Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAdmitted-Fee/PreQual/Technical/Finance GRAM BHANGOTA NARAYANBAGAD DISTRICT CHAMOLI | ₹35.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹45.0 L+₹9.4 L (26.4%)Admitted-Fee/PreQual/Technical/Finance | ₹45.0 L+₹9.4 L (26.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹45.0 L+₹9.4 L (26.5%)Admitted-Fee/PreQual/Technical/Finance | ₹45.0 L+₹9.4 L (26.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹46.3 L+₹10.7 L (30.0%)Admitted-Fee/PreQual/Technical/Finance | ₹46.3 L+₹10.7 L (30.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹46.5 L+₹10.9 L (30.7%)Admitted-Fee/PreQual/Technical/Finance | ₹46.5 L+₹10.9 L (30.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LAKHAN SINGH RAWAT L9 | Darshan Singh Negi L7 | Sunil Mishra L3 | RANBIR SINGH L8 | RAKESH SINGH L5 | Puran Singh Negi L1 | DILWAR SINGH L4 | Bharat Singh Patwal L6 | Shedkud Infra Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Excavation in soil, ordinary rock and Hard rock in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | 1 | Job | 35,12,031 ₹35,12,031 | 31,99,495 ₹31,99,495 | 28,28,822 ₹28,28,822 | 34,16,550 ₹34,16,550 | 32,55,292 ₹32,55,292 | 21,00,000 ₹21,00,000 Lowest | 32,38,514 ₹32,38,514 | 30,04,205.74 ₹30,04,205.74 | 31,10,000 ₹31,10,000 |
| 1.02 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 35.5 | Cum | 422 ₹14,981 | 384 ₹13,632 Lowest | 469 ₹16,649.5 | 398 ₹14,129 | 391.3 ₹13,891.15 | 420 ₹14,910 | 389 ₹13,809.5 | 469.2 ₹16,656.6 | 450 ₹15,975 |
| 1.03 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions). | 142 | No | 8,108 ₹11,51,336 | 9,008 ₹12,79,136 | 9,008 ₹12,79,136 | 7,657 ₹10,87,294 | 7,515.4 ₹10,67,186.8 | 8,000 ₹11,36,000 | 7,476 ₹10,61,592 Lowest | 9,008.8 ₹12,79,249.6 | 7,500 ₹10,65,000 |
| 1.04 | Loading of Earth, Sand, Moorum, Manure, Flyash by mechanical means including a lead upto 30 m. (Placing tipper at loading point, loading with front end loader excluding time for haulage and return trip.) | 1 | Job | 2,30,970 ₹2,30,970 | 2,10,416 ₹2,10,416 | 2,56,605 ₹2,56,605 | 2,18,114 ₹2,18,114 | 2,14,085.6 ₹2,14,085.6 | 2,00,000 ₹2,00,000 Lowest | 2,12,982 ₹2,12,982 | 2,56,605.46 ₹2,56,605.46 | 2,04,550 ₹2,04,550 |
| 1.05 | Haulage excluding Loading & Unloading-Haulage of materials by tipper excluding cost of loading, unloading and stacking. Unsurfaced Gravel Road | 1 | Job | 82,890 ₹82,890 | 75,513 ₹75,513 | 92,090 ₹92,090 | 82,000 ₹82,000 | 76,830.69 ₹76,830.69 | 80,000 ₹80,000 | 76,434 ₹76,434 | 92,090.23 ₹92,090.23 | 74,000 ₹74,000 Lowest |
| 1.06 | Construction of reference pillars with RR 1:6 stone masonary and Plastered with 1:4 Mortar, (totally under ground) of length 200mm, width 200mm and height 300mm) as per Fig. 1600.1 (b) and Technical Specification Clause 1602.1 of MORD specifications. | 75 | No | 64.18 ₹4,813.5 | 58.47 ₹4,385.25 | 71.3 ₹5,347.5 | 71 ₹5,325 | 59.23 ₹4,442.25 | 65 ₹4,875 | 58 ₹4,350 Lowest | 71.3 ₹5,347.5 | 71 ₹5,325 |
| 1.07 | Construction of back pillars of RR 1:6 stone masonary and Plastered with 1:4 Mortar, of length 300mm, width 300mm and height 400mm of which 100 mm shall be below ground level as per Fig. 1600.1 (b) and Technical Specification Clause 1602.3 of MORD specifications | 75 | No | 264.9 ₹19,867.5 | 241.33 ₹18,099.75 Lowest | 294.3 ₹22,072.5 | 294 ₹22,050 | 245.28 ₹18,396 | 280 ₹21,000 | 244 ₹18,300 | 294.3 ₹22,072.5 | 290 ₹21,750 |
| 1.08 | Construction of Job pillers of RR 1:6 stone masonary and Plastered with 1:4 Mortar, of length 400mm, width 400mm and height 600mm of which 100 mm shall be below ground level as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4 of MORD specifications | 2 | No | 641.41 ₹1,282.82 | 584.33 ₹1,168.66 Lowest | 712.6 ₹1,425.2 | 712 ₹1,424 | 594.12 ₹1,188.24 | 700 ₹1,400 | 590 ₹1,180 | 712.6 ₹1,425.2 | 600 ₹1,200 |
Tender Value
₹67.4 L
EMD Value
₹1.4 L
Closing Date
1 Dec 2025, 5:00 pmClosed
Executive Engineer PD PWD Karanprayag
Executive Engineer PD PWD Karanprayag
Under the Honourable Chief Ministers announcement number 437/2023 Under upcoming Nanda Rajjat Yatra Hill Side Cutting of Ustoli Sarpani Motor Road Km 07 and 08 in Block-Nandanagar (Ghat), District-Chamoli.
2025_pwd_88927_1
2270/2AC Dated 14/11/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Block-Nandanagar (Ghat)
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
Executive Engineer, PD PWD Karanprayag
₹1.4 L
3 Dec 2025
17 Nov 2025
3 Dec 2025
17 Nov 2025
1 Dec 2025
17 Nov 2025
Amount
Excavation in soil, ordinary rock and Hard rock in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).
Loading of Earth, Sand, Moorum, Manure, Flyash by mechanical means including a lead upto 30 m. (Placing tipper at loading point, loading with front end loader excluding time for haulage and return trip.)
Haulage excluding Loading & Unloading-Haulage of materials by tipper excluding cost of loading, unloading and stacking. Unsurfaced Gravel Road
Construction of reference pillars with RR 1:6 stone masonary and Plastered with 1:4 Mortar, (totally under ground) of length 200mm, width 200mm and height 300mm) as per Fig. 1600.1 (b) and Technical Specification Clause 1602.1 of MORD specifications.
Construction of back pillars of RR 1:6 stone masonary and Plastered with 1:4 Mortar, of length 300mm, width 300mm and height 400mm of which 100 mm shall be below ground level as per Fig. 1600.1 (b) and Technical Specification Clause 1602.3 of MORD specifications
Construction of Job pillers of RR 1:6 stone masonary and Plastered with 1:4 Mortar, of length 400mm, width 400mm and height 600mm of which 100 mm shall be below ground level as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4 of MORD specifications
Shedkud Infra Pvt Ltd (BID ID -407801)
Sunil Mishra (BID ID -407978)
DILWAR SINGH (BID ID -407912)
RAKESH SINGH (BID ID -407917)
Bharat Singh Patwal (BID ID -407884)
Darshan Singh Negi (BID ID -407970)
RANBIR SINGH (BID ID -407778)
LAKHAN SINGH RAWAT (BID ID -407933)
stage.html
html • 0.04 MB
finance_105499.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
Condition.pdf
Tender Documents • 0.21 MB
BOQ_105499.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .