submersible pump set of the capacity 225 cum/hr, head 20 meter speed 1450 RPM Model No KRTK 150-315/234 UG1-S make KSB from the Raw Sewage sump of depth 40 feet_Lifting : Disconnection of outgoing delivery mains and eletrical connection from the panel and dewatering the STP main receiving sump with in the time period for easy working and should be provide suitable pumps for lifting of raw sewage water from 40 ft depth, pumps out let should be connected with existing header, after dewatering, lifting of unserviceable non clog sewage submersible pump set of any depth alongwith column pipe/ without column pipe, SWR rope including existing submersible cable and check the unserviceability,remove the sludge/ poly bags/ cement bags/any solid items from inside the pump bowel/impellor and make good working condition with all safetyes etc complete all as directed. Lowering :- Lowering the non clog sewage submersible pump after making operational condition alongwith column pipe/ without column pipe, SWR rope including existing submersible cable and all respective items here-in- above lifting and installation of pump motor in its original position, connections the as well as delivery main including electrical connectiion of both end i.e. with starter and motor terminals. Note :- Maint/break down work should be rectify at the earliest otherthan delay may be penalised Rs:1500/- per/Hour. | 15 | Each Job | 5,500 ₹82,500 Lowest | 8,790 ₹1,31,850 | 11,300 ₹1,69,500 | 9,000 ₹1,35,000 |
| 2.00 | Cutting and taking out existing burnt out/unserviceable copper winding from the stator unit of non clog sewage submersible pump set Cleaning of slots and complete stator unit with using carbon tetra chloride (CTC Solution)/standers cleaner Material and labour for rewinding the motor with 'F' class super enamelled copper wire of existing size/gauge including providing bi-metallic thermal overload protection and all necessary insulating materials such as varnish, insulating paper, sleev, seal etc for 28 HP motor. | 3 | Each | 21,005 ₹63,015 | 15,000 ₹45,000 Lowest | 27,500 ₹82,500 | 19,500 ₹58,500 |
| 2.01 | Supply and fixing of bearing to above make motor & pump | 3 | Each | 850 ₹2,550 | 750 ₹2,250 | 1,070 ₹3,210 | 600 ₹1,800 Lowest |
| 2.02 | Supply and fixing of oil seal | 3 | Each | 5,100 ₹15,300 | 2,790 ₹8,370 | 1,900 ₹5,700 Lowest | 3,100 ₹9,300 |
| 2.03 | Supply and fixing of Impeller stainless steel | 1 | Each | 3,100 ₹3,100 Lowest | 5,500 ₹5,500 | 4,500 ₹4,500 | 6,500 ₹6,500 |
| 2.04 | Supply and fixing of Bearing sleeve | 3 | Each | 900 ₹2,700 | 700 ₹2,100 | 500 ₹1,500 Lowest | 550 ₹1,650 |
| 2.05 | Supply and fixing of Hexagon head bolt | 15 | Each | 150 ₹2,250 | 115 ₹1,725 | 150 ₹2,250 | 100 ₹1,500 Lowest |
| 2.06 | Supply and fixing of Cable duct with oil seal complete set | 2 | Each | 500 ₹1,000 Lowest | 750 ₹1,500 | 500 ₹1,000 Lowest | 500 ₹1,000 Lowest |
| 2.07 | Supply and fixing of Screw and Head bolt | 10 | Each | 141 ₹1,410 | 115 ₹1,150 | 150 ₹1,500 | 100 ₹1,000 Lowest |
| 2.08 | Material and labour for colling oil for Motor (ISO VG 68) | 6 | Ltrs | 300 ₹1,800 | 300 ₹1,800 | 275 ₹1,650 Lowest | 325 ₹1,950 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
20 Aug 2026, 6:00 pmClosed
GE (ARMY) NO 2 JODHPUR
Military Engineer Services, Garrison Engineer (Army) No 2 Jodhpur, Multan Lines, Army Area Jodhpur -342010
REPAIR / MAINTENANCE OF SEWAGE PUMPS AND PANELS AND CLEANING OF SEWAGE UG SUMPS AND INSTALLATIONS AND ALLIED WORKS IN ARMY AREA JODHPUR AS PER CPP SER NO 32
2026_MES_780329_1
8800/26-27/43/06/E8
Open Tender
Civil Works - Water Works
Item Rate
330 days
GE (ARMY) NO 2 JODHPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (ARMY) NO 2 JODHPUR
₹98,000
Yes
25 Aug 2026
23 Jul 2026
22 Aug 2026
23 Jul 2026
20 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lifting/ lowering of non clog sewage submersible pump set of the capacity 225 cum/hr, head 20 meter speed 1450 RPM Model No KRTK 150-315/234 UG1-S make KSB from the Raw Sewage sump of depth 40 feet_Lifting : Disconnection of outgoing delivery mains and eletrical connection from the panel and dewatering the STP main receiving sump with in the time period for easy working and should be provide suitable pumps for lifting of raw sewage water from 40 ft depth, pumps out let should be connected with existing header, after dewatering, lifting of unserviceable non clog sewage submersible pump set of any depth alongwith column pipe/ without column pipe, SWR rope including existing submersible cable and check the unserviceability,remove the sludge/ poly bags/ cement bags/any solid items from inside the pump bowel/impellor and make good working condition with all safetyes etc complete all as directed. Lowering :- Lowering the non clog sewage submersible pump after making operational condition alongwith column pipe/ without column pipe, SWR rope including existing submersible cable and all respective items here-in- above lifting and installation of pump motor in its original position, connections the as well as delivery main including electrical connectiion of both end i.e. with starter and motor terminals. Note :- Maint/break down work should be rectify at the earliest otherthan delay may be penalised Rs:1500/- per/Hour. | 15 | Each Job | 1 | ₹15 |
| 2 | Cutting and taking out existing burnt out/unserviceable copper winding from the stator unit of non clog sewage submersible pump set Cleaning of slots and complete stator unit with using carbon tetra chloride (CTC Solution)/standers cleaner Material and labour for rewinding the motor with 'F' class super enamelled copper wire of existing size/gauge including providing bi-metallic thermal overload protection and all necessary insulating materials such as varnish, insulating paper, sleev, seal etc for 28 HP motor. | 3 | Each | 1 | ₹3 |
| 2.01 | Supply and fixing of bearing to above make motor & pump | 3 | Each | 1 | ₹3 |
| 2.02 | Supply and fixing of oil seal | 3 | Each | 1 | ₹3 |
| 2.03 | Supply and fixing of Impeller stainless steel | 1 | Each | 1 | ₹1 |
| 2.04 | Supply and fixing of Bearing sleeve | 3 | Each | 1 | ₹3 |
| 2.05 | Supply and fixing of Hexagon head bolt | 15 | Each | 1 | ₹15 |
| 2.06 | Supply and fixing of Cable duct with oil seal complete set | 2 | Each | 1 | ₹2 |
| 2.07 | Supply and fixing of Screw and Head bolt | 10 | Each | 1 | ₹10 |
| 2.08 | Material and labour for colling oil for Motor (ISO VG 68) | 6 | Ltrs | 1 | ₹6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
TENDER.pdf
Tender Documents • 1.19 MB
BOQ_874078.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .