| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.0 L+₹120.02 (0.01%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
11 May 2026, 4:00 pmClosed
Executive Engineer
Kotranka
Restoration of Road from Dholangali to Tali
2026_PWDJK_309191_26
NIT No. 03 of 2026-27 dated 30.04.2026
Open Tender
Civil Works
Percentage
Kotranka
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RnB Division Kotranka
₹24,000
19 May 2026
2 May 2026
12 May 2026
2 May 2026
11 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavating for structure as per drawing and technical specification clause 301.2 including setting out construction of shoring and bracing, removal of slumps and other delirious material and disposal up to a lead of 50mts dressing of sides and bottom and back filling in trenches with excavate suitable material including dewatering if any up to 3mts depth in AKS | 170 | cum | 256.85 | ₹43,664.5 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 6 | cum | 4,826.5 | ₹28,959 |
| 3 | Polygonal/Random Rubble Masonry uncoursed brought to course in 1:6 fine sand mortar in foundation and plinth with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 46 | cum | 5,402.9 | ₹2,48,533.4 |
| 4 | Polygonal/Random Rubble Masonry Laid Dry uncoursed brought to course in foundation and plinth With bond stone. | 41 | cum | 3,262.6 | ₹1,33,766.6 |
| 5 | Providing & filling hand packed stones in wire crates including cost of stones and cartes (NSI) | 195 | cum | 1,850 | ₹3,60,750 |
| 6 | Back filling behind R/wall Abutment wing wall Return wall with available stone from earthwork complete as per drawing & technical specification clause 1204.3.8 labour rate. | 157 | cum | 937.9 | ₹1,47,250.3 |
| 7 | Slip Clearance in soils, mixed with morrum/kankar/shingles/boulders, disposal lead upto 50m and lift upto 1.5m | 325 | cum | 331.15 | ₹1,07,623.75 |
| 8Carriage/ consumption of material | |||||
| 0.9 | Aggregate 40 mm nominal size for an average distance of 38 km by MT | 6 | cum | 661.64 | ₹3,969.84 |
| 0.9 | Stone for an average distance of 10 km by MT | 366 | cum | 328.31 | ₹1,20,161.46 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1001135.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .