Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20Admitted-Finance 6TH FLOOR DELTA HOUSE KULUR BANGRA ROAD KULUR DAKSHINA KANNADA KARNATAKA 575013 UDYAM KR 11 0003419 | DAKSHINA KANNADA | KARNATAKA | 575013 | ₹20 | L1 | Admitted-Finance |
| 2 | L1₹20Admitted-Finance | ₹20 | L1 | Admitted-Finance |
| 3 | L1₹20Admitted-Finance | ₹20 | L1 | Admitted-Finance |
| 4 | L2₹20.70Admitted-Finance | ₹20.70 | L2 | Admitted-Finance |
| 5 | L3₹25.20Admitted-Finance | ₹25.20 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SARAT CHATTERJEE AND CO VSP PVT LTD L1 | INTEGRAL TRADING AND LOGISTICS L3 | SYNERGY SHIPPING PVT LTD L4 | orca logistics private limited L1 | DELTA INFRALOGISTICS (WORLDWIDE) LIMITED L1 | India Ports Global Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00OPERATION AND MAINTENANCE OF EXISTING EQ 4 BERTH AT VPA | |||||||||
| 1.01 | Operation and Maintenance of existing EQ-4 Terminal for carrying out cargo handling operations with Harbour Mobile Cranes (HMCs) (1 + 1 Nos.) and other associated equipment including Administration and Marketing for a period of 10 (ten) years. | 1 | METRIC TONNE | 20 ₹20 | 25.2 ₹25.20 | 36 ₹36 | 20 ₹20 | 20 ₹20 | 20.7 ₹20.70 |
Tender Value
₹27.0 Cr
EMD Value
₹28.0 L
Closing Date
12 Mar 2026, 2:00 pmClosed
CHIEF MECHANICAL ENGINEER
Chief Mechanical Engineer, Mechanical and Electrical Engineering Department, 2nd Floor, Administrative Office Building, Visakhapatnam Port Authority, Visakhapatnam.
Operation and Maintenance of existing EQ-4 Terminal for carrying out cargo handling operations with Harbour Mobile Cranes and other associated equipment including Administration and Marketing.
2026_VPT_268220_1
59/2025-26 /IMEE/MOF/ EQ-4 O AND M/ Dt.20.02.2026
Open Tender
Miscellaneous Works
3650 days
VISAKHAPATNAM PORT AUTHORITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹28.0 L
Yes
CHIEF MECHANICAL ENGINEER CONFERENCE HALL
4 May 2026
20 Feb 2026
13 Mar 2026
20 Feb 2026
12 Mar 2026
20 Feb 2026
27 Feb 2026
OPERATION AND MAINTENANCE OF EXISTING EQ 4 BERTH AT VPA
Operation and Maintenance of existing EQ-4 Terminal for carrying out cargo handling operations with Harbour Mobile Cranes (HMCs) (1 + 1 Nos.) and other associated equipment including Administration and Marketing for a period of 10 (ten) years.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 9.97 MB
BOQ_312118.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid