Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC ok |
| 2 | Rejected-Technical | - | - | Rejected-Technical quated above estimate rate |
| Sl No | Description | Qty | Unit | BIJU SKARIA L2 | SHAMEER BABU K K L1 |
|---|---|---|---|---|---|
| 1.00ROAD CONCRETE | |||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 11.25 | cum | 900 ₹10,125 | 885 ₹9,956.25 Lowest |
| 1.00 | OD167162/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 38 | cum | 3,900 ₹1,48,200 | 3,700 ₹1,40,600 Lowest |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 5 | cum | 11,500 ₹57,500 | 10,300 ₹51,500 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.23 | tonne | 93,471 ₹21,030.98 Lowest | 93,471 ₹21,030.98 Lowest |
| 1.00 | OD167078/2025-2026:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 32 | cum | 400 ₹12,800 | 360 ₹11,520 Lowest |
| 1.01 | OD167265/2025-2026:Filling with quarry muck
Filling up low lying and water logged areas with local material/quarry muck, spreading in layers ,levelling the top at site and consolidation by ramming etc. complete for improving the CBR value of subgrade. | 3.6 | cum | 1,100 ₹3,960 | 980 ₹3,528 Lowest |
| 1.01 | OD167081/2025-2026:Providing and fixing name board of size 600mm x 450mm using MS sheet 2mm
thick,GI pipe 50mm fixing to ground using concrete M15 of size 300x300x450mm | 1 | each | 3,300 ₹3,300 Lowest | 3,300 ₹3,300 Lowest |
Tender Value
₹3 L
EMD Value
₹6,345
Closing Date
25 Oct 2025, 3:00 pmClosed
AE LSGD office muttil gp
AE LSGD office muttil gp
PRO NO.146-Mandad Chazhivayal Road punarudharanam Ward 14
2025_LSGD_809807_1
AE/LIDEW/MTL/146/2025-26
Open Tender
Civil Works - Roads
Item Rate
muttil gp
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,345
Yes
7 Jul 2026
16 Oct 2025
27 Oct 2025
16 Oct 2025
25 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1351159.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1351159.xls
BOQ • 0.30 MB
viewsbd_merged.pdf
Tender Documents • 2.37 MB
DECLARATION.pdf
Tender Documents • 0.01 MB
epaymentform.pdf
Tender Documents • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .