Tender Value
₹56.5 L
EMD Value
₹56,500
Closing Date
15 Jul 2026, 4:00 pm
Superintending Engineer, RWS, Kakinada
Sujala Bhavan, NFCL Road, Kakinada
Providing Drainage System in Vemagiri thota of Vemagiri GP in Kadiam Mandal, Est. cost Rs.80.00 Lakhs
956010
No.4/2026-27, Dt.25-06-2026
OPEN - NCB
Water Supply
EAST GODAVARI
16 documents required · 16 mandatory
₹1,999
₹56,500
1 Jul 2026
1 Jul 2026
1 Jul 2026
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including overheads and contractor's profit @ 13.615% .
Supply and filling of sand in trenches, sides of foundations with intial lead in layers not exceeding 15cm thick, consolidated each deposited layer by watering and ramming as per drawing and technical specification etc complete finished item of work including overheads and contractor's profit @ 13.615% .
Vibrated Cement Concrete Nominal Mix(1:4:8) using 40mm downgraded HBG metal and including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for CC Bed including conveyance, seigonarage of materials of sand &metal and excluding cost of steel and its fabrication charges etc complete including overheads and contractor's profit @ 13.615% including overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for CC Drain Bottom Slab including overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Side Wall including overheads and contractor's profit @ 13.615% .
Vibrated Cement Concrete (1:2.5:5) using of 20mm downgraded HBG metal including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for side walls of drains including conveyance, seigonarage of materials of sand &metal, including centering charges and conveyance etc for Side Wall including overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Cover Slabs including overheads and contractor's profit @ 13.615% .
Plastering with CM (1:3)mix, 12 mm including cost of all materials and labour charges etc,,complete -for 10 Sqm but including conveyance and serignorage charges of materials of sand etc.complete including overheads and contractor's profit @ 13.615% .
Plastering with CM (1:5)mix, 12 mm including cost of all materials and labour charges etc,,complete -for 10 Sqm but including conveyance and serignorage charges of materials of sand etc including overheads and contractor's profit @ 13.615% .
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification including overheads and contractor's profit @ 13.615% .
Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for finished item of work for Sump including valve chamber and overheads and contractor's profit @ 13.615% .
Supply and filling of Sand in trenches, sides of foundations with intial lead in layers not exceeding 15cm thick, comnsolidated each deposited layer by watering and ramming as per drawing and technical specification etc complete finished item of work for Sump Sand bed including valve chamber and overheads and contractor's profit @ 13.615% .
Drilling of 250 mm diameter Singel Under Reamed piles for a depth of 2.1 mt with RCC(1:1.5;3) using 20 mm size HBG Metal using re1quired quantity of steel per 1 cum of concrete including cost and conveyance of all materials and all labour charges etc complete but excluding cost of steel and fabrication charges of steel per 1 No including overheads and contractor's profit @ 13.615% .
Plain Cement Concrete Nominal Mix(1:3:6) using 40mm downgraded HBG metal and including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for CC Bed including conveyance, seigonarage of materials of sand &metal and excluding cost of steel and its fabrication charges etc CC bed for Sump including valve chamber and overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Sump bottom slab including valve chamber and overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Columns and above sump slab to Pumphouse top slab including overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Sump Side Walls including valve chamber and overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Sump Roof Beam including overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Sump Roof Slab including overheads and contractor's profit @ 13.615% .
Cost and supply of steel Fe 500 including fabrication charges and labour charges etc. complete including overheads and contractor's profit @ 13.615% .
Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete for Sump steps including overheads and contractor's profit @ 13.615% .
RCC M20 grade Nominal Mix using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. Excluding steel and its fabrication charges for Sump roof slab including overheads and contractor's profit @ 13.615% .
Plastering with CM (1:3)mix, 12 mm including cost of all materials and labour charges etc,,complete -for 10 Sqm but including conveyance and serignorage charges of materials of sand etc for Sump Bottom slab and Side walls including overheads and contractor's profit @ 13.615% .
Plastering with CM (1:5)mix, 12 mm including cost of all materials and labour charges etc,,complete -for 10 Sqm but including conveyance and serignorage charges of materials of sand etc for Inside pump house including overheads and contractor's profit @ 13.615% .
White washing with white cement two coats including cost and conveyance of all materials and labour charges etc complete for outside pump house including overheads and contractor's profit @ 13.615% .
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surgace to remove all dirt and remains of loose powdered materials, incluldling cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work for internal walls for Sump and Pump house including overheads and contractor's profit @ 13.615% .
Filling with Gravel to sectioning to camber well watering consolidation thick including all labour charges for Site filling including overheads and contractor's profit @ 13.615% .
Cost,Supply & Delivery of manhole covers M.D. -10 with 500mm dia frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes including overheads and contractor's profit @ 13.615% .
Cost,Supply & Delivery of 450 mm dia NP 3 R.C.C. Plain ended pipes conforming to B.I.S 458/2003, Ex-factory, excluding transportation and all taxes including overheads and contractor's profit @ 13.615% .
Cost,Supply & Delivery and Transportation of 5.00 HP Mono block three phase ISI self priming Mono block IP44 motor pumpset . Makes: As per list of recommended brands as category I including overheads and contractor's profit @ 13.615% .
Cost,Supply & Delivery of 80mm dia GI B Class Pipe
Cost, Supply & Delivery of 140mm dia HDPE 6Kgs/cm2 HDPE PE-100 pipes conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes including overheads and contractor's profit @ 13.615% .
Earth work excavation for 140mm dia HDPE 6Kgs/cm2 HDPE PE-100 pipes trench excavation 2/3rd machinery and 1/3rd manual for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical Specifications (Part-B, Volume-I) . The rates are inclusive of cost and conveyance of all material and labour charges for finished item of pipeline work, but excluding GST and Seigniorge charges but including MA,overheads and contractor's profit @ 13.615%
Horizontal Auger drilling for pipe line crossing oh Road junction of dia 75mm to 140mm dia including all materials and labour charges etc.complete
(Rupees Fifty Six Lakhs Fourty Five Thousand Five Hundred Fourty Six and Paisa Thirty only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
CC Drain Plan.pdf
TENDER_DOCUMENT • 0.34 MB
Part A Volume-I (General).doc
TENDER_DOCUMENT • 0.36 MB
Part B Volume-II (Technical).doc
TENDER_DOCUMENT • 0.13 MB
Vemagiri Thota BOQ.xlsx
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid