Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 22 GR FLOOR ANANDRAJ INDUSTRIAL ESTATE GR FLOOR 02 RADHSHREE SOC VEER SAVARKAR ROAD BHANDUP WEST MUMBAI MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Admitted-Finance |
| 2 | Admitted-Finance B 1 UDYOG SADAN NO 3 M I D C ANDHERI EAST MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | Admitted-Finance |
| 3 | Admitted-Finance C 114 PRECISION POWER PRODUCTS I PRIVATE LIMITED WALUJ MORE CHOWK AURANGABAD MAHARASHTRA 431136 | AURANGABAD | MAHARASHTRA | 431136 | Admitted-Finance |
Tender Value
₹46.6 L
EMD Value
₹2.3 L
Closing Date
5 Mar 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CAPT RAKHI RAM
FMU MUMBAI NAVAL DOCKYARD MUMBAI 400001
TENDER ENQUIRY FOR AIAMC OF STATIC CONVERTERS AND HELO STARTING RECTIFIER CONVERTER FITTED ONBOARD INS DEEPAK
2021_NAVY_420968_1
FMU/344/AIAMC/DEEPAK/CONVERTOR
Open Tender
Marine Services
Turn-key
365 days
FMU MUMBAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
PCDA NAVY
₹2.3 L
Yes
3 Apr 2021
11 Feb 2021
6 Mar 2021
12 Feb 2021
5 Mar 2021
12 Feb 2021
12 Feb 2021 - 26 Feb 2021
120 days
Amount
1ST YEAR
Routines/Fault Localization & Rectification – Helo Starting rectifier & Converter
Routines/Fault localization & rectification – 120 KVA converter
Routines/Fault Localization & Rectification – 14 KVA converter
HELO STARTING RECTIFER & CONVERTOR
Monthly - Carry out internal cleaning of rectifier panel with vacuum cleaner. Check all power circuit bolted connections and tighten those (SCRs & Diodes to be tightened with moment spanners only).
04 Monthly - Check all fuses for tightness in their holders (especially for all glass fuses). Carry out insulation resistance check of AC and DC circuits after removing PCBs from their connection. Carry out voltage measurement checks and ensure following voltages are within specified limits:- (a) Helo starting supply 28.5 V DC (+)/(-) 0.5 V DC (b) Compressor Starting (servicing) 18 V DC.
08 Monthly - Open the panel and remove dust accumulated on components using soft brush and vacuum cleaner. Check tightness of electrical connections of power components and cable connections. NOTE: - Discharge the capacitors in the load circuit to earth before tightening of terminals. Inspect contactors for pitting and carry out cleaning of contractors CON ‘A’ & CON ‘B’ and push button contacts PB1, PB2, PB3 and PB2/2 using soft brush and alcohol.
STATIC FREQUENCY CONVERTOR 14 KVA
Monthly - Remove dust and foreign particles within the chassis and the battery bank using portable vacuum cleaner. Check mounting bolts and terminals for tightness. Keep battery terminals clean. Check all indicator lamps.
04 Monthly - Inspect transformers/chokes for evidence of over-heating damaged insulation or loose mounting screws. Correct any malfunctioning before operating the unit. Tighten any loose screws or nuts. Clean electrical contacts with a cloth dampened in Ethyl alcohol. Do not use leaning cleaning solvent on electrical contacts. Replace if found defective. Check all controls for operability. Check the operation of meters. Replace if any damage or malfunctioning is observed.
08 Monthly - Check the cable for input and output power and internal wiring of components. Check for cracks or broken insulation. Replace as necessary. Inspect the general condition of PCBs. Check The components for evidence of over-heating/cracks/ peeling. Repair or replace the board if necessary. Inspect diodes and silicon controlled rectifiers and their dissipaters for loose mounting or defective electrical connections. Tighten screws and nuts. Inspect PCBs/ sockets for loose components & electrical connections. Tighten the mounting screws & replace the defective TB. Tighten mounting screws if necessary. Inspect the electrical connections. Tighten mounting screws, if necessary. Check electrical wiring for loose /broken solder joints and evidence of peeled insulation & general deterioration. Repair or replace damaged wiring.
STATIC CONVERTORS 120 KVA
Monthly - Clean air inlet and outlet orifices.
04 Monthly - Remove dust and dirt from the convertors. Check earth connections outside convertor and chassis connection inside the convertor. Check convertor plug connectors for tight seat. Remove condensed water, if any. Check side walls and covers for tight seat. Carry out insulation test.
2ND YEAR
Routines/Fault Localization & Rectification – Helo Starting rectifier & Converter
Routines/Fault localization & rectification – 120 KVA converter
Routines/Fault Localization & Rectification – 14 KVA converter
HELO STARTING RECTIFER & CONVERTOR
Monthly - Carry out internal cleaning of rectifier panel with vacuum cleaner. Check all power circuit bolted connections and tighten those (SCRs & Diodes to be tightened with moment spanners only).
04 Monthly - Check all fuses for tightness in their holders (especially for all glass fuses). Carry out insulation resistance check of AC and DC circuits after removing PCBs from their connection. Carry out voltage measurement checks and ensure following voltages are within specified limits:- (a) Helo starting supply 28.5 V DC (+)/(-) 0.5 V DC (b) Compressor Starting (servicing) 18 V DC.
08 Monthly - Open the panel and remove dust accumulated on components using soft brush and vacuum cleaner. Check tightness of electrical connections of power components and cable connections. NOTE: - Discharge the capacitors in the load circuit to earth before tightening of terminals. Inspect contactors for pitting and carry out cleaning of contractors CON ‘A’ & CON ‘B’ and push button contacts PB1, PB2, PB3 and PB2/2 using soft brush and alcohol.
STATIC FREQUENCY CONVERTOR 14 KVA
Monthly - Remove dust and foreign particles within the chassis and the battery bank using portable vacuum cleaner. Check mounting bolts and terminals for tightness. Keep battery terminals clean. Check all indicator lamps.
04 Monthly - Inspect transformers/chokes for evidence of over-heating damaged insulation or loose mounting screws. Correct any malfunctioning before operating the unit. Tighten any loose screws or nuts. Clean electrical contacts with a cloth dampened in Ethyl alcohol. Do not use leaning cleaning solvent on electrical contacts. Replace if found defective. Check all controls for operability. Check the operation of meters. Replace if any damage or malfunctioning is observed.
08 Monthly - Check the cable for input and output power and internal wiring of components. Check for cracks or broken insulation. Replace as necessary. Inspect the general condition of PCBs. Check The components for evidence of over-heating/cracks/ peeling. Repair or replace the board if necessary. Inspect diodes and silicon controlled rectifiers and their dissipaters for loose mounting or defective electrical connections. Tighten screws and nuts. Inspect PCBs/ sockets for loose components & electrical connections. Tighten the mounting screws & replace the defective TB. Tighten mounting screws if necessary. Inspect the electrical connections. Tighten mounting screws, if necessary. Check electrical wiring for loose /broken solder joints and evidence of peeled insulation & general deterioration. Repair or replace damaged wiring.
STATIC CONVERTORS 120 KVA
Monthly - Clean air inlet and outlet orifices.
04 Monthly - Remove dust and dirt from the convertors. Check earth connections outside convertor and chassis connection inside the convertor. Check convertor plug connectors for tight seat. Remove condensed water, if any. Check side walls and covers for tight seat. Carry out insulation test.
MARINE ELECTRICALS (INDIA) LIMITED
Precision Power Products (I) pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .