Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | ₹9.9 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L3₹10.1 L+₹20,795.71 (2.09%)Accepted-Finance | ₹10.1 L+₹20,795.71 (2.09%) | L3 | Accepted-Finance Higher bid value |
| 3 | L2₹10.1 L+₹16,417.66 (1.65%)Rejected-Finance 461 7 WATER WORKS RO AD MONIRAMPORE BKP | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | ₹10.1 L+₹16,417.66 (1.65%) | L2 | Rejected-Finance higher bid value |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
19 Mar 2026, 2:00 pmClosed
OFFICE OF THE DY.CE(WS/IGWTP)
IGWTP, MONIRAMPORE, BARRACKPORE
STRENGTHENING AND RELOCATION OF THE AIR RELEASE VALVE AND ITS PIPELINE CONNECTED WITH PALTA TALLAH TRANSMISSION MAIN BESIDE KHARDAH POLICE STATION AND BENGAL CHEMICAL ON B.T. ROAD
2026_KMC_1017769_1
KMC/WS/IGWTP/102/25-26, DT-20/02/2026
Open Tender
MECHANICAL
Percentage
20 days
BARRACKPORE
AS PER NIT
4 documents required · 4 mandatory
₹0
₹20,000
OFFICE OF THE DY.CE(WS/IGWTP)
20 Jun 2026
3 Mar 2026
23 Mar 2026
3 Mar 2026
19 Mar 2026
11 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | PART-A | - | - | - | - |
| 1 | Signallingn arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 75 | Daily | 202 | ₹15,150 |
| 2 | Hire and labour charges for 100 mm dia bamboo railing on Jhau / Eucalyptus post 1.40 m above G.L and 0.60 m below G.L tied strongly with bamboo railing with coir rope, digging holes for posts in any sort of soil or concrete surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer- incharge after removing the barricade. (Cost of restoration to be paid separately.) (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah / Eucalyptus posts @1.80 m. apart (i) Railing with 4 rows. | 216 | METER | 82 | ₹17,712 |
| 3 | Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made
separately.(ii) 900 mm. x 600 mm. size of board. | 12 | EACH | 813 | ₹9,756 |
| 4 | Hire & labour charges for diesel generating set for lighting including fuel,300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period. | 30 | Daily | 1,650 | ₹49,500 |
| 5 | Earth work inexcavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 1.68 | CUBIC METER PERCENT | 11,927 | ₹20,037.36 |
| 6 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth
beyond 1,500 mm. and upto3,000 mm. but not requiring shoring | 1.12 | CUBIC METER PERCENT | 19,238 | ₹21,546.56 |
| 7 | Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | 66 | SQUARE METER | 386 | ₹25,476 |
| 8 | Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the, Enginner in charge).(b) For additional depth beyond 1.5 m. and upto 3.00 m | 132 | SQUARE METER | 439 | ₹57,948 |
| 9 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] | 3,700 | HORSE POWER HOUR | 33 | ₹1,22,100 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
tecbid.pdf
Tender Documents • 0.68 MB
BOQ_2500783.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .