Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹11,931
Closing Date
10 Jul 2026, 6:00 pmDue today
CHIEF ENGINEER (G)
Work of cleaning & inside inspection of Deaerator during AOH/COH or as & When Required of Unit No 3, 4 & 5 at GTPS
306002
EW-285
Open
Miscellaneous Works
Gandhinagar
2 documents required · 2 mandatory
₹1,770
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹11,931
22 May 2026
22 May 2026
17 Jul 2026
22 May 2026
10 Jul 2026
22 May 2026
Date of opening of online Technical Bid,
all relevant documents submitted
through online process, Cover for Tender
fee and EMD at 15:30 Hrs (Online As per Tender Notice
technical bid will be opened for Bidders
who have submitted Cover for Tender
Tentative date of on-line opening of price Party has to be in touch with website
bid (if possible) at 15.30 hrs. https://tender.nprocure.com and
also with e-mail sent by above website
EW-285 PUR-F-006 RFQ-
Important Notes to Bidders:
(1) All the online Annexure and price bid, other tender documents (As per
PQC) must be submitted/attached through online form only. Bidder has
to upload scanned copies of original documents (Notarized / self-attested
copies of original – as specified in tender document) with bid. No physical
documents to be submitted by bidder
(2) Payment of Tender Fee /Earnest Money Deposit (EMD):
All the bidders will be required to pay Tender Fee & EMD as mentioned in
the Tender Document either in Demand Draft, Pay Order or Bank Guarantee
(only for EMD) in favour of Gujarat State Electricity Corporation Limited
payable at Gandhinagar, Gujarat. The scanned copy of original document
shall have to be uploaded online with the bid and RPAD or Speed Post only
addressed to The Chief Engineer (G), Gujarat State Electricity
Corporation Limited, Thermal Power Station, Gandhinagar-382041.
(3) Being three part Bid, bidder shall have to submit their tender in three stages
i.e. PRILIMINARY STAGE (EMD Details- scan copy(online) & Original
document- Hard Copy submission), TECHNICAL STAGE (on line submission
only) and COMMERCIAL STAGE (on line submission only).
First preliminary stage will be opened and if the documents submitted by
bidder towards payment of Tender Fee & EMD are found ok, then only
Technical Bid will be opened (On-line). Tenders submitted without Tender
Fee & EMD by the firms, will be rejected without entering into further
correspondence. Submission of required documents for exemption of
EMD is mandatory.
The exemption in payment of EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering
process for the product which they are manufacturing / service which
they are providing and have Udyam registration for items / service
under procurement.
2. Start-ups which participate directly in tendering process for the
product which they are manufacturing/service which they are
providing and re-cognized by DPIIT under the Start-up India Program
and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing
product of the tender, from Gujarat Khadi Gramodyog Board or Khadi
and Village Industries Commission(K.V.I.C)or Commissioner of
Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for
their own manufactured items.
5. State Government recognized organizations like(i) organizations for
blinds, dumb and deaf, disabled, mentally disabled
persons;(ii)women's self-help group recognized by Gujarat Livelihood
Promotion Company; which participate directly in tendering process
for the product which they are manufacturing / service which /they
1. Micro & Small Enterprises (MSEs) who participates directly in the
tendering process as Manufacturers or Service Providers, and holds a
valid Udyam Registration, are eligible for exemption from payment of
Earnest Money Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-
sellers, or similar categories (i.e. other than Manufacturers/Service
Providers) are not eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward
EW-285 PUR-F-006 RFQ-
change in terms of investment in plant and machinery or equipment
or turnover or both, and consequent re-classification, an enterprise
shall continue to avail of all non-tax benefits of the category (micro or
small or medium) it was in before the re-classification, for a period of
three years from the date of such upward change.
Vendor Registration with GSECL is not compulsory for submitting this
(4) If any Bank Guarantee submitted against EMD/security deposit/PBG, same
should be valid one year from the date of expiry of BG. Bank Guarantee
should be confirmed through Structured Financial Messaging system
(SFMS). SFMS allows intra/interbank message transfer system of banking.
Our bank details are as under.
ACCOUNT NAME GSECL
BANK NAME & BRANCH BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
(5) The tender received after time and date specified in the tender notice
will not be accepted. Once the offer Submitted by the Contractor before
due date of submission, the Contractor will not be allowed to submit
revised/ additional/Modified/other after opening of bid. Any
alterations/ modification to the bids received after submission of offer shall
not be considered unless carried for by the Corporation in negotiation.
(6) Any deviation found in Data / Details / Documents between on line offer (e-
tendering) and physically submitted documents (Tender document fee,
Technical offer of the bidder) offer of the same bidder will not be considered
and no any further communication in the matter will be entertained.
Further bidders are requested to submit price – bid (Part-II) on-line only and
not to submit the price bid in physical form. This is mandatory. If price bid
is submitted in physical form, same will not be opened and only on-line
submitted price bid will be considered for evaluation. Further if the quantity
quoted differs in the any of the technical bid forms and in price bid forms, it
is discretion of CE Committee –GSECL to consider the quoted quantity.
(7) PLEASE MENTION:
(a) EPF Code No.: _________________ (The contractor shall have to submit in
online the attested copy of EPF code certificate issued by RPFC without
fail otherwise tender will not be considered )
(c) GSTIN Registration No. : _____________________________________ ( For
Works & supply )
(8) In case short submission of documents with bid and / or clarification if any
required from the bidder, The required details / documents may be asked
(9) It shall be sole responsibility of the bidder that the uploaded scanned
documents (in PDF form) Remain legible and should not be password
(10) Tender will be evaluated on basis of Data / Details / Documents submitted
by online form only.
(11) It is mandatory for all the bidders to upload their tender documents by on
line only (E-tendering) in scheduled time. No documents shall be
considered physically which are mentioned for on-line submission only.
(12) The bidders are required to fill up all the online annexure / forms and shall
be uploaded invariably. This is intended for transparency and speedy
evaluation of the bids. Instead of simply confirming / attached in bid / refer
physical offer, the Bidder shall fill in the particulars against appropriate
EW-285 PUR-F-006 RFQ-
place in respect of each line appearing in each online annexure. Wherever
required, bidder shall invariably have to upload supporting authentic
documents in the online bid. (In the absence of required details in the online
annexure, the purchaser has every right to evaluate the bids accordingly
and bidder cannot raise any objection against any point during evaluation.
(13) Bidders are requested to remain in touch with the web-site for any
amendment / corrigendum or extension of due date etc
(14) EMD Fee Demand Draft with different purchaser or agency shall not be
accepted. Tender without EMD shall be rejected.
(15) The GSECL reserves the right to award the work to one or more bidders,
considering their technical and financial capacity OR to reject any or all
tenders or accept any tender without assigning any reason thereof.
(16) Once the offer Submitted by the Contractor before due date of submission,
the Contractor will not be allowed to submit revised/
additional/Modified/other after opening of bid. Any alterations/ modification
to the bids received after submission of offer shall not be considered unless
carried for by the Corporation in negotiation
(17) GSECL reserves the rights to reject any OR all tenders without assigning any
reasons thereof.
(18) Vendor get to register in VMS System through vms.guvnl.com. For registration
following documents are required and mail to [email protected] and
[email protected]. After registration vendor have to upload the invoice in
the VMS system for smooth functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
Site : vms.guvnl.com
Username : PAN (PAN number)
Password : MyInvoice@123
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-285 PUR-F-006 RFQ-
BIDS FOR WORKS GENERAL CONDITONS
The tenderers should thoroughly read all the following clauses before submitting
online tender with Tender Fee & EMD Fee cover will be opened as per tender
notice date and time. and if the documents towards payment of Tender Fee &
EMD are found OK then only, offer of the bidder will be considered for further
EMD will be forfeited (i) if the tender, which it covers, is withdrawn during the
validity of the offer and (ii) the Tenderer fails to furnish / deposit the security
“It shall be mandatory to submit security deposit within 10 days from the
date of issue of Letter of Intent before order placement. In case when
successful bidder not at all responding within notice period or withdraws his
offer then his EMD shall be forfeited and he will not be allowed to participate
in the tenders invited from the same office for the period of One year for that
place from where tender is invited.”
1. TECHNICAL BID: (Online only not by physically)
1.1) The technical bid comprises scope and nature of works and quantity of
works/jobs, drawings (Refer Schedule-B), required technical qualification for
execution of the works/job etc. for which price are to be quoted. Also, all the
technical details of the stores/materials offered in accordance with the
Corporation scope of work, specification guaranteed technical particulars
and conditions, etc
The supplier/contractor should mention separate HSN/SAC code and rate of
GST and cess as applicable for each item of goods/services. If no specifically
mentioned then company will have option to take the prices as exclusive of
taxes and duties at maximum higher slab rates for the evaluation of tenders.
1.2) The Technical Bid shall be opened as per Tender Notice (If possible).Please
note that the required documents should be invariably submitted in online
only. If party has not submitted tender in online is liable to be ignored.
1.3) Contractor has to submit all required documentary evidences thereof to
qualify for acceptance of their technical bid. The acquisition of the tender
documents by any party will not automatically qualify the party as to its
capability to execute such or similar orders. The Corporation shall assess
the capability of the party at the time of evaluation of the technical bids.
1.4) The submission of the offer by any contractor does not mean that the bidder
is qualified for execution of the works. After opening of the online technical
bids, the competent authority will evaluate on the basis of technical
qualification criteria. If contractor’s bid does not meet the technical
qualification criteria, then his technical bid will be ignored. Decision taken
by the CE(G),GTPS will be binding to all in this regard.
2.1) The price bid comprises Schedule-B, in which the tenderer has to offer their
rates in accordance with the technical specification specified in technical bid
with all commercial terms and condition. The Price Bid must be submitted
strictly as per Schedule-B and shall be submitted online only, not by
Incomplete bids and amendments and additions to bids after opening of the
bids will be ignored out rightly.
The price bid of those who are techno-commercially qualified shall be
opened. After technical bid is opened, for modification, if any, all shall be
given equal chance.
2.2) Price bids of technically acceptable tenders shall be opened after analyzed
&scrutiny of the technical bid.
2.3) The ‘TECHNICAL” and ‘PRICE” Bids shall contain adequate cross-reference
wherever necessary to ensure clear and proper co-relation of the two bids
without ambiguities whatsoever. Any technical questions information and
EW-285 PUR-F-006 RFQ-
clarifications that may be required pertaining to this Tender should be
referred to the Chief Engineer (Gen), Gandhinagar, TPS-382041 reserves the
right to reject any OR all tenders without assigning any reasons thereof.
2.4) Bidders have to quote their rates online only as per GSECL’s given format of
2.5) The offered prices to be indicated in online mode of tender in the format
given (i.e. Schedule-B) the price bid submitted in physical mode shall not be
CONDITIONS FOR PRICE BID
a) For Works & Supply GST rate will be paid with the applicable GST rules.
b) For Supply Portion Only:-“Party shall have to quote their rates in
Schedule “B” of price bid only along with commercial terms and conditions.
The details of applicable GST, service charges, packing & forwarding
charges, freight, insurance, F.O.R. etc.
The supplier/contractor should mention separate HSN/SAC code and rate of
GST and cess as applicable for each item of goods/services. If no specifically
mentioned then company will have option to take the prices as exclusive of
taxes and duties at maximum higher slab rates for the evaluation of tenders.
It is mandatory to indicate GST NO in annexure 10a of tech. bid otherwise if
no specifically mentioned then company will have option to take the prices
as exclusive of taxes and duties at maximum higher slab rates for the
evaluation of tenders.
3. Applicability of Goods and Service Tax (GST):-
(a) The tenders shall be evaluated on firm price and cost with GST and cess as
applicable unless otherwise mentioned in the tender documents.
(b) If the supplier/contractor have opted for the composition scheme of GST,
the same must be clearly specified with valid declaration and certificate from
department. In the event of withdrawal/ cessation of the supplier from
composition scheme during the tenure of the contract, the rate(i. e. price)
mentioned in the price bid shall be final and any additional GST will have to
be borne by the tenderer himself, In no case additional amount towards GST
or otherwise will be paid/reimbursed to supplier/contractor.
(c) The bidder shall have to inform their GST no. of the registered place(s) where
from the bidder intends to supply the goods/services, meaning there by the
bidder has to supply the goods/services from the relevant declared/
registered place(s) of supply only.
(d) The bidder shall not include GST in their quoted rates; but the bidder has to
separately indicate the GST rate, amount in the price bid schedule.
(e) In-case Govt notification comes for change in GST , the same will be
(f) Bidder should indicate GST no.( copy of GST registration to be enclosed) and
PAN NO. (copy of PAN to be enclosed) Tenders submitted without GSTIN
No by the firms, the offer will be rejected without entering into further
correspondence.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-285 PUR-F-006 RFQ-
Other Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage
that may be caused in his man or material. Moreover, the contractor shall
be fully responsible for any damage caused to the Corporation’s properties
done by his man/materials while executing the work. The Corporation will
be entitled to recover the damage from the party’s bill.
2. At any time if GSECL feels that progress of work is unsatisfactory and work
force of contractor is inadequate, other agencies/ departmental personnel
will be put in parallel for expediting the work. Amount so incurred will be
recovered from the contractor’s bill. In this case decision of the Engineer-in-
charge shall be final and binding to the contractor.
3. At any stage of the contract period, if the contractor fails to complete the job
or his work is not found satisfactory the same will be got done at his cost
and risk and additional expenditure incurred by the Corporation will be
recovered from him by giving one week's notice.
4. To sublet or transfer of contract without prior written approval of
Corporation shall be treated as breach of contract and it shall be punishable
by forfeiting the S.D. as well as termination of contract.
5. The Corporation reserves the right to forfeit the S.D. in case of any breach of
contract and in case of disputes. The decision of Chief Engineer (Gen), TPS
GANDHINAGAR shall be final, binding & acceptable to the Contractor. If
contractor fails to start the Work as Stipulated, the E.M.D. & S.D. Shall be
6. Conditional tender will not be accepted. Withdrawal of tender condition
unilaterally by you before or after opening of tender will not be
7. The contractor has to carry out the required work strictly according to
guidance given by the Corporation's responsible officer.
8. The Corporation reserves the right whether the materials to be accepted, or
not. Only specified and scheduled materials are to be examined by
Corporation's officer and then if suitable will be accepted by the Corporation.
9. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS,
Gandhinagar which will be paid after the certificate regarding correct receipt
of the materials in good condition.
10. The rates should be quoted without any condition. The rates be written in
words and figures legibly.
11. Revision of prices or any commercial terms affecting the price after
opening of technical bids shall not be considered and will be ignored.
12. The contractor shall have to execute an agreement with the Corporation on a
non judicial stamp paper, the cost of which will have to be borne by the
contractor and will have to sign the contract and tender booklet of the
13. SECURITY DEPOSIT: In tender process for L1 bidder(lowest bidder)
security deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than
Lakh Rs. 5 Lakh
Enterprise or Exempted 3% of Order Value
Organization which are
exempted from paying
For all other Enterprises 5% of Order Value 5% of Order Value
Note: Security Deposit will be collected from the successful tenderer at the rates
mentioned above. This may be recovered by deduction through running bills of
the contractors and / or by treating the Earnest Money Deposit (Bid Security)
paid at the time of submission of the tender.
EW-285 PUR-F-006 RFQ-
14. The Bank Guarantees will be executed on the standard form prescribed by
the corporation. In case of the Bank Guarantees furnished / submitted, they
should have clear one time validity till the completion of the order in all
respects and up to the expiry of Guarantee period from the date of the work
completion. Bank Guarantee for Interim period will not be allowed. If by any
reasons the work period is extended then contractor should undertake to
renew the Bank Guarantee at least one month before the expiry of the
validity failing which GSECL will be at liberty to encash the same.
“It shall be mandatory to submit security deposit as per above table
within 10 days from the date of issue of Letter of Intent before order
placement. In case when successful bidder not at all responding within
notice period or withdraws his offer then his EMD shall be forfeited and
he will not be allowed to participate in the tenders invited from the
same office for the period of One year for that place from where tender
If the Tenderer fails to pay the Security Deposit or defaults in
execution of the orders placed or if GSECL suffers any financial loss
due to this, then GSECL will be at liberty to adjust the amount from
other orders of the same firm or by encashing the Bank Guarantee.
All the costs of the stamp papers, other than required for payment is
to be made through SIDBI / ICICI by Board, are to be borne by you as per
the Govt. of India’s latest guidelines.
15. VALIDITES OF THE OFFERS:
The offers will have to be kept valid for a period of 180 days from the date of
opening of technical bids. In case of finalization of the tender is likely to be
delayed, the tenderers will be asked to extend the same without change
in the prices or any terms and conditions of the offer. If any change is
made, original or during the extended validity period, the offers will be liable
for outright rejection without entering into further correspondence in this
regard and no reference will also be made.
16. If successful contractor fails to pay the required security deposit and does
not come forward to execute the work, the full value of EMD will be forfeited
by the Corporation.
17. Any terms and conditions mutually agreed to writing shall be for a part of
18. Payment will be made as per GSECL’s rule.
19. The authorized officer/person of the Corporation will have the liberty to
check the material and work etc.
20. Regarding the quality and acceptance of the jobs the authorized officer's
decision will be binding and final and no dispute on this account will be
21. General terms and conditions of the Corporation for works contract will be
made applicable for this work also.
22. No material for the said work will be supplied by the GSECL except specified
in schedule thereof.
23. WORK COMPLETION PERIOD: The Tenderers will have to confirm work
completion period as specified in this tender. Delay in execution of order
on account of any other reason will be subject to penalty.
24. PBG (Not Applicable) : “The supplier/contractor/party (i.e. tenderee) has to
give Bank Guarantee with validity period of additional 01 (one) month i.e.
more than actual Guarantee/Warranty period of 6/12/18/24/36/48/60
months (depending upon product) to safeguard Company’s interest in case
of any eventuality happening on the last day of the Guarantee/Warrantee
period after office hours of the Bank or Bank holidays.”
25. PENALTY FOR LATE EXECUTION OF WORK: Any delay that may take
place in supply and / or erection, testing and commissioning activities
beyond contractual cutoff date / stipulated period in the order shall be
EW-285 PUR-F-006 RFQ-
subjected to penalty (not liquidated damages) at the rate of ½% of the
contract price / order price per week or part thereof subject to a maximum
of 10% of the total contract value / order value (i.e. End cost including taxes
26. Statutory variations:-any statutory increase or decrease on the taxes and
duties subsequent to your offer if it takes place within the original
contractual delivery date will be to the company’s account subject to the
claim being supported by documentary evidence. However if any decrease
takes place after the contractual delivery date the advantage will have to be
passed on the company
27. If the work is not done as per specification given by the GSECL in stipulated
time in all respects, the penalty will be levied as per GSECL's rules.
28. The GSECL shall have the right to make any changes, additions / deletions
or modifications in any terms / conditions of the tender and / or
specifications as may be deemed necessary by the GSECL at its sole
discretion at any time before the due date of opening of the tender.
29. Tenderer should furnish a list of orders for similar work executed by them
indicating the name of the party and their order reference to whom they
have worked, to be furnished in Annexure- 6. Failure to do this will result on
contractor’s tender being rejected without any reference.
30. GSECL does not accept the printed conditions of any Tenderer. It will be
ignored without any reference; hence tenderers should withdraw such
printed conditions if they have any.
31. Tenders will be accepted only on or before due date and time of opening.
32. If technical deviations furnished by the Tenderer are not agreeable to the
GSECL, the offers may be ignored. However it will be solely at GSECL’s
discretion to consider the technical deviations OR not for considering the
Tenderer. No correspondences of the Tenderer after opening of the bid will
be entertained in this matter.
33. The contractor will be responsible and liable for any damage to man and
materials during his work.
34. While execution of this job our plant and auxiliaries will be in running
conditions. Hence contractor has to take all precautions for safety etc. Safety
belts etc. also to be used wherever necessary while working.
35. GSECL reserve the right to terminate the contract if quantity shown in
Schedule-B is executed earlier.
36. All the terms and conditions specified in Industrial & safety laws are binding
on the contract.
37. Registration certificate under labor contract act will have to be obtained
before execution of contract.
38. The laborers shall be supplied for 8 hours a day, so contractors shall
arrange accordingly.
39. The following List of Annexures and Documents (available in this tender
document) should be invariably submitted along with the tender:
(i) Schedule–“A” Indicating the Description of work & quantities for the
(ii) Schedule–“B” Price Bid to be submitted online ONLY”
(iii) Annexure-“A” - Technical Scope of Work
(iv) Form of Bankers undertaking Performa for E.M.D and S.D.
(v) Annexures – 1 TO
(vi) Certificate – “A”.
(vii) Document of Important Instructions.
All the above documents should be duly filled in, signed & stamped with
company’s seal should be submitted along with the Technical Bid in online
40. Please note that any additional conditions / deviations, if any, found in the
Commercial terms & conditions, then the Price Bids of such tenderers will
not be opened and no further correspondences in the matter will be allowed.
EW-285 PUR-F-006 RFQ-
41. Tenderer should invariably fill up all the details of all the Annexure of this
tender document. This is mandatory. Also all the Annexures should be duly
signed by authorized signatories with their rubber stamp and along with
Company’s Rubber (Round) seal / stamp affixed on each paper.
42. All the tenderers must ensure that all the relevant documents / papers
submitted with the tender should be serially numbered, and properly
documented. This must be adhered to.
43. All the above points should be complied by the Tenderers. If not, tenders are
likely to be ignored without making any further reference.
44. If participating bidder/agency have stake in one or more other agencies /
bidder who are participating in same tender and on account of submission
of wrong information / declaration in the tender / enquiry certificate – A,
then the bidder will be declared as disqualified automatically and EMD / SD
will be forfeited. Further, GSECL shall take stern action including stop
dealing with their firms’
45. The CE(G),GSECL, Gandhinagar, reserves right to reject/accept any or all
tenders without assigning any reasons thereof and to split up the work
between the parties as the case may be.
46. Relationship of employee: - Every bidder should, at the time of submission
of bid, give a declaration as under.
“If in any bidder company/firm, the interest (i.e. Shareholding in company
and share in partnership firm) of any employee of the tendering Company or
his/her relative as defined in section 2(77) of the Company’s act. 2013 is
10% or more, the tendering Company will not deal with such company/firm
Tenderer therefore, must specifically disclose this fact in his technical bid.
Non-disclosure of such facts would immediately disqualify the tenderer for
further dealing with the tendering company.”
47. Conflict of interest among Bidders/Agents: A bidder shall not have
conflict of interest with other bidders. Such conflict of interest can lead to
anti-competitive practices to the detriment of Procuring Entity’s interests.
The bidder found to have a conflict of interest shall be disqualified. A bidder
may be considered to have a conflict of interest with one more parties in this
bidding process, if:
a) they have proprietor/partner(s)/Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial
stake from any of them; or
c) they have the same legal representative/agent for purposes of this bid;
d) they have relationship with each other, directly or through common
third parties, that puts them in a position to have access to information
about or influence on the of bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved. However,
this does not limit the inclusion of the components/sub-
assembly/assemblies from one bidding manufacturer in more than one
f) in cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two
manufacturers or quote on their behalf in a particular tender enquiry.
One manufacturer can also authorize only one agent/dealer. There can
be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on
his behalf; and
2. Indian/foreign agent on behalf of only one principal.
EW-285 PUR-F-006 RFQ-
g) a Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract that
is the subject of the Bid;
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common business
ownership/management, only one unit should quote. Similar
restrictions would apply to closely related sister companies. Bidders
must proactively declare such sister/common business/ management
units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of
competition act, as amended from time to time. Every bidder should,
at the time of submission of bid, give a declaration, that bidder shall
not have conflict of interest with other bidders, as above
48. All bidders shall submit the details/documents in support of Technical
Qualification Requirements duly certified and verified for authenticity from
Specified Third-Party inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm along with a certificate regarding
verification of authenticity of documents as per the format placed at Annexur-1.
All the documents submitted by the bidder in support of the meeting Technical
QR only shall be digitally signed by the Specified Third-Party inspection Agency
(TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm.
The verification and certification of authenticity of documents is acceptable
from any of the following TPIAs:
1. M/s Competent inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s international Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt. Ltd.
9. M/s Bureau Veritas (India) Pvt. Ltd.
10. Hertz Inspection & Services Pvt. Ltd.
11. IRCLASS Syslems and Solutions Pvt. Ltd.
Verification for authenticity shall not be applicable in following cases.
1: Bidders having proven track record or regular suppliers/contractors (i.e.
2: Past order copies of GSECL as these documents can be verified internally.
Bidders shall be responsible for getting their documents/ credentials verified
& certified by the Specified Third-Party inspection Agency (TPIA) or Statutory
Auditor of their Company or Practicing CA/CA Firm in support of Technical
QR. All the costs pertaining to third party verification and certification
(including those by statutory auditors) shall be borne by the Bidder. GSECL
shall have no liability (financial or otherwise) towards the same and shall not
be liable for any claim/ dispute between the bidder and the Specified Third-
Party inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm.
Chief Engineer (G)
GSECL: Gandhinagar TPS
I/ We hereby agree for the terms & conditions laid down in Tender.
Contractor's Signature
With Seal & Date
EW-285 PUR-F-006 RFQ-
Undertaking from Third Party Inspection Agency/Statutory Auditor or
Practicing CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of
Gandhinagar TPS.
Subject: Authentication of veracity of documents submitted by M/s …….. in
support of Meeting the Qualifying Requirements
Ref : Tender no.: ________________
Name of the Package/ Tender:
M/s._______________________________________________(hereinafter called Bidder)
having Registered office at_____________________intend to participate in above
referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting
Documents pertaining to Qualifying Requirement duly verified and certified by
Third-Party Inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm as per the list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following
documents, which are also attached with this letter. The same has been verified
from the Original Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and
All the aforesaid documents have been digitally signed by us as a certificate of
We further confirm that we neither have any vested interest in aforesaid tender
nor have any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s._____________________________
(Bidder) for the purpose of participating in the subject tender/s.
EW-285 PUR-F-006 RFQ-
General Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage that
may be caused in his man or material. Moreover, the contractor shall be fully
responsible for any damage caused to the Corporation’s properties done by his
man/materials while executing the work. The Corporation will be entitled to
recover the damage from the party’s bill.
2. At any time if GSECL feels that progress of work is unsatisfactory and work
force of contractor is inadequate, other agencies/ departmental personnel will
be put in parallel for expediting the work. Amount so incurred will be recovered
from the contractor’s bill. In this case decision of the Engineer-in-charge shall
be final and binding to the contractor. At any stage of the contract period, if the
contractor fails to complete the job or his work is not found satisfactory the
same will be got done at his cost and risk and additional expenditure incurred
by the Corporation will be recovered from him by giving one week's notice.
3. Subletting the contract to other agency is not permitted unless and otherwise
approved by the competent authority.
4. The contractor has to carry out the required work strictly according to guidance
given by the Corporation's responsible officer.
5. The Corporation reserves the right whether the materials to be accepted, or not.
Only specified and scheduled materials are to be examined by Corporation's
officer and then if suitable will be accepted by the Corporation.
6. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS,
Gandhinagar which will be paid after the certificate regarding correct receipt of
the materials in good condition.
7. Any terms and conditions mutually agreed to writing shall be for a part of the
8. The authorized officer/person of the Corporation will have the liberty to check
the material and work etc.
9. Regarding the quality and acceptance of the jobs the authorized officer's
decision will be binding and final and no dispute on this account will be
10. General terms and conditions of the Corporation for works contract will be
made applicable for this work also. The booklet is attached herewith.
11. No material for the said work will be supplied by the Corporation except
specified in schedule thereof.
12. Penalty :-If the work is not done as per specification given by the Corporation
in stipulated time in all respects, the penalty will be levied as per Corporation's
rules. Any delay that may take place in supply and / or erection, testing and
commissioning activities beyond contractual cutoff date / stipulated period in
the order shall be subjected to penalty (not liquidated damages) at the rate ½ %
of the contract price / order price per week or part thereof subjected to a
maximum of 10% of the total contract value/ order value (i.e. End cost
13. Statutory variations:-any statutory increase or decrease on the taxes and duties
subsequent to your offer if it takes place within the original contractual delivery
date will be to the company’s account subject to the claim being supported by
documentary evidence. However if any decrease takes place after the
contractual delivery date the advantage will have to be passed on the company.
14. The contractor will be responsible and liable for any damage to man and
materials during his work.
15. While execution of this job our plant and auxiliaries will be in running
conditions. Hence contractor has to take all precautions for safety etc. Safety
belts etc. also to be used wherever necessary while working.
16. Corporation reserve the right to terminate the contract if quantity shown in
Schedule-B is executed earlier.
17. All the terms and conditions specified in Industrial & safety laws are binding on
EW-285 PUR-F-006 RFQ-
18. Registration certificate under labor contract act will have to be obtained before
execution of contract
19. The laborers shall be supplied for 8 hours a day, so contractors shall arrange
20. Payment Terms: Party has to accept payment terms as per GSECL rules only
i.e. as per actual work done. NO ADVANCE payment will be allowed. Net
Payment will be released within 30 days after completion of work and
submitting their relevant invoices.
21. Dispute Resolution Mechanism: For works contracts and composite Contracts,
the arbitration mechanism shall be governed by the Gujarat Public Works
Contracts Disputes Arbitration Tribunal Act, 1992 as per below details.
(1) Amicable Settlement : "Any dispute, difference, controversy or claim
between the parties arising out of or relating to this contract with reference
to the construction, interpretation, breach, termination or validity thereof
(herein after referred as "the Dispute") shall, upon the written request of
either party by referred to the authorized representatives of the Disputing
Parties for resolution. The authorized representatives shall promptly meet
and attempt to negotiate in good faith a resolution of the Dispute within
thirty days of the service of the request."
(2) Arbitration: If the Parties fail to amicably resolve the disputes or differences
or contrary claims as indicated herewith in sub clause (1) of Clause
arising under or in connection with the present works contracts, whether
pertaining to works contracts alone or works and procurement both, the
same shall be referred to arbitration under the Gujarat Public Works
Contracts Disputes Arbitration Tribunal Act, 1992."
22. For procedure for health check-up accordingly bill shall be reimbursed once
during total contract period (for as & when and AOH/COH contract) maximum
up to Rs.1000 or actual cost per worker/ labour /person, whichever is
minimum after verification & recommendation by concern doctor. In case any
worker left the work in between than for replacement Worker Company will not
provide any reimbursement, however it is compulsory to submit new report of
replacement worker for fitness certificate at contractor’s own expense.
23. For Periodic Medical examination, No reimbursement for periodic medical
examination to be given to contract employee for whom GSECL are conducting
Periodic Medical examination at company’s cost at GTPS. If a contractor fails to
undergo periodic medical examination, they have to undergo prescribed
investigation as per hazard analysis from outside, No reimbursement to be
given for these investigations.
Chief Engineer (G)
GSECL: Gandhinagar TPS
I/ We hereby agree for the terms & conditions laid down in Tender.
Contractor's Signature
With Seal & Date
EW-285 PUR-F-006 RFQ-
BID - QUALIFICATION CRITERIA FOR TECHNICAL BID
Work of cleaning & inside inspection of Deaerator during AOH/COH or as & When
Required of Unit No 3, 4 & 5 at GTPS.
Pre-Qualification Criteria (PQC) (To be submitted with Technical Bid):-
The bidders are requested to submit the technical bid with the following
credentials for technically qualifying criteria in soft ONLY.
Technical Bid Qualifying Criteria regarding
1 The bidder should have executed / completed similar
works during the last seven (7) years in Government /
semi government / state electricity board / private
limited company / public limited company / IPP , as on
last date of the month preceding the month of
publication of tender, having minimum contract /order
values as indicated below :
a) One order of value not less than the amount
equal to Rs. 318139.00 of the estimated cost.
b) Two orders, each of value not less than the
amount equal to Rs. 198837.00 of the estimated
c) Three orders, each of value not less than the
amount equal to Rs. 159070.00 of the estimated
Similar work means – Similar work means party shall
have an experience of maintenance/replacement work
of High Pressure Heater/Vessels/Equipment, Air
Preheater Works, Various Cooler Cleaning and
Dearator cleaning work only. Experience in other
company/firm as an employee will not be considered.
3 Financial qualification criteria:
(1) The Average Annual Turnover of the bidder, shall
not be less than Rs 1.20 (Rupees One Lakh
Twenty thousand only ) during the preceding three
(3) financial years as one date of Techno-
Commercial bid opening.
(2) Net worth of bidder shall not be less than 100% of
the bidder’s paid up share capital as on the last day
of the preceding financial year. In case the Bidder
meets the requirement of Net worth based on the
strength of its Subsidiary (ies) and/or Holding
company and/or Subsidiaries of its Holding
Companies wherever applicable, the Net worth of the
Bidder and its Subsidiary (ies) and/or Holding
company and/or Subsidiary (ies) of the Holding
Company, in combined manner should not be less
than 100% of their total paid up share capital.
However individually, their Net worth should not be
less than 75% of their respective paid share
EW-285 PUR-F-006 RFQ-
Net worth in combined manner shall be calculated
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3)
X 100, where x1,x2, x3 are individual net worth
which shall not be less than 75 % of the
respective paid up share capitals and y1, y2, y3
are individual paid up share capitals.
(3) In case the bidder is not able to furnish its audited
financial statements on stand-alone entity basis, the
unaudited unconsolidated financial statements of
the bidder can be considered acceptable provided
the bidder further furnishes the following
documents for substantiation of its qualification.
Copies of the unaudited unconsolidated
financial statements of the bidder along with
copies of the Audited consolidated financial
statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding
Company, stating that the unaudited
unconsolidated financial statements form part of
the Consolidated Annual Report of the company.
(4) In cases where audited results for the last preceding
financial year as on the date of techno-commercial
bid opening are not available, the financial results
certified by a practicing Chartered Accountant shall
be considered acceptable. In case, Bidder is not able
to submit the Certificate from practicing Chartered
Accountant certifying its financial parameters, the
audited results of three consecutive financial years
preceding the last financial year shall be considered
for evaluating the financial parameters. Further, a
Certificate would be required from the CEO/CFO,
stating that the Financial results of the Company
are under audit as on the date of Techno commercial
bid opening and the Certificate from the practicing
Chartered Accountant certifying the financial
parameters is not available.
5) The bidder must submit Average Annual Turnover
and Net worth Certificate in support of Financial QR,
duly certified and verified for authenticity from
Independent Statutory Auditor of their company /
Practicing Charted Accountant/ C.A. Firms / TPIA
(Third-Party Inspection Agency ) empaneled /
approved by GSECL along with copy of Annual
Audited Accounts of last three years
Note for point No.1, 2, 3 & 4:
I. Other income shall not be considered for
arriving at annual turnover.
II. “Holding Company" and “Subsidiary Company”
shall have the meaning ascribed to them as per
Companies Act of India, in vogue.
III. Net worth means the sum total of the paid up
share capital and free reserves. Free reserve
EW-285 PUR-F-006 RFQ-
means all reserves credited out of the profits
and share premium account but does not
include reserves credited out of the revaluation
of the assets, write back of depreciation
provision and amalgamation. Further, any debit
balance of Profit and Loss account and
miscellaneous expenses to the extent not
adjusted or written off, if any, shall be reduced
from reserves and surplus.
4 Details of P.F. code No. from the appropriate provident
fund authorities and details of P.F. paid to the
employees for last six months. Certificate of separate
provident fund account number.
5 Copy of PAN No.
6 Partnership Deed/Memorandum of Association &
Articles of Association: If contractor is not sole
proprietor, then contractor shall have to furnish the
copy of partnership deed along with offer. In case of a
Corporation, the M/A & A/A is required to be
submitted, without which offer is likely to be ignored. If
contractor shall also submit power of Attorney.
7 Labour License for labour Contract: The contractor
on getting the work order but before starting the work
shall have to furnish the copy of Labour License under
the Contract Labour (R & A) from the appropriate
authorities without which the contract order is liable to
be terminated, if applicable.
8 Details of Tools, tackles, equipments and personals
available with firm relevant to the job/subject tender.
9 Copy of the updated valid labour contract license from
the appropriate authorities and updated workman
group insurance policy covering labour engaged, before
10 Details of skilled/semi-skilled persons presently
employed by the contractor having sufficient knowledge
of similar jobs.
11 Copy of valid GST Reg. No
1. The Chief Engineer (Gen.), GSECL, GTPS reserve right to reject any tender or all
tenders without assigning any reason thereof and to split up the work between more
than one party as the case may be.
2. Non-compliance of above criteria the technical bid is liable to be rejected. After
acceptance of the Technical Bid, the Price Bid will be considered for opening.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-285 PUR-F-006 RFQ-
Sr. Details Confirmation
No. (Tick √ any one)
1 Annexure – 2 YES / NO
2 Firm’s details as per “Annexure –3” YES / NO
3 Copy of the un-priced schedule (Description and YES / NO
price). “Annexure - 4”.
4 Work Completion Period as per “Annexure- 5” YES / NO
5 Past experience details as per “Annexure-6” YES / NO
6 Performance certificates as per “Annexure-7” YES / NO
7 ANNEXURE – 8 YES / NO
8 ANNEXURE – 9 YES / NO
9 ANNEXURE – 10 YES / NO
10 ANNEXURE – 11 YES / NO
11 ANNEXURE – 12 YES / NO
12 Certificate of Important Instruction & certificate-A YES / NO
13 INTEGRITY PACT YES / NO
14 Schedule-“A” & Annexure-“A” (GSECL’s work/ Scope YES / NO
of work to be carried out by contractor specified duly
signed and with seal of firm.)
I / WE, confirm that following documents are attached with the technical
bid of the offer.
Signature of the
Seal of the Firm
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD
BE GIVEN FLAG MARKING FOR IDENTIFICATION.
EW-285 PUR-F-006 RFQ-
Subject: Work of cleaning & inside inspection of Deaerator during AOH/COH
or as & when required of Unit No 3, 4 & 5 at GTPS.
Reference: Tender No. EW-285
Due on date: / /
In connection with the above subject and reference I/ We confirm the
1. I / We, the under signed have read and examined the Scope of Work &
requirements during execution of work in tender mentioned under reference
along with the Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender
specifications/work.
3. Further, I / We also agree that additional conditions / deviations, if any,
found in the Commercial terms & conditions, our offer shall be out rightly
rejected without assigning any reason thereof.
4. We hereby agree for the terms & conditions laid down in Tender.
All the bidders are requested to see and verify the documents of
a) General safety rules / norms” to be observed by the contractors
b) Additional terms and conditions regarding industrial law and other
related matters for the tender documents.
c) General rules and directions for the guidance of contractor booklet of
GSECL, GTPS on our website under heading of “Rules for Works”
And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules,
Industrial Laws and Contract Booklet (a, b & c as above) and accordingly
submitted my/our offer.”
Signature of the
Representatives of the
Seal of the Firm
Name of the Tendering Firm / Agency:
EW-285 PUR-F-006 RFQ-
DETAILS OF THE FIRM
Tenderer may MANDATORILY fill all the details in this form.
(These details are necessary to create the database of Contractors)
Contractor Name
Within Gujarat / Outside Gujarat /GST
Pvt. Firm / Public Ltd. / State Govt. Under (Indicate the relevant status)
taking / Central Govt. undertaking
Vendor Registration Letter No. & Date
(If registered and Letter issued by Board) -
(If Applicable)
Vendor Registration Fee (If Applicable) Paid / Not Paid (Tick any one, for New
Vendor Registration Date (If Applicable) -
Vendor Registration Validity Period From Date___________ to Date___________
(If Applicable)
P.F NO (Also Physical Document is
required along with the Technical Bid)
PAN NUMBER (Also Physical Document is
required along with the Technical Bid)
Custom No. and Date (If applicable)
Electrical License Type(If Applicable) (Also
Physical Document is required along with
the Technical Bid)
License Validity Period (If Applicable) From Date___________ to Date___________
Account Number of Bidder
Type of Account of Bidder
Branch Name & Address
Contact Number of the Branch
Copy of Cancelled Cheque
COMPANY EMAIL ID FOR
CONFIRMATION OF PAYMENT
Address of Registered Office Factory Works Authorized
Contact person name
City & Pin code
Phone Nos.(Office)
Phone Nos.(Residence)
Web site address
EW-285 PUR-F-006 RFQ-
UN – PRICED SCHEDULE (COPY WITHOUT PRICES)
Description Quantity Unit
Cleaning of Deaerator & Its Storage Tank and inside
inspection, resetting, repairing of Nozzle & is perforated
1 trays if requires by cutting, welding/soldering as per
scope of work & instruction of EIC.
EW-285 PUR-F-006 RFQ-
Work Completion Period
EW-285 PUR-F-006 RFQ-
DETAILS OF THE EXPERIENCE FOR SIMILAR TYPE OF WORK AS PER
TENDER’S PRE-QUALIFICATION CRITERIA.
Party should submit below executed detailed work order physically along
with the Technical Bid. This is mandatory.
Sr. NAME ORDER DESCRIPTION ORDER ORDER STATUS, IF REMARKS
No OF REFERENCE OF WORK AMOUNT FULLY ORDER
WORK No. & DATE EXECUTED. UNDER
YES/NO EXECUTION
A GUJARAT STATE ELECTRICITY CORPORATION LTD /SISTER COMPANY.
B OTHER STATE ELECTRICITY BOARD
C OTHER ORGANISATION.
EW-285 PUR-F-006 RFQ-
LIST OF PERFORMANCE CERTIFICATES SUBMITTED WITH THE TECHNICAL
Party should submit below executed work performance certificate physically
along with the Technical Bid.
Sr. No. Name of the Authority by Reference No. & Details of Works
whom certificate is issued date
EW-285 PUR-F-006 RFQ-
ANNEXURE – 8 ( for Works )
Bidder must fill up below details & should place at the top of the Technical Bid.
1 PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2 TAX: [IN PERCENTAGE] ( GST )
3 The Last three-year Audited Annual Accounts, Positive
Net worth certificate, and Average Annual Turnover
certificate certified by charted accountant as Per
Qualification Requirement
4 Please quote your GST Registration No. (Also Physical
Document is required along with the Technical Bid)
5 Please quote your PF Registration No. & Date. (Also
Physical Document is required along with the Technical
6 PENALTY TERMS AGREED :
(Please Specify YES / NO.)
7 SECURITY TERMS AGREED:
(Please Specify YES / NO.)
8 DETAILS OF EMD PAYMENT (as applicable as below)
a) DD No & Date & Name of Bank
b) B.G. No. & Date & name of Bank
c) Cash details
9 Completion of Works
(Please Specify YES / NO.)
10 VALIDITY OF THE OFFER AGREED:
(Please Specify YES / NO.)
11 PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
12 WORK OFFERED AS PER SCHEDULE-B: (YES/NO)
13 TELEPHONE NOS. & FAX NO:
14 Authorized person of the firm :
15 Name of the proprietor, partners, directors [as the case
may be], along with address, telephone, fax no. etc.
16 If Vendor Registration is Done:(If Applicable)
(Please submit copy of Vendor Registration approval -
letter in the EMD cover).
EW-285 PUR-F-006 RFQ-
TECHNICAL DEVIATIONS IF ANY TO BE FURNISHED IN THIS ANNEXURE
ONLY AND TO BE SUBMITTED WITH TECHNICAL BID.
EW-285 PUR-F-006 RFQ-
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(Bidder should not quote their prices in this page)
Sub: Undertaking in regard to quoted prices.
All bidders will have to furnish the following undertaking duly filled in, signed and
“This is to certify that we have not worked for the subjected tender
viz.…………………. to other SEBs / Power Utilities with this tender details of
GSECL at lower % price than the % prices quoted in this tender by us for the
same item during last Six (6) Months.”
The prices quoted by us for the same item to other SEBs during the last six (6)
months are given below:
Signature of the Tenderer
Seal of the Firm
EW-285 PUR-F-006 RFQ-
ANNEXURE-10A (For Supply)
Vendor must fill up below details & should place at the top of the Technical
1. PRICES:[FIRMONLY]
(Please Specify YES/NO.)
2. Rates offered FOR:__________________
3. GST :[INPERCENTAGE]
(Please Specify IN/EXCLUSIVE/EXEMPTED)
Please quote your GST Registration No. &Date
Please specify GST NO
4. In case of GST(SGST,CGST OR IGST)please specify place
of Manufacturer unit from where material is to be supplied
5. PENALT YTERMS AGREED:
(Please Specify YES/NO.)
6. SECURITYTERMSAGREED:
(Please Specify YES/NO.)
7. P.G TERMS AGREED (Wherever applicable):
(P.G.-Performance Guarantee)(Please Specify YES/NO.)
8. DETAILS OF EMD PAYMENT
(Please Specify DD/BG/Pay order/ Valid SSI/Valid NSIC
No./Valid UDYAM/Valid KVIC/Valid MSME
9. DELIVERY TERMS AGREED:
(Please Specify YES/NO.)
10. VALIDITY OF THE OFFER AGREED:180 Days from the
date of opening of Technical Bid
11. PAYMENT TERMS AGREED: 80% against T.R.C. within
30days & balance 20% within 45 days
12. ITEMS OFFERED:
13. TELEPHONE NOS. & FAX NO:
14. Authorized person of the firm:
15. Name of the proprietor ,partners, directors [As the case
may be], along with address, telephone, fax no. e-Mail ID
Signature of Tenderer Company’s roundseal
EW-285 PUR-F-006 RFQ-
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING
/ BLACK LIST THEREOF).
Sub: Undertaking in regard to Stop Deal / Banned for Business dealing / Black
Ref: Tender No.:
signatory of M/S. ______________________________________ here by certify that M/S
__________________________________________ and their proprietor / any partner /
any directors of the firm is not stop deal and/or banned for business dealing
and/or black listed by GUVNL and/or their any subsidiary company viz.
GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
(Confirmed / not confirmed)
Contractor’s Signature
With Seal & Date
EW-285 PUR-F-006 RFQ-
Bidders must furnish the scan copy of below details along with technical
(1) A copy of order on hand.
(2) Detail order copies submitted as per Annexure-6.
(3) Performance Certificate if any.
(4) Documentary Proof for Partnership of proprietor, Partners, Directors (as the
case may be), along with Address, Telephone No, Fax No. etc. if any.
(5) The Last three-year Audited Annual Accounts, Positive Net worth certificate,
and Average Annual Turnover certificate certified by charted accountant as
Per Qualification Requirement.
(6) A copy of Goods and Service Tax Registration document along with valid
Registration Number as per Annexure –
(7) A copy of PF Registration document along with valid Registration Number as
(8) A valid B.G. against EMD or DD for the payment of EMD as per Annexure-8.
IMPORTANT INSTRUCTIONS
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in
accordance with the GSECL’s Work Tender specifications and as per Technical
detail work/ drawing as mentioned in the Tender Specifications. There is no
commercial or Technical deviation in the offer from the Corporation’s
Tender Specification. I undertake to abide by the GSECL’s tender description
and Particulars. I undertake to complete work strictly as per the GSECL’s
Technical specification/ Scope of work/ Guaranteed Technical Particulars /
Drawing, even if any technical deviations are mentioned by me. I also
undertake to abide by all commercial conditions of the GSECL, including work
completion schedule.”
(Signature of the Tenderer)
1. Any offer without above certificate will not be considered and the tender
will be out rightly ignored in the absence of above certificate.
2. After opening of the Tender, if it is found that the offer given by the
Tenderer is not according to the GSECL’s specifications, Guaranteed
Technical Specifications/ Scope of work, Drawing and commercial terms
and conditions and false certificate is given by the Tenderer, then GSECL
will not deal with the firm for the present Tender. It is, therefore requested
that the Tenderer should take care in giving their offer and submission of
3. The conditional tenders will not be accepted.
EW-285 PUR-F-006 RFQ-
[On Company's Letter Head]
(Required for price justification, if necessary)
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(All bidders will have to furnish the following undertaking duly filled in, for all
the quoted items/works of the tender along with online Technical Bid)
Ref.: Tender No: / Bid. No.:
We, the undersigned, hereby declare and undertake that we have not accepted
or executed any Letter of Acceptance (LOA) or Purchase Order (PO) at a unit ex-
works price/any work at rate lower than the rate offered in this tender in any
station of GSECL/GUVNL & Subsidiaries/CPSU/SPSU/IPP etc. during the
period from six (6) months prior to two (2) months after the bid submission date
of this tender.
We also understand that LOA / Purchase Order placed by any station of
GSECL/GUVNL Subsidiaries/CPSU/SPSU/IPP etc. on the basis of above
undertaking shall not be considered as ‘offered’ price for the tender items
in subsequent tender, if it is not within period mentioned above
I/ We accept above undertaking.
Seal of the firm Signature of the tenderer
With designation
EW-285 PUR-F-006 RFQ-
Gujarat State Electricity Corporation Ltd.
Thermal Power Station, GANDHINAGAR
(On Firm’s Letter Head)
ON FIRM’S LETTER HEAD:-
signatory of M/s. __________________________________ hereby certified that M/s.
______________________________________is not related with other firms who have
submitted tenders for the same work under this inquiry / tender and the
interest (i.e. Shareholding in company and share in partnership firm) of any
employee of the tendering Company or my/our relative as defined in section 2(77)
of the Company’s act. 2013 is 10% or more, the tendering Company will not deal
with such company/firm at all.
Also I /We declare that, I/We have not conflict of interest with other
bidders, as per below:
Conflict of interest among Bidders/Agents
A bidder shall not have conflict of interest with other bidders. Such conflict
of interest can lead to anti-competitive practices to the detriment of
Procuring Entity’s interests. The bidder found to have a conflict of interest
shall be disqualified. A bidder may be considered to have a conflict of
interest with one more parties in this bidding process, if :
a) they have proprietor/partner(s)/Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial
stake from any of them; or
c) they have the same legal representative/agent for purposes of this
d) they have relationship with each other, directly or through common
third parties, that puts them in a position to have access to
information about or influence on the of bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved. However,
this does not limit the inclusion of the components/sub-
assembly/assemblies from one bidding manufacturer in more than
f) in cases of agents quoting in offshore procurements, on behalf of
their principal manufacturers, one agent cannot represent two
manufacturers or quote on their behalf in a particular tender
enquiry. One manufacturer can also authorize only one
agent/dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent
on his behalf; and
EW-285 PUR-F-006 RFQ-
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract
that is the subject of the Bid;
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common
business ownership/management, only one unit should quote.
Similar restrictions would apply to closely related sister companies.
Bidders must proactively declare such sister/common
business/management units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of
competition act, as amended from time to time.
SIGNATURE OF THE TENDERER
WITH DESIGNATION.
SEAL OF THE FIRM:
EW-285 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED, BARODA
To, create an environment where Business Confidence is built through Best
Business Practices and in fostered in an atmosphere of trust and respect between
providers of goods and services and their users for the ultimate benefit of society
and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
■ To maintain the highest ethical ■ Not to bring pressure
standards in business and recommendations from outside GSECL
professions. to influence its decision.
■ Ensure maximum transparency ■ Not to use intimidation, threat
to the satisfaction of inducement or pressure of any kind on
stakeholders. GSECL or any of it’s employees under
any circumstances.
■ To ensure to fulfill the terms of ■ To be prompt and reasonable in
agreement / contract and to fulfilling the contract, agreement, legal
consider objectively the viewpoint obligations.
■ To ensure regular and timely ■ To provide goods and/or services
release of payments on due dates timely as per agreed quality and
for work done. specifications at minimum cost to
■ To ensure that no improper ■ To abide by the general discipline to be
demand is made by employees or maintained in our dealings.
by anyone on our behalf.
■ To give maximum possible ■ To be true and honest in furnishing
assistance to all the Vendors / information.
Suppliers/ Service Provider and
other to enable them to complete
the contract in time.
■ To provide all information to ■ Not to divulge any information,
suppliers/contractors relating to business details available during the
contract/job which facilitate him course of business relationship to
to complete the contract/job others without the written consent of
successfully in time. GSECL.
■ To ensure minimum hurdles to ■ Not to enter into carter/syndicate/
vendors/suppliers/contractors in understanding whether formal/non-
completion of agreement/ formal so as to influence the price.
contract/ work order.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
EW-285 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED.
TPS: GANDHINAGAR.
Work of cleaning & inside inspection of Deaerator during AOH/COH
or as & When Required of Unit No 3, 4 & 5 at GTPS.
1. Opening of Deaerator and its storage tank manholes.
2. Cleaning of Deaerator and its storage tank.
3. Inspection of Deaerator from inside, checking spays nozzles, repairing /
replacement of spray nozzles if any.
4. Checking of perforated trays & repairing of the same by cutting, welding or
5. Replacement of gasket joint of manholes.
6. Final inspection & Refitting of Heavy Manhole with full tightening of studs & nuts.
7. Party has to carry out all kind of works of Dearator as per instruction of EIC.
8. Charging of Deaerator and its storage tank to check any leakage & if found any
defect same is to be attended by contractor free of charge.
FOLLOWING ARRANGEMENTS ARE TO BE CARRIED OUT BY CONTRACTOR:
All kind of tools and tackles, consumables, ordinary welding/soldering electrodes,
cutting and welding machine with equipments (if required) along with oxyacetylene
gas as per requirement. All brazing and patch work facility as per requirement with
All kind of consumable like grease, rustolin, emery paper, cotton waste, etc and
debris collection arrangement etc.
All kind of manpower with all respect and their transportation to site as well as for
material transportation.
Party shall have to arrange necessary scaffolding if required.
Party shall have to arrange welder to execute the welding/soldering work at his own
FOLLOWING ARRANGEMENTS SHALL BE PROVIDED BY GSECL
Air and electricity. Work shop facility for rectification / repair works.
Open space for material storage in plant.
Electrical Connection will be provided by GSECL from single point for lighting at
free of cost and further extension shall have to arrange by the contractor on their
own cost. Three phase supply connection will be provided to contractor’s
equipments/tools by GSECL free of cost at location decided by Engineer in Charge.
ICTP switches and ELCBs shall have arranged by the contractor at their own cost.
Following facilities will be provided by GSECL on CHARGEABLE BASIS.
Accommodation (Hostel / Quarter) facility will be provided on chargeable basis if
Medical facility will be provided on chargeable basis as per GSECL norms during
the execution of this works if available.
EW-285 PUR-F-006 RFQ-
GENERAL TERMS & CONDITIONS:
1. Work is to be carried out at Powerhouse Premises.
2. The work should be commenced after isolation of Deaerator.
3. If leakage will persist after completion of job, contractor shall have to re-work
without additional cost; otherwise the same will be attended by GSECL at the risk &
cost of contractor.
4. Loading, Unloading and Transportation of material from GTPS to party’s works and
vice versa is to be arranged by the party at their own cost. GSECL will provide
necessary crane facility for Loading and unloading at GSECL premises.
5. Party will be fully responsible for any loss/damage to the materials provided by
GSECL. The cost of loss/damage/shortage, if any will be recovered from the party’s
6. Welding/soldering Electrodes for welding is to be utilized as per Parent Metal after
Testing Parent Metal and report thereof shall be submitted to GSECL.
7. GSECL will provide special tools if required, jointing/packing materials and fasteners
at free of cost. Rest of the material, welding/soldering electrodes, consumables,
tools & tackles, jigs & fixtures, machineries, etc. for above work are to be arranged
by the party at their own cost.
8. After completion of work, contractor has to credit scrap materials at main store as
per instruction of EIC.
9. Contractor has to handle the GSECL equipment / tools / tackles carefully otherwise
the cost of damage / shortage will be recovered from the party’s bill.
10. Contractor has to follow all labour laws and safety rules as per GSECL procedure.
11. Contractor has to appoint supervisor to supervise the work and to follow the
instruction given by GSECL on round the clock basis.
12. Contractor shall have to mobilize their manpower within 3 days after instruction of
EIC, if fail the same penalty will be imposed Rs. 500/day.
13. During AOH/COH of units, contractors shall have to attend daily meeting as per time
fixed by EIC. Penalty will be imposed Rs. 100, if found absent of the supervisor
during daily meeting.
14. Contractor shall have to submit daily progress report for work carried out during
15. Contractor shall have to mobilize their manpower within immediately after instruction
of EIC. GSECL will complete the work by deputing other agencies if the progress/
quality of works are not found satisfactory at the risk and cost of contractor.
16. Payment will be made as per actual work done only.
17. No price escalation will be entitled.
18. Time Limit:
a. Time Limit for completion of one job is 10 Days from the date of commencement
b. The validity of this work order is 24 months from the date of commencement by
mail / telephonically for the work.
19. Time Limit Extension: This contract can be extended further for a period of
weeks or till finalization of new contract whichever is earlier. If this contract is
extended beyond time limit, the contractor shall have to work in extended period till
finalization of new contract and during such extended period the rates will be
payable at the existing contract rate or new rate whichever is less.
EW-285 PUR-F-006 RFQ-
20. Penalty for Delay: If the work is not done as per specification given by the
Corporation in stipulated time in all respects, the penalty will be levied as per
Corporation's rules.
Any delay that may take place in supply and / or erection, testing and
commissioning activities beyond contractual cutoff date / stipulated period in the
order shall be subjected to penalty (not liquidated damages) at the rate ½ % of the
contract price / order price per week or part thereof subjected to a maximum of 10%
of the total contract value/ order value (i.e. End cost including GST).
21. Payment Terms: Payment shall be made as per the actual work carried out. The
measurement of work will be carried out jointly.
22. Mobilization: Party shall mobilize site i.e. the manpower, machines, materials, etc.
within 3 days from the intimation given by GSECL by telephonically, mail or by letter
for mobilization of site.
23. The GSECL reserve the right to carry out the work by another agency in case of
poor /slow progress of the work and expense incurred will be recovered from the
24. Performance Guarantee: The contractor has to give performance guarantee for
towards defect free operation & poor workmanship Three month from the date of
commissioning. If any defect observed within Three Month contractor shall have to
attend it free of cost.
25. Unsatisfactory Progress of Work: The GSECL reserve the right to carry out the
work by another agency in case of poor /slow progress of the work and expense
incurred will be recovered from the party’s bill.
26. Taxes: Any prevailing Tax at the time of execution of work shall be borne by the
contractor. Income Tax at the applicable rate shall be deducted from the RA Bill.
27. Contractor shall have to execute Agreement on stamp paper of Rs. 300/- and
Indemnity bond on stamp paper of Rs. 300/- in the prescribed form before
commencement of the work. The cost of the stamp papers shall be borne by
28. Contractor has to follow all labour laws and safety rules as per GSECL procedure.
29. No extra charge or Price escalation will be given during completion of Time Limit of
30. The corporation reserves the right to carry out this work by other agency in case of
poor/slow progress of the work and expanse incurred will be recovered from the
31. Corporation’s General Terms and Conditions are also applicable to this work.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-285 PUR-F-006 RFQ-
ON STAMP PAPER OF Rs.300/-]
EMD BANK GUARANTEE FORMAT
FOR TENDER NO.__________
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Address of the Firm/company) having their registered Office at
________________________________(Address of the Firm’s registered Office)
(hereinafter called the “Tenderer”) wish to participate in the Tender
No._______________ for _________work (Supply / Erection / Supply & Erection
Work, etc.) of ______________________ (Name of the Material/equipment / work)
for Gujarat State Electricity Corporation Limited (hereinafter called the
“Beneficiary”) and WHEREAS a Bank Guarantee for Rs._____________
(Amount of Bank Guarantee towards EMD) valid till ____________ (mention
here date of validity of this Guarantee which will be Six months from the date
of submission of bid of the tender) which is required to be submitted by the
Tenderer along with the Tender.
address of the Branch giving the Bank Guarantee) having our registered
Office at _____________________ (Address of Bank’s registered Office)
hereby give this Bank Guarantee No. _________________ dated ____________
and hereby agree unequivocally and unconditionally to pay immediately
on demand in writing from Beneficiary Gujarat State Electricity
Corporation Limited or any Officer authorized by it in this behalf any
amount up to and not exceeding Rs.____________(Amount of E.M.D.),
the said Gujarat State Electricity Corporation Limited on behalf of the
agree that withdrawal of the Tender/Bid/EOI or part thereof by the Tenderer
within its validity or Non submission of Performance Guarantee towards
execution/supply period by the Tenderer within 15 days from the date of
issue of Letter of Acceptance by the Gujarat State Electricity Corporation
Limited would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked & encashed within its validity by
the Beneficiary in case of any occurrence of a default on the part of the
Tenderer and that the encashed amount is liable to be forfeited by the
This agreement shall be valid and binding on this Bank up to and
inclusive of _______________ (mention here the date of validity of Bank
Guarantee) and shall not be terminable by notice or by Guarantor for change
in the constitution of the Bank or the Firm of Tenderer or by any
reason whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alterations made,
given, conceded with or without our knowledge or consent by or
between the Tenderer and the Gujarat State Electricity Corporation
Notwithstanding anything contrary contained in any law for the time being in
force or banking practice, this Guarantee shall not be assignable, transferable
by the Beneficiary (i.e. GSECL) Notice or invocation by any person such as
assignee, transferee or agent of beneficiary shall not be entertained by the
EW-285 PUR-F-006 RFQ-
Bank. Any invocation of the Guarantee can be made only by the beneficiary
NOTWITHSTANDING anything contained hereinbefore our liability under
this Guarantee is restricted to Rs.__________(Amount of EMD) (Rupees
__________________________________) (in words). Our Guarantee shall remain in
force till _____________ (Date of validity of the Guarantee). Unless demands or
claims under this Bank Guarantee are made to us in writing on or before
___________ (Date of validity of the Bank Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released
and discharged from all liabilities there under.
Please Mention here Complete Postal Signature of the Bank’s
Address of the Bank with Branch Code, Authorised Signatory with
Telephone and Fax Nos Official Round seal
NAME OF DESIGNATED BANKS : As per Annexure – I
EW-285 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards execution/supply period (
Security Deposit ) as per Commercial Terms & Conditions of Tender)
Address of the Branch giving the Bank Guarantee) having our registered Office at
Bank’s registered office) hereby give this Bank Guarantee No.
unequivocally and unconditionally to pay immediately on demand in writing
from the Gujarat State Electricity Corporation Limited, or any Officer
authorized by it in this behalf any amount up to and not exceeding Rs.
_____________ (Amount of Performance Guarantee towards execution/supply
period ) Rupees
the said Gujarat State Electricity Corporation Limited on behalf of
contract for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and
inclusive of___________________(Date of validity of the Bank Guarantee) and shall
not be terminable by notice or by change in the constitution of the Bank
or the firm of Contractors / Suppliers or by any other reason whatsoever
and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given conceded or agreed,
with or without our knowledge or consent, by or between parties to the said within
written contract.
“Notwithstanding anything contrary contained in any law for the time being in
force or banking practice, this Guarantee shall not be assignable, transferable by
the beneficiary (i.e. GSECL). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the Guarantee can be made only by the beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________(Rupees
___________________________________________only). Our guarantee shall remain in
force until _______________ (date of validity of the Bank Guarantee).Unless
demands or claims under this Bank Guarantee are made to us in writing on or
before _____________ (Date of validity of the Bank Guarantee), all rights of
Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure - I
EW-285 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards Guarantee/Warranty period as
per Commercial Terms & Conditions of Tender)
Address of the Branch giving the Bank Guarantee) having our registered Office at
Bank’s registered office) hereby give this Bank Guarantee No.
unequivocally and unconditionally to pay immediately on demand in writing
from the Gujarat State Electricity Corporation Limited, or any Officer
authorized by it in this behalf any amount up to and not exceeding Rs.
_____________ (Amount of Performance Guarantee towards Guarantee/Warranty
period ) Rupees
the said Gujarat State Electricity Corporation Limited on behalf of
contract for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and
inclusive of___________________(Date of validity of the Bank Guarantee) and shall
not be terminable by notice or by change in the constitution of the Bank
or the firm of Contractors / Suppliers or by any other reason whatsoever
and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given conceded or agreed,
with or without our knowledge or consent, by or between parties to the said within
written contract.
“Notwithstanding anything contrary contained in any law for the time being in
force or banking practice, this Guarantee shall not be assignable, transferable by
the beneficiary (i.e. GSECL). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the Guarantee can be made only by the beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________(Rupees
___________________________________________only). Our guarantee shall remain in
force until _______________ (date of validity of the Bank Guarantee).Unless
demands or claims under this Bank Guarantee are made to us in writing on or
before _____________ (Date of validity of the Bank Guarantee), all rights of
Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s
Postal Address of the Bank authorized
with Branch Code, Telephone signatory with Official Round
and Fax Nos. Seal.
NAME OF DESIGNATED BANKS : As per Annexure – I.
EW-285 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(Combined Performance Guarantees (PBG) towards Execution/Supply period
and Guarantee/Warranty period as per Commercial Terms & Conditions of
Address of the Branch giving the Bank Guarantee) having our registered Office at
Bank’s registered office) hereby give this Bank Guarantee No.
unequivocally and unconditionally to pay immediately on demand in writing
from the Gujarat State Electricity Corporation Limited, or any Officer
authorized by it in this behalf any amount up to and not exceeding Rs.
_____________ (Amount of Combined Performance Guarantees (PBG) towards
Execution/Supply period and Guarantee/Warranty period) Rupees
said Gujarat State Electricity Corporation Limited on behalf of
contract for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and
inclusive of___________________(Date of validity of the Bank Guarantee) and shall
not be terminable by notice or by change in the constitution of the Bank
or the firm of Contractors / Suppliers or by any other reason whatsoever
and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given conceded or agreed,
with or without our knowledge or consent, by or between parties to the said within
written contract.
“Notwithstanding anything contrary contained in any law for the time being in
force or banking practice, this Guarantee shall not be assignable, transferable by
the beneficiary (i.e. GSECL). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the Guarantee can be made only by the beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________(Rupees
___________________________________________only). Our guarantee shall remain in
force until _______________ (date of validity of the Bank Guarantee).Unless
demands or claims under this Bank Guarantee are made to us in writing on or
before _____________ (Date of validity of the Bank Guarantee), all rights of
Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under:
Please mention here Signature of the Bank’s
complete Postal Address of authorized
the Bank with Branch Code, signatory with Official Round
Telephone and Fax Nos. Seal.
NAME OF DESIGNATED BANKS : As per Annexure - I.
EW-285 PUR-F-006 RFQ-
Financial Department, GR.No. FD/MSM/e-file/04/2025/2712/DMO Dtd.
[ To be revised as per GoG notification issued from time to time.]
List of Banks Notified by GSECL
(A) Guarantees issued by following banks will be accepted as SD/EMD on
permanent basis.
All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for
period up to March 31, 2027. The validity cut-off date in the GR is with
respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
Name of Banks Name of Banks
1 AXIS Bank 23 A U Small Finance Bank
2 Bandhan Bank 24 City Union Bank
3 CSB Bank 25 DBS Bank India Limited
4 DCB Bank 26 Dhanlaxmi Bank
5 Equitas Small Finance
6 HDFC Bank 28 HSBC Bank
7 ICICI Bank 29 IDBI Bank
8 IDFC First Bank 30 Induslnd Bank
9 Jammu and Kashmir Bank 31 Jana Small Finance Bank
10 Karnataka Bank 32 Karur Vysya Bank
11 Kotak Mahindra Bank 33 RBL Bank
12 South Indian Bank 34 Standard Charter Bank
13 Tamilnadu Mercantile Bank 35 Ujjivan Small Finance Bank
14 36 Ahmedabad Mercantile Co-
15 Nutan Nagrik Sahakari 37 Rajkot Nagrik Sahakari Bank
Bank Ltd. Limited.
16 Sarswat Co-Operative Bank
SBPP Co-operative Bank Ltd.
17 SVC Co-Operative Bank
The Cosmos Co-op Bank Ltd.
18 The Gujarat State Co- 40 The Surat District Co-operative
Operative Bank Bank
19 The Surat Peoples Co- 41 The Baroda Central Co-operative
operative Bank Ltd. Bank
20 The Panchmahal District 42 The Kalupur Commercial Co-
Co-operative Bank operative Bank
21 The Rajkot Commercial Co- 43 The Banaskantha Mercantile Co-
operative Bank Limited Operative Bank Ltd.
22 Gujarat Gramin Bank
EW-285 PUR-F-006 RFQ-
GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited
Factory like Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly
observe the following Safety Rules. Concern principle contractors are responsible for
informing & observance of these rules by their supervisors/contract workers as well
as the owner/supervisors/ workers of sub-Contractors engaged, if any, by them for
the work contract awarded to them. Prior to commencement of the work, Contractor
shall have to submit a written assurance on their letterhead to the concerned
Sectional Head / Engineer-in-charge that they have thoroughly gone through these
Rules, have educated their employees / workers of their sub contractor and will
strictly observe the said Rules while execution of work under work contract
awarded to them. They will have to indemnify the company for any loss or damage /
accident / injury to the company’s property / employee or employee of their own in
default of non - observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL Factory
Manager as per Gujarat Factories rules, 1963 & details shall be filled up in
GSECL gate pass format as per Aadhar card /Election card id proof & to follow
the gate pass issue procedure through concern department EE & SE, Security
Officer, LWO/IRO/DGM, Factory Medical Officer, Safety Officer/Dy. Safety
Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security
Officer only for three days with prior permission of Factory Manager only.
More than three days, Permanent photo gate pass procedure shall be
completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in
form no.33 of Gujarat Factories rules, 1963 shall be issued by GSECL Factory
Medical Officer for all contractor workers before commencement of work &
examination responsibility shall be taken by contractor as well as concerned
Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory
Medical Officer after every six (06) months of contractor with their contractor
workers. Contractor shall be fulfilled all health requirements before
commencement of work. After completion of medical examination in form
no.32/33, GSECL Factory Medical Officer shall be signed in contract worker
gate pass procedure format.
(04) If work executed outside factory premises, Principle Contractor shall be
registered compulsory under The Building & Other Construction Workers
(Regulation of Employment and condition of service) Act, 1996 and The
Gujarat Building & Other Construction Workers (Regulation of Employment
and condition of service) Rules, 2003 before execution the ”building or other
construction work” means the construction, alteration, repairs, maintenance
or demolition, of or, in relation to, buildings, streets, roads, railways,
tramways, airfields, irrigation, drainage, embankment and navigation works,
flood control works (including storm water drainage works), generation,
transmission and distribution of power, water works (including channels for
distribution of water), oil and gas installations, electric lines, wireless, radio,
television, telephone, telegraph and overseas communications, dams, canals,
reservoirs, watercourses, tunnels, bridges, viaducts, aqueducts, pipelines,
towers, cooling towers, transmission towers and such other work as may be
specified in this behalf by the appropriate Government, by notification but
does not include any building or other construction work to which the
provisions of the Factories Act, 1948 (63 of 1948), or the Mines Act, 1952 (35
of 1952), apply.
(05) Contract worker gate pass will issue after completion of safety induction 3D
animation movie & Training record is to be maintained in IMS/OHSAS
training format by TK Office/LWO.
EW-285 PUR-F-006 RFQ-
(06) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be
checked the issue PPE to contract workers as per nature of job, Form no.10 of
lifting tools and tackles, Driving license, Electrical contractor license,
Electrical trade qualifications, Safety induction training, SOP, supervisor
qualifications etc. After fulfillment of all Safety compliances, Safety Officer/Dy.
Safety Officer shall be signed in Contract worker Gate pass procedure format.
(07) Work Contract shall be completed by principle contractor/agency/person who
is awarded the work order. Subletting of contract shall be allowed only if prior
approval of Power station chief before execution of work. Contractor/agency
shall be submitted the entire subletting contract documents with gate pass
application through concern department EE & SE, LWO/DGM, Safety
Officer/Dy.Safety Officer & Factory Manager.
(08) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
1956, Valid Electrical contractor License shall be submitted to concern
electrical department EE/SE/Electrical Safety Officer/ Safety Officer/Factory
Manager at the time of apply gate pass by agency/party with latest renewal
from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical License
photocopy shall be checked by Concerned HOD of Electrical
Department/Electrical Safety Officer/Dy.Safety Officer/ Safety Officer/Factory
(09) As per nature of job/work, Qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be
engaged by contract agency & qualification certificate with experience
certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/ Dy. Safety
Officer /Safety Officer/Factory Manager at the time of apply gate pass.
(10) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and
carry out the work on electrical lines and Apparatus, Contract
person/worker possesses a certificate of competency or electrical work permit,
issued by the Appropriate Government. That means, Electrical trade
Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma
(Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted to
concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory
Manager at the time of apply for photo gate pass procedure.
(11) As per nature of job/work & during capital overhauling work /Annual
overhauling work /24X7 round the clock work/major shut down work,
Qualified Safety Officer/Manager/Supervisor (BE/Diploma (Elect/Mech/Civil)
+ PDIS-Post Diploma in Industrial Safety) shall be engaged by contractor
during dangerous operations/dangerous works as well as day to day
dangerous activities, safety supervision, tool box talk, Safety awareness
programme, SOP preparation with hazards & its control measures with each
step , checking of lifting tools & tackles, hydra mobile crane, Safety
precautions, coordination with Safety Department etc.
(12) License of driver shall be submitted with gate pass issue application as per
nature of vehicles & to follow the Motor vehicle Act,1988,the Central Motor
Vehicles (Amendment) Rules,2016 as well as Gujarat Motor Vehicles
rules,1989 & driver license shall be checked every day by security shift in
charge before entry in the Factory premises.
(13) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through
competent person as per GFR, 1963 or Qualified Safety Officer as per GFR,
1963 with 05 years experiences. SOP will review & approve by concern
JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety Officer/Factory
Manager before execution of work.
(14) It is compulsory to use standard make Personal Protective Equipments
(P.P.Es.) as per the job requirement. Do not work without use of required
P.P.Es. Contractor is responsible to provide standard make
(ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE
issue format by concern JE/DE/EE/SE/Safety Officer/Factory Manager.
Personal Protective Equipments / Safety Gadgets suitable to give sufficient
EW-285 PUR-F-006 RFQ-
protection against hazards involved in their work / job to their staff, as per the
job requirement and insist / enforce their workers to put on the same while at
The ongoing work is liable to be stopped at any time if your contract
workers/staffs found working without P.P.Es. Following is the list of various
P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved only) to be used for various
works / worksites.
In any work, Contractor shall be issued the minimum 06 nos. of PPEs like
Safety Shoes, Safety Helmet, Safety goggles, Mask & Reusable Ear plug, hand
gloves to their workers/supervisor compulsory & it will check by concern
section HOD & Dy. Safety Officer /Safety Officer at the time of gate pass
Quality of PPE shall be approved from Safety Officer as per Indian Standard
and International Standard before executions of work or at the time of gate
pass apply procedure.
List of safety equipments
Industrial Safety Helmet For protection of head against falling objects or
during fall of person from height. Yellow Colour
helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/ chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working in
muffs. high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils,
sharp edged objects, heat, hot metals/objects,
electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects,
with sharp edged objects, heat, hot metals/objects,
Oil/Chemical/water/heat/ electricity etc..
Electrical resistance etc.
Safety Belt(full body For fall prevention while working at heights or in
hardness with double depth, working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space
respirators with full face area
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
EW-285 PUR-F-006 RFQ-
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from
(one) feet distance before starting the any electrical
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding
EN 12941:1998, class TH2 visor to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter
which removes particles from the air. The unit
provides a constant airflow independent of filter
combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The
unit supplies air to the head top via the connecting
breathing tube. The airflow creates a slight positive
pressure which together with the sealing to the face
prevents particles and other contaminants from
entering the head top.
(15) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and
allotment of PPE list shall be submitted to Safety Officer, Dhuvaran on his
letter head as per below mentioned format by Contractor before
commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Desi Name of Name of PPE IS Make Qt Unit Date Rec
no. of gnati Section :Code of PPE y of eivi
worke on under no. of issue ng
rs work PPE sign
Reusable Ear Pair
Safety Shoes Pair
(16) Shift Security Inspector/Security Officer shall be checked Safety Shoes &
Safety Helmet of all contractor workers at entry gate of Factory Premises &
shall entered contractor workers with Safety Shoes & Safety Helmet with
photo ID Gate Pass.
(17) Shift Security Inspector/Security Officer shall be checked validity of Gate
pass of all contractor workers on daily basis.
(18) During the work execution, one trained & competent supervisor of agency
should always remain present at work site. Concern JE/DE of GSECL shall
be supervised the contract work as per SOP .
(19) Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/ C&I/Environment survey/Chemical etc
EW-285 PUR-F-006 RFQ-
measuring /testing equipments/instruments which are used during contract
work shall be submitted before starting the work & shall be checked by
concern JE/DE/EE before starting work & it’s record shall be maintained in
concern section.
(20) The contractor shall take all the required safety measures prior to
commencement of work on dangerous substances, machineries or area at
which cautionary notice is displayed and obtain “Line Clear” or “Work
Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of
(21) Safety talk/Safety work instructions shall be given to contractor workers by
concern JE/DE regarding hazards of specific work, risk & it’s control
measure (mentioned in HIRA) before starting the job work and records shall
be maintained for each & every job works.
(22) Display Safety instructions shall be strictly followed by all workers who are
working in factory premises.
(23) Material Safety Data Sheet (MSDS) of each chemical shall be available with
Chief Chemist/Control room & work related Chemical information shall be
taken by contractor & contractor workers from Concern EE/Chief Chemist
before starting of chemical handling work.
(24) The contractor shall be checked & securely covered or securely fenced any
opened fixed vessel, sump, tank, pit or opening in ground or in floor which,
by reason of its depth, situation, construction or contents ,is or may be a
source of danger before starting the work each & every days or after
interval/recess. Contractor supervisor shall be informed to concerned HOD
regarding any unsafe conditions.
(25) Prohibition of smoking, fires, lights, spontaneous ignition substance,
matches; fuses, mobile phone etc are to be strictly followed by all workers
who are working in factory premises.
(26) Prior to carrying out welding, gas cutting, furnace heating or any other hot
work job, remove all the inflammable material lying at or nearby worksite or
cover it properly by suitable protective covering. Also, special care shall be
taken before carrying out such job & see that all possible contributing factors
to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to
commence the work in fire prone areas. They should also keep ready all the
First Aid Fire Extinguishers / equipments & fire extinguishing media /
material like sand / water buckets or other appropriate equipment at such
(27) While carrying out work in confined space or inside vessel, obtain necessary
“Confined Space / Vessel Entry Permit” from concerned department prior
to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard)
hand lamp shall be used. For taking care of the persons working inside the
confined space / vessel, a supervisor / person capable to keep continuous
watch on person(s) working inside, assist them in case of emergency or
arrange to get immediate outside help, shall remain present at entry point.
Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders
/ entrants / passers etc shall remain available near entry point or the entry
point shall be cordoned by a barricaded tape with a cautionary notice. After
completion of the works, all the lids / covers / grills / grits opened, shall be
re-fixed / re-placed in the original position as it were prior to commencement
of the work and leave the work place in safe condition in all respect, so as to
prevent accident to fellow workers.
(28) The contractor shall see that he / his persons do not work on or block (by
stacking material, spare parts, tools-tackles, equipments etc), any passages /
walkways / gangways / aisles / staircases / ladders / lifts or any other
EW-285 PUR-F-006 RFQ-
approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost
necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using
barricading tape & display suitable caution notice or keep a person to restrict
/ divert the traffic on this route through other safe passage.
(29) The contractor shall see that he / his persons do not work on or block (by
stacking material, spare parts, tools-tackles, equipments etc), any passages /
walkways / gangways / aisles / staircases / ladders / lifts or any other
approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost
necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using
barricading tape & display suitable caution notice or keep a person to restrict
/ divert the traffic on this route through other safe passage.
(30) Prior to use power / electrically operated hand tools / equipments /
machines / gadgets like welding machine, hand grinder, hand drill etc,
ensure for its safe operation & use it only if it is found safe to use. Do not use
defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be
taken directly at their own but shall be obtained through concerned
Electrical Maintenance Departments or their authorized persons or under
their observations / guidance only. The Electrical Section shall provide
temporary electrical connection up to contractor’s Mains Board on which it is
compulsory to install mains switch, ELCB & fuses of adequate capacity. All
such equipments shall invariably be earthed adequately to prevent electrical
shock, sparking, short circuit etc. Power cord to be used shall be of adequate
capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire
power cord for three phase power connections. The plugs, receptacles, pins,
holders etc shall be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine,
cutting machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc
required to be used during work execution shall be of standard make & bear
ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which
has specific prescribed life span shall not be used in any case if its expiry
(31) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used
by Electrical contractor for safe use in areas where hazardous, flammable, or
combustible vapors, liquids, dusts, or residues may be present in Gas Based
power plant and list of tools and tackles shall be submitted with technical
bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be
checked by JE/DE before commencement of Electrical work.
(32) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch,
forklift, mobile crane, EOT crane etc) & its attachments (like D-shackles,
slings, U-clamps, Eye bolts or any fixtures), it shall be checked and used only
if found safe to use. Also, ensure that these are tested, examined & certified
in form no.10 by Competent Person as per the Factory act-1948 & Gujarat
Factories Rules and its validity do not expire. Further, it shall be fixed
properly and firmly prior to lifting the weight. Valid Test certificate of all
Lifting machines used by Contractor to be submitted to Dy.Safety
Officer/ Safety Officer before commencement of work through concerned
EW-285 PUR-F-006 RFQ-
(33) Metal Scaffoldings to be used for working at height shall be of adequate size
& capacity. Obtain the work permit when working at height. While climbing
on such scaffolding or working on any structure at height, use of full body
safety belt /full body hardness with double lanyard & Fall arrestor & Helmet
is compulsory. It is also necessary to fasten chinstraps of the helmet.
(34) Contractor or their employee shall not interfere in day-to-day routine plant
activities / works except the work assigned to them, shall not loiter in the
areas other than their work jurisdiction, as well as shall not temper / operate
/ touch the machineries/equipments/auxiliaries with which they are not
concerned. Also, the contractor shall strictly instruct their staff for not to sit
or take rest at/near/below running plants, auxiliaries, systems or any place
which is risky, hazardous & prone to accident.
(35) The cylinders containing poisonous / toxic or inflammable / explosive gas
like Oxygen, Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be
handled safely taking due care. To handle / shift such cylinders a special
trolley /cage meant for it must be used but in no case it should be rolled.
(36) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-
vapour generated area, Spark arrestor (as per approved manufacturer of
CCOE, Nagpur) shall be provided on each vehicle by party/agency and it will
check by shift security in charge before entry of vehicles in the factory
(37) No women or young person shall be employed or permitted to work in Lead-
compound area like battery room etc. as per schedule VI of GFR
(38) No women or young person shall be allowed to clean, lubricate or adjust any
part of a prime mover or of any transmission machinery while the prime
mover or transmission machinery is in motion. Examination or operation of
motion machinery shall be made or carried out only by a specially trained
adult male worker wearing tight fitting clothing as per section 22 of factories
(39) In all risky job, before start the work, contractor should obtain General
Safety Work Permit through concerned section from Shift –in-charge well in
(40) In case of noticing smoke or fire during their work execution, they shall make
immediate efforts to extinguish / control it and simultaneously inform the
Fire Station Mobile No as well as Station Fire Officer or Emergency Control
room no which is displayed at prominent place of factory like Main Security
Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station,
All security gates, Occupational Health Centre.
(41) In case of any injury / accident while working, it shall immediately be
reported to Safety Department through concerned Sectional Head / Engineer.
The prescribed Form No. 21 & ANNEXURE may be obtained from concerned
section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to
Electrical Safety Officer through concern Sectional Head / Engineer. The
prescribed Electrical accident form no. A as per electricity act-2003 &
Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be filled up
by concern department JE/DE with written consent of contractor. The Form
may be obtained from concerned Electrical section or Electrical Safety
Officer. Electrical accident investigation shall be carried out by Electrical
Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness
certificate of injured person with endorsement of GSECL factory Medical
Officer to LWO/Dy.Safety Officer/Safety Officer/Electrical Safety Officer then
after injured person may allow for work.
(42) For any incident occurred but have no injury to any persons should also
reported as per GSECL format and informed to Dy.Safety Officer/Safety
Officer as Near Miss Incident.
EW-285 PUR-F-006 RFQ-
(43) Safety penalty shall be imposed against Offences by contract workers: If
any contract worker worked in a factory contravenes any provision of
Factories act or any rules or orders made there under ,imposing any duty or
liability on workers, contractor/agency shall be punishable with fine which
mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at Rs.1000/- per day
height, confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not Rs.750/- per person
(iv) Welding work without flashback arrestor/double Rs.1000/- per set
gauge regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature Rs.1000/-per day
of job like mechanical, electrical, civil, C&I,
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / Rs.2000/- per
tackles (like C.P.Bs., Hook chooks, winch, forklift, equipment
mobile crane, EOT crane etc) & its attachments
(like D-shackles, slings, U-clamps, Eye bolts or
any fixtures) in Form No.10 of Gujarat Factories
(ix) Work without Double lynyer Safety belt during Rs.3000/-per person
working at Height work, work without anchoring
in hook/line line
(x) Work without 24 Volt supply in Confine space Rs.3000/-per person
(xi) (a) Grinding machine used without safety Rs.500/-per
guard/machine guard equipment / per set
(b) unsafe welding machine like open body, Knob
without insulation, connection without lug
(c) damaged welding cables/gas pipelines
(d) welding work doing without welding blanket,
(e) electrical supply without 3 pin plug/Industrial
(f) use of damaged electrical wire for lighting/
(g) use of lighting lamp without cage,
(h) use of open halogen tube,
(i) use of damaged PPEs/use of non Standard
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB, etc.
During plant visit/supervision of concern JE/DE/EE, SE, Safety Officer/Dy.Safety
Officer, Electrical Safety Officer, Factory Manager, If they will observed any
safety violations as per CO circular/statutory requirements then they must
impose Safety Penalty through office note directly against contract workers/
contract agency and Office Note process through proper channel to concern
Sectional head and Account head for recovery purpose. Photograph/CCTV
footage is to be put up with penalty note by imposing officer.”
EW-285 PUR-F-006 RFQ-
(44) Party will damage any fire equipments or property or machinery in factory
during execution of work, total damage cost will be recovered from party RA
bill and recovery Office note put up by concern HOD.
(45) All the relevant labour and industrial laws shall also be followed
(46) After completion of work, cotton waste, grease, oil, unused material, welding
rod pieces, scrap etc. are to be removed by contractor and scrap shall be
deposited to scrap yard of Main Store.
(47) For performance evaluation of contractor, safety factors of work accident, fire
incident & near miss accident will be considered. Steps can be taken to
review the job assignment up to cancellation for negligence.
(48) Over & above these, contractor shall have to follow all the safety
requirements /rules & regulations / norms and legal provisions laid down in
various statutes. Particularly the provisions of The Factories Act-1948 & the
Gujarat State Factories Rules-1963 (Amended up to date), The Electricity
Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor
shall also obey the rules / regulations / instructions of the local Competent
Authority for safety & health requirements.
(49) The above rules shall be scrupulously followed and where required,
Contractor /contractor workers may contact to the Dy.Safety Officer/Safety
Officer/Electrical Safety Officer in case of any ambiguity or needs further
guidance in this regard.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-285 PUR-F-006 RFQ-
Terms and Conditions regarding Labour Laws
During the entire period of the contract, the Contractor and his SubContractor
shall at all times comply with all applicable labour laws, rules, regulations,
notifications, and bye-laws issued by the Central Government, State Government,
or Local Authorities. This includes all existing laws as well as any amendments or
new notifications that may come into force during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following
Act/statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment &
Conditions of Service) Act, 1996;
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen's Compensation Act, 1923;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of
Service) Act, 1979;
14. The Building And Other Construction Workers' Welfare Cess Act, 1996;
15. The Carriage by Road Act,
The above list is only indicative and not exhaustive. The Contractor shall remain
fully responsible for ensuring compliance with all other applicable labour and
welfare legislations, rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition to
other obligations prescribed under various labour laws, rules, and regulations
issued by statutory authorities such as the State Government or Government of
India from time to time, which the contractor shall strictly comply with during the
execution of the contract.
1) The Factories Act,
The contactor should not deploy worker below the age of 18 years and above
60 years for the awarded work.
Earn Leave shall be paid to their bonafide contract workers as per the
provisions of the Factories Act,
Payment of Earned Leave should be made monthly together with wages for
better compliance of law. The contactor shall maintain Earn Leave Register in
Form No. 19 as per the provisions of the said Act and submit the same on
All the written registers, Performa etc. shall be maintained up to date and
kept ready for inspection at any time or submitted on-time to the concerned
authorities as per applicability of the Acts by cotractor.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under
Contract Labour (Regulation & Abolition) Act from the appropriate authorities
before commencement of work. The contractor tor shall maintain a valid
labour license under the Contract Labour (Regulation and Abolition) Act for
employing necessary man power to be required by contractor.
EW-285 PUR-F-006 RFQ-
The contractor should not be allowed to engage fifty (50) or more contract
labourers without initiating to obtain the labour license under the Contract
Labour Act. (the said number i.e., fifty (50) or more includes Supervisor and
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through nearest
Nationalized Bank compulsory, preferably situated in the premises of TPS
area in case of all works contract. The Contractor shall supply copy of Bank
Statement duly stamped by the Concerned Bank as well as debited entry of
amount displayed in the contractors' own bank account as token of proof
towards payment of Wages through CLIM/prevailing system at relevant time.
Apart from Payment of wages through Bank, Contractors shall have to make
all other payments like Advances, Bonus, Leave Encashment etc. to their
labours through bank only and cash payment entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and
conditions of the license. The contractor shall have to pay wages to workers
as notified by the Government of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived
of their right to minimum wages payment on or before 7th of each month
shall be dealt as per the provision of labour laws. Recurrence of the same may
lead to cancellation of awarded contract.
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm
/Agency /Company itself for the subject work.
It should be ensured that all the contract labours engaged by contractor are
covered under the provident fund scheme and employee's pension scheme
and their contribution must be remitted regularly to the concerned RPFC. The
photocopies of challan along with ECR in this regards should be submitted
regularly to the User Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement
regarding deductions against employees' provident fund and family pension
scheme in respect of each concerned employee' Provident fund and family
pension scheme at the rate of 12 %o of wages (or at the rates made applicable
by the Government time to time). The contractor's contribution and his
workers contribution towards provident fund and family pension scheme shall
deposited by the contractor with concerned PF Authorities.
5) Workmen's Compensation & Employer's Liability Insurance.
The contractors shall have to obtain Employee Compensation Policy under the
Employees Compensation Act before starting the work. Employee
Compensation Insurance shall be obtained for all the workers engaged for the
execution of awarded contract. If any of the work is sub-letted the contractor
shall ensure that the sub-contractor take and provide workmen's
compensation and Employer's liability insurance for the labours engaged.
Contractor is liable to pay compensation in case of accidental injury arising
out of and in the course of employment as per the said Act and shall bear
medical expenses due to on duty accident.
6) The Payment of Gratuity Act,
For better compliance, contractor shall pay amount of gratuity on a monthly
basis along with the payment of wages, calculated on a pro-rata basis per
month, which is equivalent to 15 days' wages for each completed year of
service for every worker. (* applicable to ARC / BRC works contract only)
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contactor in an accounting
year, bonus, in accordance with the provisions of this Act, For better
compliance, the contractor should pay bonus amount on a monthly basis
along with wages calculated on a pro-rata basis per month. Contactor has to
submit the paid bonus details of its worker in Form No. C as per the
EW-285 PUR-F-006 RFQ-
provisions of the said Act as and when required by the Govt. Authority as well
8) The Maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide Maternity
Leave and other benefits as per the provision of the said Act.
9) The Building and other Construction Workers' Act,
For any construction work, fall under the definition of Section 2(1) d),
happening outside / inside the Factory premises the said act will be
applicable and the contactor or its sub-contactor shall be liable to comply
with the provisions framed there under.
10) The contractor shall give preference to existing or local contract workers for
engagement in the awarded contract and shall issue appointment orders to
each and every workers individually at the time of their engagement during
the period of contract and terminate the same at the end of the each contract.
Follow the mentioned procedure for each milestone for the execution of
works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare
Officer / Industrial Relations Officer for all formalities related to labour
law compliance before commencement of the contract and onward Labour
Law compliance thereof,, so that later no dispute will arise in respect of
compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contactor’s
employees maintain strict discipline as regards security, methods of safe
working etc., and not to cause any hindrance to smooth running of power
station or in execution of duties by GSECL staff Any lapse in this regard
will be viewed seriously and if lapse found, contact is liable to be
terminated. If any of contractor's staff is found unsuitable or not behaving
properly, the contractor shall have to remove such worker from the work-
site on demand by EIC. To maintain harmonious industrial relations
amongst contact labours is solely the responsibility of contractor. Any
breach of the same will be viewed seriously.
3. A digital system developed at the request of the agencies working at the
premises of GSECL, is to facilitate them for easy, efficient, effective
management of data, gate passes, attendances, medical records, Police
Verification documents etc. related to their employees / workers deployed
for various works and services against work order of GSECL.
4. On receipt of LOA and before commencement of work, authorized
representatives of the agency shall login in the CLIMS online portal /
prevailing system at relevant time and apply for registration of their
employees / workers uploading all information with required documents
in digital form. Upon completion of due verifications, clearance by EIC
and HR departments, contracting agency will obtain gate passes. GSECL
will only consider documents like wage sheet duly accepted and signed by
individual workers, as per the engagement/deployment duration/hours of
individual worker duly certified by the agency, being the employer, for the
purpose of payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and upto-date
data of their workers in the portal/ prevailing system at relevant time. All
statutory compliances under prevailing laws shall remain the
responsibility of the contracting agency. The agency shall indemnify/
GSECL against any liabilities arising from non-compliance of legal
provisions or inaccuracies in the data maintained by them in the digital
portal of CLlMS/prevailing system at relevant time.
5. The Contractor who intends to engage labours more than the specified
limit under law, then necessary - Form No. V under the Contract Labour
(R & A) Act, 1970 or Form No. VI under the Interstate Migrant worker
EW-285 PUR-F-006 RFQ-
(employment regulation) Act 1979 as applicable is to be obtained for the
purpose of obtaining Labour License from the Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-
Metric punching and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site
for daily supervision and for maintaining of various registers and records
required under the Labour laws and contracts. No payment for such
supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid for that
specific work order only and contractor should not divert the man power
for any other work order. If any work or part thereof is desired/required to
sublet, the contactor shall obtain the necessary permission of EIC in
black and white well in advance which is mandatory for considering the
statutory documents of agency other than the agency who awarded work
12) During Contractual Work under the progress:
1. All Contractors shall have to make the payment of wages to the Contract
Labours engaged by them, on or before 7th of every month through
Nearest Nationalized Bank compulsory, preferably situated in the
premises of power station area. The Contractor shall supply copy of Bank
Statement duly stamped by the Concerned Bank as a token of proof
towards payment of Wages through CLIMS / prevailing system at relevant
2. All Contractors has to comply & maintain statutory documents / registers
under the provision of labour laws & EPF Act.
3. In case the contractor having more than one contract in the same TPS,
the contractor shall have to obtain work order wise separate Gate Passes
and submit the same with the documents of statutory compliance that too
work order wise every month to the User Department to enable their
onward billing clearance.
13) CONTRACTORTO II\TDEMNIFY THE GSECL REGARDING LABOUR LAWS
The contractor shall indemnify and keep indemnified the GSECL, and every
member, officer and employees of the GSECL, also Engineer-in-charge and
his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever arising out of or in connection with the matter referred
in above clauses and elsewhere and against all actions, claims demands, cost
and expenses which may be made against the GSECL by any workman/
employees of contractor or any sub-contractor and or from any liability any
wise to any workman/employees of the contractor or sub-contractor under
any laws, rules or regulation having in force of law including but not limited
to claims against the owner under employee compensation Act, 1923. The
Employee's Provident Fund Act.l952, and/or the contract labour (Abolition
and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any
accident or injury to any workmen or other person in the employment of the
contractor or his sub-contractor, and the contractor shall indemnify and keep
indemnified the GSECL against all such damage and compensation and
against all claims, demands proceedings costs, charges and expenses
whatsoever in respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to comply with all the
labour laws as above-mentioned and keep the G.S.E.C.L. indemnified in
respect thereof.
GSECL : shall be entitled /empowered to deduct directly from the bills, the
amount to be paid to engaged bonafide contract workers or the contract
workers engaged by Sub-contractor any sum or sums payable by main
contractor / sub-contractor and which sum/sums the Corporation is required
EW-285 PUR-F-006 RFQ-
to pay in capacity of Principal Employer on account of the default of
contractor in respect of all liabilities incurred out of non-compliance regarding
any provisions of Labour Laws and same amount shall be recovered from the
pending dues of the contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at
present and that may be famed by the G S E C L from time to time in
connection with contracts will be binding and acceptable to contractor. The
above are some of the major liabilities of the contractor in addition to other
liabilities prescribed under the various labour laws in force from time to time
from Statutory Authorities like State Government / Government of India,
which the contractor shall have to comply with.
The contractor shall provide the name of authorized representative, as
provided to other statutory Government authorities and will be notified to
Engineer In-Charge time to time.
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under
Labour Laws and EPF in CLIMS / prevailing system at relevant time.
Required documents shall be uploaded by the contractor in existing portal
/prevailing system at relevant time invariably each month to Engineer In-
Charge for onward process and smooth clearance by HR Department.
List of documents required for gate passes of contract workers through clims
/ prevailing System.
Sr. Description of documents attached
1 Copy of Work Order
2 Copy of P. F. Code No.
3 insurance Policy as per subject of work order under the Workmen
Compensation Act,
4 Contract agreements/ subletting work contract documents with
5 Copy of Id proof of Aadhar card or Election voting card or driving
license or Passport only
6 Copy of Police Verification in respect of each contract workers
16. The contractor whose work order value is above Rs. 5 lacs shall have to
submit ‘Declaration cum Indemnity Bond’ on Rs. 300/- Non-Judicial stamp
paper in prescribed Performa (Annexure- ‘B’) with Agreement and Indemnity
Bond before the commencement of the contract.
DECLARATION CUM INDEMNITY BOND
(On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at_____________________
having its Reg. office at___________________________(hereinafter referred to as
“Contractor” which expression Shall unless it be repugnant to the context or
meaning thereof, be deemed to mean and include their respective assigns,
successor, executors, subcontractors and/or administrators) of the ONE PART in
favour of M/S Gujarat State Electricity Corporation Limited having its power
Station at Gandhinagar Thermal Power Station (hereinafter referred to as the
“Company”), which expression shall unless it be repugnant to the context or
EW-285 PUR-F-006 RFQ-
meaning thereof be deemed to mean and include its assigns, successors) of the
WHEREAS the COMPANY has entered into a contract with the Contractor for the
_____________________________________dated_____________“hereinafter called the
AND WHEREAS it is one of the essential conditions of the Contract that the
Contractor shall comply with all the provisions of the Labour& Industrial Laws, as
may be applicable from time to time for the discharge and completion of the works
and completion of the Works and Services covered under said Contract Labour (R
& A) Act 1970, Child Labour (Prohibition and Regulation) Act 1986, The Employees
Provident Funds & Miscellaneous Provisions Act, 1952, Employees State Insurance
Act 1948, Minimum Wages Act, 1948, Payment of Bonus Act, 1965, Payment of
Wages Act, 1936, Employees Compensation Act, 1923, Factories Act, 1948 and
other Labour Laws, Rules, Notifications and Codes which are at present applicable
to the contractor and which may be applicable during the tenure of the contract
(hereinafter referred as the ‘Laws’).
AND WHEREAS the Contractor has agreed to execute this Declaration cum
Indemnity Bond to this effect and has agreed to indemnify and Company, it’s
Directors, Officers and employees and representatives indemnified and hold
harmless against all third party claims, charges, penalties, fines, expenses, losses,
damages costs, suits or any other levy against the Company and/or the
management due to the failure of the Contractor to observe or follow all applicable
NOW THIS DEED WITNESSETH AS UNDER:
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct
and lapse, delays, misdeeds, faults, breaches, inactions etc done by his
assigns, successors, executors, subcontractor and/ or administrators shall be
construed to be have been done by the contractor and he alone shall be liable
for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor
subject to the condition of execution of this Declaration cum Indemnity bond,
the Contractor declares and represents to the Company that the Contractor
has obtained all Statutory registrations, Certificates, licenses and approvals
required under the Laws enabling the Contractor to execute the Contract in a
legal and lawful manner.
3. That in the event of any liability arising out of failure to observe or non-
compliance of any such „Laws‟ by the Contractor in connection with the
Performance of the contract, the Contractor shall bear all the resultant
whatsoever liability(ies), if any arising out thereof and that the company, its
Directors, Officers and employees, representatives, shall not be liable for any
such liability(ies). The Contractor agrees to indemnify and keep the Company
and its Directors, Officers and employees, representatives indemnifies, defend
and hold harmless, against all losses, costs, damages, claims, penalties,
interest, expenses, demands, fines, legal liability, causes of action, injury to
persons, suits etc., which may be suffered, incurred, undergone and /
sustained by the Company including the Costs and expenses that may be
incurred in defending any such liability(ies) claim(S), Proceeding (S) etc. that
maybe made or taken or taken or arise on the same by any Person, body,
authority, government, judicial / quasi - judicial authority due to the failure or
non-compliance of any such laws and rules there under (including any
amendments in acts, laws, statutes & rules there under) of whatsoever kind
EW-285 PUR-F-006 RFQ-
and nature arising out of or in any way connected with, whether or not such
acts or omissions are actual or alleged, active or passive with regard to the
discharge of the said Contract.
4. The Contractor further declares that in case of any suit / claim / right /
damages / compensation / fine / levy / charges / expenses / losses /
penalties / costs raised by the third party, including contract labours engaged
by the contractor, he shall join such proceedings in such
Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage,
claims, suits, demands, decrees, expenses that the Company may suffer to the
fullest satisfaction of the Company and if the Contractor fails to make good the
same then the Company shall have the right to recover the same and or any
other loss sustained, without any restriction or limitation, together with any
other incidental expenses, costs, and all incidental logistic expenses etc that
may be suffered by the Company from the Contractor and the Contractor
hereby further confirms and declares that this Declaration cum Indemnity
Bond is irrevocable and shall be final and binding on it / him heirs, executors,
administrators, legal representatives, successors, subcontractors and assigns,
wherever the context applies. any claims, demands, shall be adjusted against
any amount due and payable to the Contractor and the Company shall have
the right to withhold any amounts due and payable to the Contractor, till the
settlement of such claims, disputes to the Contractor towards discharge of
such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of
India and any dispute between the parties with regard to this Declaration cum
Indemnity Bond shall be resolved through the dispute resolution process
mentioned in the General Conditions of the Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day
and year first hereinabove written.
SIGNED SEALED AND DELIVERED By the within named “CONTRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
In presence of Witness
Name & Address of Witness Signature
Residential Address:
Residential Address:
EW-285 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
GENERAL RULES AND DIRECTIONS FORTHE GUIDANCE OF CONTRACTOR
Notwithstanding anything contained to the contrary in the specification or tenders
in subsequent exchange of correspondence, the conditions of contract shall be
binding on the contractor and any change of variation expressed or implied
however made in the said conditions shall not be however valid or operative unless
expressly sanctioned by the corporation The contractor shall be deemed to have
fully informed himself and to have special knowledge of the provisions of the
conditions of contract herein contained.
1. All works proposed to be executed by contract shall be notified in one of the
English and one of the vernacular local daily newspapers stating the work to be
carried out as well as the date for submitting and opening tenders and time
allotted for carrying out the work also the amount of earnest money to be
deposited with the tenderer and the security deposit to be deposited by the
successful tenderer.
2. Copies of the specifications, designs drawings, estimated rates. Schedule rates
and any other documents required in connection with work which will be signed
by the Executive Engineer for the purpose; of identification shall be open for
inspection by the contractors at the office of the Executive Engineer during
3. Where the works are proposed to be executed according to the specification
recommended by a contractor and approved by a competent authority on
behalf of the Gujarat State Electricity Corporation Ltd. Such specification with
designs and drawings shall form part of the accepted tender.
3 The tender and receipts for payments made on the account of any work, when
executed by a firm, should be signed by all the partners except where the
contractor are described in their tender as firm in which case the receipt shall
be signed in the name of firm including the Partners or some other persons;
having authority to do so.
5. Any person who submits tender at percentage rate shall fill up the usual form
stating what percentage above or below rates specified he is willing to
undertake the work. Only one rate or such percentage on all the estimated rates
or scheduled rates shall be mentioned.
6. Tenders which propose any alteration in the work specified in the form
invitation to tender or in the time allowed for carrying out the works or which
contain any other conditions of any sort, will be liable to rejection.
7. No single tender shall include more than one work. but contractors who wish to
tender, for two or more works, shall submit a separate tender for each work.
Tender shall have the name and the number of the works of which they pertain
be subscribed on the envelop.
8. The Executive Engineer or his duly authorized assistant will open tenders in the
presence of any intending contractors who may be present at the time and will
enter the amount of the several tenders in a comparative statement in a
suitable form. In the event of tender being accepted the contractor shall
thereupon, for the purpose of identification, sign copies of the specifications
and other documents. In the event of tender being rejected the officer (Executive
Engineer ) shall authorize the paying officer to refund the amount of the earnest
money deposited to the contractor making the tender on his giving for the
return of the money.
9. The officer competent to dispose off the tenders, shall have the right of rejecting
all or any of the tenders without assigning any reasons thereof.
10. No receipt for any payment alleged to have been made by a contractor in regard
to any matter relating to tender of the contract shall be valid and binding on the
EW-285 PUR-F-006 RFQ-
corporation unless it is signed by the Executive Engineer.
11. The memorandum of work to be tendered for and the schedule of materials to
be supplied by the Gujarat state Electricity corporation Ltd. and their rates
shall be filled in and completed by the office of Executive Engineer before the
tender form is issued if a form issued to an intending tenderer has not been so
filled in and uncompleted he shall request the said office to have this done
before he completes and delivers his tender.
12. All work shall be measured, meet by standard measure and according to rules
and custom and usual in the use in the Gujarat state electricity corporation
Ltd. and no proposals to adopt alternative method will be accepted. The
Executive Engineer's decision as to what is the usual method in use in the
Gujarat state Electricity Corporation Ltd. shall be final.
13. Every contractor shall except the registered contractor on the approved list of
the corporation produce along with his tender a solvency certificate from the
collector of the District within which he resides or a bankers Certificate of his
financial stability if he fails to produce such a certificate his tender will not be
14. All correction and addition or pasted slips should be initiated.
15. Tenderer shall be deemed to have full knowledge of all relevant documents site
conditions etc. whether inspected or not by him.
16. Submissions of a tender by a contractor implies he has read the instruction
and conditions of contract and has made himself aware of the scopes and
specification of the work to be done & of the conditions and rates at which
stores etc. will be issued to him and local conditions and other factors bearing
on the execution of the work.
17. Under no circumstances shall any contractor be entitled to claim enhanced
rates for any items of contract without prior sanction of the competent
18. These rules and directions shall form part of the contract.
I/We hereby tender for the GUJARAT STATE ELECTRICITY CORP.LTD. (herein
referred as "Corporation") of the work specified in the under written memorandum
within the time specified in Scheduled B (memorandum showing items of work to
be carried out) and in accordance in all respect with the specifications design
drawing and instructions in writing and as per annexed conditions of contract and
agree that when the materials for works are provided by the corporation such
materials and rates to be paid for them shall be as Provided in schedule A hereto.
(a) General description of work.
(b) Estimated cost.
(c) Earnest money.
(d) Security deposit:
(1) Party shall have to pay security deposit(if applicable) in the form of Bank
Guarantee/ Demand Draft in favour of GSECL payable at Gandhinagar within
10 days of date of issue of Letter of Intent.
(2) Time allowed for the completion of work from date written order to commence.
Should this tender be accepted I/we hereby agree to abide by and fulfill all the
terms and provision of conditions of contractor annexed hereto as applicable and
in default thereof forfeit and pay to the corporation the sums of money mentioned
in the said conditions.
Receipt No. date from the GUJARAT STATE ELECTIRICITY CORP.
LTD. in respect of sum of Rs. (The amount to be specified in figure & words,) Is
herewith forwarded representing the earnest money (the full value of which is to be
absolutely forfeited to the CORPORATION l/We not deposit the full amount Deposit
of the said conditions/otherwise the said sum of Rs. Shall be refunded
on surrendering the original receipt.
EW-285 PUR-F-006 RFQ-
Signature of the Contractor Address of the
Signature of witness Address of Witness
The above tender is hereby accepted by me on behalf of the Gujarat State
Electricity Corporation Ltd.
The Chief Engineer (Gen).
Superintending Engineer
Executive engineer
Or his duly authorized assistant.
EW-285 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD, GANDHINAGAR
TENDER & CONTRACT FOR WORKS
CONDITIONS OF CONTRACT
(a) The “contract” means the documents forming the tender and acceptance
thereof together with the document referred to therein or individual work order
in the case of term contracts including these conditions schedules and or
additional conditions attached to the form of tender or individual works, order,
rate schedule the specifications and the drawings and all these documents as
applicable taken together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender the applicable schedules
and/or additional conditions and the specifications and/or drawing as issued
on the contractors for the purpose of preparing tender.
(c) The expression "Works" or 'work when used in the condition of contract shall,
unless there be something in the subject or context repugnant to such
construction means the work or the work contracted to be executed under or
in virtue of the contract whether original or altered.
(d) The "Contractor” means the individual or firm or company. Whether
incorporated or not, undertaking the works and shall include his or its legal
personal representatives successors and permitted assignees.
(e) ”Corporation” means Gujarat state Electricity Corporation Ltd. and the
"Accepting Officer" means the officer who is authorized to sign and signs the
contract on behalf of the corporation.
(f) The letter “EE" means Executive Engineer who in the case of measurement and
lump sum contracts directs the contract and the letters S.E. mean
Superintending Engineer and "CE(G)" means Chief Engineer (Generation), who
administers and in the case of the term contracts directs the contract.
(g) 'The Engineer-in-charge" means all officers of the CORPORATION appointed by
the Chief Engineer (Gen), to supervise the works or part of the works.
(h) "Approved" and "Directed" means the approval or direction of the Chief
Engineer (Gen), or the Superintending Engineer or the person deputed by him
for the particular purpose.
(i) B.S. means the "British Standards" as issued by the British Standard
Institution. "A.S.” means the “American Standards" as issued by the "American
Standards Institution" and "I.S." means the “Indian Standards" as issued by
the Indian Standards Institution. Wherever the above mentioned abbreviations
are referred to in the specifications and/or work orders, they mean
the addition with all amendments current at the date of issued of tender
document of work orders.
In case of measurement and terms of contracts "Specifications" mean those
contained in Gujarat State Electricity Corporation Ltd. Schedule together with
any amendments etc. embodied in the tender documents “Drawing” refer to
those accompanying the tender documents and/or any work orders referred
(j) The “Contract Sum" means the sum accepted or the sum calculated in
accordance with the prices accepted in the tender and/or the contract rate as
payable to the contractor for the full and entire execution and completion of
(k) "The date for completion" is the date or dates of completion of the work or any
part of the works set out or ascertained in accordance with the individual work
orders and the tender documents or any subsequent agreed amendments
EW-285 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
1. Security Deposit:
The contractor shall within 10 days from the date of issue of letter of intent pay the
security deposit for the performance of the contract.All damages, costs, charges,
expenses and other sums which may be or may become due to payable by the
contractor to the CORPORATION under the terms of the contract may be deducted
from the cash the proceeds of sale of the securities so deposited (which the officer
or person to whom the same may be endorsed as aforesaid is hereby authorized to
sell that purpose) of from the interest of any such securities or from any sums or
which may become due to the contractor by the CORPORATION whole or the
balance unapplied as aforesaid of cash securities so deposited being repaid or
transferred and returned as may be to contractor after the date on which the final
bill is paid or after the expiry of the date up to which the contractor has to
maintain the work in good order whichever is later.
2.Compensation for the delay :
The time limit allowed for carrying out the work as entered in the tender shall
strictly observed by the contractorand shall be reckoned from the date on which
the order to commence the work is given to the contractor. The work shall
throughout the stipulated period of contract be proceeded with all due diligence
(time being deemed to be the essence of contract) and for delay the contractor shall
pay compensation an amount equal to half percent per one week for the Contract
value or as per the decision of the Competent Authority of the GSECL..
3. Action when whole of Security Deposit is forfeited;
In any case in which under any clause of this contract the contractor shall have
tendered himself to pay compensation amounting to the whole of his security
deposit (whether paid sum or deducted by installments) or in the case of
abandonment to the work owing to serious illness/ death of the contractor or any
other cause, the Executive Engineer on behalf of the corporation shall have
powers to adopt (a) below and any of the following causes under (b) and (c) as he
may deem best suited to the interest of the corporation.
To rescind to the contract (or with rescission notice of 10 days in writing to
the contractor under the hand of the Executive Engineer shall be conclusive
evidence and in that case the security deposit of contractor shall stand forfeited
and be absolutely at the disposal of the corporation.
(b) To employ labor paid by the corporation to supply materials to carry out the
works, or any part of the works debiting the contractor with the cost of the labor
and the price of the materials (as to the correctness of which cost & price, the
certificate of Executive Engineer shall be final & conclusive against the contractor)
and crediting him with value of the work done. In all respect in the same manner
and at the same rates as if it had been carried out by the contractor under the
terms of this contract and in that case the certificate of the Executive Engineer as
to the value the work done shall be final and conclusive against the contractor.
(c) To order that the work of the contractor be measured up and to take such part
thereof as shall be unexecuted out of his heads and to give it to another contractor
to complete in which case any expenses which may be incurred in excess of the
sum which would have been paid to the original contractor if the whole work had
been executed by him (as to amount of which excess expense the certificate in
writing of the Engineer shall be final, conclusive and shall be paid by the original
contractors) and shall be deducted from any money due to by the corporation
under the contract or otherwise from his security deposit of the proceeds sale
thereof or a sufficient part thereof.
In the event of the above causes being adopted by the Executive Engineer the
contractor shall have no claim to compensation for any loss sustained by him by
reason of his having purchased or procured any materials or entered into any
EW-285 PUR-F-006 RFQ-
engagement or made any advances on account of or with a view to the execution of
the work or the performance of the contract. And in case the contract shall be
rescind under the provision aforesaid the contractor shall not be entitled to recover
or be paid any sum for any works thereof actually performed by him under this
contract unless and until the Executive Engineer shall have certified in writing the
performance of such work and the amount payable to him in respect thereof and
he only be entitled to be paid the amount so certified.
4. Notice for Unsatisfactory Progress :
If the progress or a particular portion of the work is unsatisfactory the Executive
Engineer whose decision shall be final shall not withstanding that the general
progress of work is satisfactory be entitled to take action under Clause 3(b) after
giving the contractor 10 days notice in writing and the contractor will have no
claim for compensation for any loss sustained by him owing to such action.
5. Action in the case of Default by Contractor:
If any case in which any of power conferred upon the Executive Engineer by
Clauses 3 and 4 hereof shall have exercisable and the same shall not have been
exercised, the non-exercise thereof shall not constitute a waiver of any of the
conditions hereof and such powers shall notwithstanding be exercisable in any
further case of default by the contractor for which by any hereof he is declared
liable to pay future compensation shall remain unaffected in the event of the
Executive Engineer taking action under sub-clause (a) or (c) of Clause 3 he may, if
he so desires take possession of all or any tools plant materials and stores in so
upon the work or the site thereof belonging to the contractor or procured by him
and intended to be used for the execution of the work or any part thereof paying
for allowing the same in account at the contract rates or in the case of a contract
rates not being applicable of current market rates to be certified by the Executive
Engineer whose certificate thereof shall be final. In the alternative the Executive
Engineer may by notice in writing to the contractor or his clerk of works, foreman
or other authorized agent require him to remove such tools Plant materials or
stores from the premises within a time to be specified in such requisition the
decision to the contractor failing to comply with any such requisition the decision
of the Executive Engineer as to the expense of any such removal and the amount of
the proceed and expense of any such shall be final and conclusive against the
6. Extension of Time Limit :
If the contractor shall desire an extension of the time limit for completion of the
work on the ground of his having been unavoidably hindered in execution or any
other ground he shall apply in writing to the Executive engineer and the executive
Engineer may, if in his opinion there are reasonable grounds for granting extension
recommend such extension as he thinks necessary or proper. The decision of the
competent authority in this shall be final.
7. Completion Certificate
On completion of the work the Contractor shall be furnished with Completion
Certificate by the Executive Engineer of such completion but no such certificate
shall be given nor shall be the work of considered to be complete unit works are
taken over and/or duly tested and put to operation as the case may be nor until
the work have been measured by the Engineer in Charge or where the
measurements have been taken by his subordinates until they have received the
approval of the Executive Engineer the said measurements being binding and
conclusive against the contractor.
8. Effect of the Certificate :
No payment shall be made for any work estimated to cost less than Rs. 1,000 till
after the whole of said work shall have been completed and certificate of completion
given. But in the case of works estimated to cost more than Rs. 1,000 contractor
shall on submitting a monthly bill thereof to be entitled to receive payments
propionate to the part of the work them approved and passed by the Engineer-in-
charge whose certificate of such approval and a passing of the sum so payable
EW-285 PUR-F-006 RFQ-
shall be final and conclusive against the contract of all such intermediate payment
shall be regard as payment by way of advance against the final payment only and
not as payments for work actually done, completed and shall not preclude the
Engineer-in-charge from requiring bad, unsound, imperfect or unskillful work to be
removed and taken away and reconstructed or re erected not shall any such
payment be considered as admission of the due performance of the contractor any
part thereof in any respect of the accruing of the claim nor shall conclude,
determine or effect in anyway the otherwise or in any other way vary or affect the
contract. The final settlement and adjustment of the accounts otherwise or in any
other way vary or affect the contract. The final bill shall be submitted by the
contractor within one month of the date fixed for completion of work, otherwise,
the certificate of the Engineer-in-charge of the measurement and of total amount
the certificate of the Engineer-in-charge of the measurement and of total amount
payable for the work shall be final and binding on all parties.
9. Payment to Contractors:
The rates for several items of works estimated to cost more than Rs. 1000 agreed to
within shall be valid only when the item concerned is accepted having been
completed full in accordance with the sanctioned specification. In case, where the
items of the work are not accepted as so completed the Engineer-in-charge may
make payment on account of such items at such reduced rates as he may
considers reasonable in the preparations of final or running accounts bills.
Bills shall be submitted by the contractor each month on or before the date fixed
by the Engineer-in-Charge for all works executed in the previous month and the
Engineer-in-Charge shall take or cause to be taken the requisite measurement for
the purpose or having the same verified and the claim so far as it is admissible
shall be adjusted. If, possible, within ten days from the presentation of the bills,
If the, contractor does not submit the bill within the time fixed as aforesaid the
Engineer-in-Charge may depute a subordinate to measure up the said work in
the presence of the contractor or his duly authorized agent whose counter
signature in the measurement list shall be sufficient warrant and the Engineer-in-
Charge may prepare a bill from such list which shall be binding on the contractor
in all respects.
11. Supply of Materials to Contractor:
If the specification of the estimate work provides for the use of any special
description of material to be supplied from the corporations Stores or if it is
required that the contractor shall use certain stores to be provided by the
Engineer-in-Charge (such material and stores and the prices to be charged thereof
as hereinafter mentioned being so far as practicable for the convenience of
contractor but not so as in any way to contro1, the meaning or effect of this
contract specified in the schedule or memorandum hereto annexed) the contractor
shall be supplied, with such materials and stores as may be required from time to
time be used by him for the purpose of the contract only and the value of the full of
materials and stores so supplied shall be cut of or deducted from any such item
due or thereafter to become due to the contractor under the contract or otherwise
or from the security deposit or the proceeds of sale thereof if the deposit is held in
Government securities the same or a sufficient portion thereof shall be sold for the
purpose. All materials supplied to the contract or shall remain the absolute
property of corporation and shall on account be removed from the site of the work
and shall at time be open to inspection by the Engineer-in-charge. Any such
materials unused and in perfectly good condition at time of completion or
determination of the contract shall be returned to the corporation stores if the
Engineer-in-Charge so requires by notice in writing given under his hand but the
contractor shall not be entitled to return any such materials supplied to him as
aforesaid but remaining unused by him or for any wastage in damage thereto.
The contractor shall be responsible for the loss, destruction or deterioration of the
material stores or articles supplied to him by the corporation even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever
EW-285 PUR-F-006 RFQ-
beyond his control as if the materials, stores or articles so supplied were his
12. Works to be executed in accordance with Specifications, Drawings, Orders
The contractor shall execute the whole and every part of work in the most
substantial and workmanlike manner and both as regarding materials and in every
other respect in strict accordance with the specifications, the contractor shall also
confirm exactly , fully and faithfully to the designs, drawings and instructions in
writing relating to the work signed by the Engineer-in-Charge and lodge in his
office and to which the contractor shall be entitled to have access for the purpose
of inspection at such office or on the site of the work during office hours and the
contractor shall; if he so requires, be entitled at his own expense to make or cause
to be made copies of the specification, and of all such designs, drawings and
instruction as aforesaid .
13. Alterations in Specifications and Designs not to invalidate Contracts:
The Executive Engineer shall have powers to make any alterations, in or addition
to the original specifications designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be
bound to carry out-the work in accordance with any instruction in this connection
which may be given to him in writing signed by the Engineer-in-Charge and such
alterations shall not invalidate the contract. Any additional work which the
contractor may be directed to do in the manner above specified as part of the work
shall be carried out by the contractor on the same conditions in all respect on
which he agreed to do the main works, and at the same rates as are specified in
the tender for the main work.
Where, however, the work is to the executed according to the designs, drawings
and specifications recommended by the contractor and accepted by the competent
authority. The alteration above referred to shall be within the scope of such
designs, drawings and specifications appended to the tender.
14. Rates for Works not entered in Estimate or Schedule of Rate of the
And if the additional and altered work includes any class of work for which no rate
is specified in this contract then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the Division or at the mutually agreed upon
between the Executive Engineer and the contractor whichever are lower. If the
additional or altered work for which no rate is entered in the Schedule of Rates of
the Division is ordered to be carried out before the rates agreed upon then the
contractor -thin seven days of date of receipt by him of the order to carry out the
work inform the Executive Engineer does not agree to this rate he shall be notice
in writing be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider advisable provided
always that if the rates shall have been determined as lastly herein before
mentioned then in such case he shall only be entitled to be paid in respect of the
work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall be
fixed by the Executive Engineer. In the event of dispute, the decision of the
Superintending Engineer of the Circle will be final.
15. Extension of Time Limit in consequence of Addition or Alteration:
The time limit for the work shall be extended in the proportion that the increase in
its cost occasioned by alteration or addition bears to the cost of the original
contract work and the certificate of the Engineer-in Charge as to such proportion
shall be conclusive.
16. No Compensation for Alteration in or Restriction of Work to be carried
If any time after the execution of the contract documents the Engineer-in-charge
shall be for any reason whatsoever require the whole or any part of the work as
specified in the tender to be stopped for any period or shall not require the whole
or part of the work to be carried out at all or to be carried out by the contractor he
EW-285 PUR-F-006 RFQ-
shall give notice in writing or the fact to the contractor who shall thereupon
suspend or stop the work totally or partially as the case may be in any such case
except as provide hereunder the advantage which he might have derive from the
execution of the work in full but which he did not so derive consequence of the full
amount of work not having been carried out or on account of any loss that he may
be put to on account of material purchased or agree to be purchased or for
unemployment of labor recruited by him. He shall not also have any claim for
compensation by reason of any alterations having been in the original specification
drawings, designs, and instructions which may involve any curtailment of the work
as originally completed. Where, however, materials have already been purchased or
agreed to be purchased by the contractor before receipt by him of said notice, the
contractor shall be paid for such materials at the rate of requirement and are of
approved quality and/or shall be compensated for the loss, if any, that the he may
put to in respect of materials agreed to be purchased by him, the amount of such
compensation to be determined by the Executive Engineer whose decision shall be
final. If the contractor suffers any loss on account of his having to pay, his labor
charges during the period during which the stoppage of work has been ordered
under this clause the contractor shall on application be entitle to such
compensation on account of labor charges as the Executive Engineer whose
decision shall be final may consider reasonable provided that the contractor shall
be entitle to any compensation on account of labor charges if in the opinion of the
Executive Engineer , the labor could have been employed by the contractor
elsewhere for the whole part of the period during which the stoppage of the work
has been ordered as aforesaid.
17. No claim to compensation on account of loss due to delay of materials by
The contractor shall not be entitled to any claim any compensation from
corporation for the loss suffered by him on account of delay by corporation in the
supply of materials entered in Scheduled A where’ such delay is caused by:
(i) Difficulties relating to supply of railway wagons.
(ii) Force Major
(iii) Act of God
(iv) Any other reasonable cause beyond the control of corporation
In the case of such delay in the supply of materials.corporation shall grant such
extension of time for the completion of the works as shall appear to the Executive
Engineer to be reasonable in accordance with the circumstance of the case. The
decision of the Executive Engineer as to the extension of time shall be accepted as
final by the contractor.
18. Time Limit for Compensation claims:
Under no circumstances whatsoever shall the contractor be entitled to any
compensation from corporation on any account unless the contractor has claimed
in writing to the Executive Engineer within one month of the cause thereof.
19. Action and Compensation payable in case of Bad Work:
At any time before the security deposit is refunded to the contractor shall appear
the Executive engineer or his subordinate in charge of the work that any work has
been executed with unsound imperfect or unskillful workmanship or with
materials of inferior .quality or that any materials or articles provided by him for
the execution of the work are unsound or of a quality inferior to that contract for or
are otherwise not in accordance with the contract it shall be lawful for Engineer-
in-Charge to intimate this fact in writing to the contractor and then
notwithstanding the fact that the work materials or articles complained of may
have been inadvertently passed, certified and paid for, the contractor shall be
bound forthwith to rectify or remove and reconstruct the work so specific in whole
or in part as the case may require or if so required shall remove the materials or
articles so specified and provide other suitable materials or articles at his own
charge and cost, and in the event of his failing to do so within a period to be
specified by the Engineer-in-Charge in the written intimation aforesaid, the
contractor shall be liable to pay compensation at the rate of one percent on the
EW-285 PUR-F-006 RFQ-
amount of the estimate for every day not exceeding ten days during which the
failure so continues and in the event of any such failure as aforesaid the Executive
Engineer may rectify to get remove and re-execute the work and replace the
materials or articles complained of as the case may be at the risk and expense in
all respects of contractor should the Engineer -in-Charge consider that any such
inferior work of materials as described above may be accepted or made use of, it
shill be within discretion to accept the same as such reduce as he may fix thereof
Provided that in the case of any work of which is visible check is not possible if the
Engineer-in-Charge or his subordinate in charge of the work feels that such work
has been executed with unsound, imperfect , unskillful workmanship or with
materials of interior quality, he shall take sample test at random, cost of which
shall; have to borne by the contractor and if after taking such test part of such
work is found to be defective in any respect of to have been executed with materials
of inferior quality, then the contractor shall be paid for the whole work such
amount as may be fixed by the office on the basis of the lowest quality of work
found by him in such sample tests.
Sample Test shall mean:
(i) In relation to poles fixed as line supports the token of one pole out of every
100 poles after taking it out from its foundation for inspection.
(ii) In relation to any other work such test as may be considered necessary by the
Engineer-in-charge or his subordinate in charge of the work.
Cost of sample test shall mean cost incurred for the purpose of taking sample test
and for restoring the tested work to its original condition.
20. Work to be opened to inspection Contractor or Responsible Agent to be
All works under or in course of execution or executed in pursuance of the contract
shall at times be open to the inspection and supervision of the Executive Engineer
and his subordinate and contractor shall at all times during the usual working
hours and at all other times at which reasonable notice of the intention of the
Executive Engineer or his subordinate to visit the works shall have been given to
the contractor, during which period either he should be present to receive order
and instruction or have a responsible agent duly accredited in writing, present for
that purpose. Orders given to the contractors duly authorized agent shall be
considered to have the same force and effect as if they had been given to the
contractor himself.
21. Notice to be given before work is covered up:
The contractor shall be given not less than five days notice in writing by the
Executive Engineer or subordinate In-charges of the work before covering up of
otherwise placing beyond the reach of measurement any work in order that the
same may be measured and correct dimension thereof taken before the same is so
covered up or placed beyond the reach of measurement and shall not and work
without the consent in writing of Executive Engineer or his subordinate in charge
of the work. If any work shall be covered up or placed beyond the reach without
such notice having been given or consent obtained the same shall be uncovered at
the contractors expense, and in default thereof no payment or allowance shall be
made for such work or for the materials with the same was executed.
22. Contractors Liabilities:
The contractors shall supply at his own cost all materials (expect such special
materials, if any, as may be supplied from the corporation Stores in accordance
with the contract plant tools appliances, implements ladders, cordage, take
scaffolding and any temporary works which may be required for the proper
execution of the work, in the original altered or substituted from and whether
included in the specification or other document forming part of the contract or
referred to in these conditions or note and which may be necessary for the
purpose of satisfying or complying with the requirement of the Engineer-in-charge
as to any matter on which under these conditions he is entitled to be satisfied or
EW-285 PUR-F-006 RFQ-
which he is entitled to require together with carriage thereof to and from the work.
The contractor shall also supply without charge the requisite number of person
with means and materials necessary for purpose of setting out works, and
accounting, weighing and assisting in the measurement of examinations at any
time and from time to time of the work or material. Failing this the same may be
provided by the Engineer-in-charge at the expenses of the contractor and the
expenses may be deducted form any money due to the contractor under the
contractor from his security deposit or the proceeds of sale thereof or of a
sufficient portion thereof. The contractor shall provide all necessary fencing and
lights required to protect the public from accident and shall also be bound to bear
expenses of defense of every suit, action or other legal proceedings at law that may
be brought by any person for injury sustained. Owing to neglect of the above
precautions and to pay any such person or which may be awarded in such suit,
action or proceedings to any such Persons or which may with the consent of the
contractor be paid in compromising any claim by any such person.
23. Contractors Liable for all Damage:
Compensation for all damages done intentionally or unintentionally by
contractor's laborer whether in or beyond the limit of corporation’s property shall
be estimated by the Executive Engineer, or such other officer as he may appoint
and the estimates of the Executive Engineer, subject to the decision of the
Superintending Engineer, on appeal shall be final and the contractor shall be
bound to pay the amount of the assessed compensation demand failing which, the
same will be recovered from the contractor as damages or deducted by the
Engineer-in-charge from any sums that may be due to or become due from
corporation to the contractor under this contract or otherwise. The contractor
shall bear the expense of defending any action or other legal proceeding that may
be brought by any person for injury sustained by him owing to neglect of
precautions to prevent the spread of fire and he shall also pay any damages and
cost that may be awarded by the court if in consequence.
24. Rescission of Contract and Forfeiture Deposit
The contractor shall not be assigned or subject without the written approval of the
Engineer-in-charge and if the contractor assign or subject his contract, or attempt
to do so or become insolvent or commence any Proceedings to be adjudicated as
insolvent or make any composition with creditors, attempt to do so the Engineer-
in-charge may by notice in writing, rescind the contract. Also, if any bribe gratuity,
gift, loan, Perquisite, regard or advantage pecuniary or otherwise shall either
directly or indirectly be given promised or offered by the contractor any of his
servants, or agents, to any person in the employee of corporation in any way
directly or indirectly interested in the contract the Executive Engineer may give
10 days notice in writing and rescind the contract. In the event of a contract
being rescinded the security deposit of the contractor shall there upon stand
forfeited and be absolutely at the discretion of corporation and the same
consequences shall ensure as if the contract has been -rescinded under Clause
thereof and in addition the contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
25. Compensation .
All sums payable by a contractor by way of compensation under any of these
conditions shall be considered as a reasonable compensation to be applied to the
use of corporation without reference to the actual loss or damage sustained and
Whether any damage has not been sustained.
26. Changes In the Constitution of Firm to be notified.
In the case of tender by partners of a firm any change in the constitution of firm
shall be forthwith notified by the contractor to the Executive Engineer for his
27. Works under direction of Superintending Engineer.
All works be executed under the contract shall be executed under the direction and
subject to the approval of the Superintending Engineer of the Circle for the time
EW-285 PUR-F-006 RFQ-
being who shall be entitled to direct at what point or points and in what manner
they are to be commenced and from time to time carried on.
28. Decision of superintending Engineer to be final.
Except where otherwise specified in contract and subject to the power delegated to
him by corporation under the corporation , then in force the decision of the
Superintending Engineer of the Circle for the time being shall be final conclusive
and binding on all parties of the contract upon all questions relating to the
meaning for the specification, designs drawings and instruction herein before
mentioned and as to the quality of workmanship or material used on the work or
as to any other question, claim right matter or thing whatsoever in any way arising
or relating to the contract. designs, drawing specification estimates instructions
orders or these conditions or otherwise concerning, the works or the execution or
failure to execute the same whether arising during progress of the work or after the
completion on abandonment thereof.
29. Stores to be obtained from corporation
The contractor shall obtained from the corporation stores, such stores and
articles as are mentioned schedule A which may be required for the work or any
part of the work or in making up any articles required therefore or in connection
therewith unless he has obtained permission in writing from the Executive
Engineer or obtained such stores and articles from elsewhere. The value of such
stores & articles as may be supplied to the contractor by the Engineer-in-charge
will be debited to the contractor his account at the rate shown in the schedule A
attached to the contract and if they are not entered said schedule, they shall be
debited to him at cost price which for the purposes of this contract shall include
cost of carriage and all other expenses whatsoever which may have to be incurred
in obtaining delivery of the same at the stores aforesaid and further overhead
charges 15%. The contractor shall be responsible for the loss destruction or
deterioration of the materials, stores or articles supplied to him by the corporation
even if such loss destruction or deterioration has occurred under any articles so
supplied were his property. The contractor shall be responsible for returning the
residual materials after completion of the contract and if fails to return the
balance materials supplied to him by the corporation the cost of the of the residual
materials will be recovered form the contractor at the market rate or stock issue
rate whichever is higher at the time of materials account plus 15%.
30. Lump Sum in Estimate.
(1) When the estimate on which tender is made includes lump sums in respect of
parts of the works contractor shall be entitled to payment in respect of the items
or works involved or the part of work in question at the same rates as are payable
under this contract or such items of the part the work in question is not in the
opinion of the Engineer-in-charge capable of measurement Engineer-in-charge and
the certificate in writing of the Engineer-in-charge shall be final & conclusive
against the contractor with regard to any sum or sums payable to him under
provision of this clause.
Lump sum Tenders
(2) Whenever lump sum tenders have been invited for buildings or other
structures of the same type, design, the contractor shall submit his bill stated in
Clause II and the Engineer-in-charge not below the rank of Executive Engineer
shall certify by general measurement or by other method considered suitable to
him, the value of work done and the contractor shall be paid monthly a sum equal
to. 90% of the total value the work so certified since the last payment after
deducting a part or whole of the secured advance if not already paid for the
materials utilized on the works. An additional secured advance for any fresh
materials brought on site will also be paid if certified by the office not below the
rank of Executive Engineer.
After the work is completed final bill would be paid on the certification of an officer
not below the rank of Executive Engineer, that the works are done according to
drawing and specifications attached to the tender if any additions and alteration
have been carried out, details measurement in respect thereof shall be recorded
EW-285 PUR-F-006 RFQ-
and extra payment of deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the additions
and alteration for which the contractor has not quoted a rate, the payment shall be
regulated as per clause 14 above.
31. Action Where no Specification.
In the case of any class of work for which there is no such specification as is
mentioned in rule I such work shall be carried out in accordance with the
divisional specifications and in the event of absence of divisional specification the
work shall be carried out in all respect in accordance with the instructions and
requirement of the Engineer-in-charge.
32. Compensation under Workmen’s Compensation Act.
The contractor shall be responsible for and shall pay any compensation to his
workmen payable under the workmen’s Compensation Act 1923 (VIII of 1923)
(herein after called the said Act) for injuries caused, to the workmen. If such
compensation is paid by corporation as principal under sub-section (1) of Section
12 of the said Act on behalf of the contractor, it shall be recoverable by Corporation
from the contract or under sub-section (2) of the said section. The contractor shall
pay such amount of compensation on demand failing which it will be recovered
from him by deducting it from any sums that may be due or become due to the
contractor by the corporation under this contract or otherwise.
33. No claim for Variation in quantities of work
Quantities shown in the tender are approximate and no claim shall be entertained
Quantities of work executed being either more or less than those entered in the
tender or estimate.
34. No claim for Compensation for Delay in execution of work
No compensation shall be allowed for any delay caused into starting of work on
account of acquisition of land and in the case of clearance works for any delay in
according to sanction estimate.
35. No claim for Compensation for delay in execution of work
No compensation shall be allowed for any delay in execution of the work on
account of water standing in borrow pits or compartment, the rates are inclusive
for hard or cracked soil, excavation in mud, subsoil water or water standing in
borrow pits and no claim for an extra rate shall be entertained unless otherwise
expressly specified.
36. Entering upon or commencing any portion of work
The contractors shall not enter upon or commence any portion of work except with
the written authority any instructions of the Executive Engineer or his subordinate
in charge of the work fail in such authority the contractor shall have no claim to
ask for measurement of payment for work.
37. Method of Payment
Payment to contractors shall be made by cheques provided the amount exceeds
Rs. 10/- Amount not exceedingRs. 10/- will be paid in cash.
38. ACCEPTANCE OF CONDITIONS OF TENDERING FOR WORK
Submission to tender or acceptance of work order shall imply acceptance of those
conditions of tender by contractor.
39. Employment of Scarcity Labor
If Government declares a state of scarcity of famine to exist in any village situated
within 10 miles of the work the piece worker/contractor shall employ upon such
parts of the work as are suitable for unskilled labor any person certified to him by
the Executive Engineer or by any person to whom Executive Engineer may have
delegated this duty in writing to be in need of relief and shall be bound to pay
such person wage not below the minimum which Government may have fixed in
this behalf. Any disputes which arise in connection with the implementation of this
clause shall be decided by the Superintending Engineer whose decision shall be
final and binding on the piece worker/contractor
40 Employment of Technical Persons.
EW-285 PUR-F-006 RFQ-
The contractors who are registered class ‘A’, ‘B’ and ‘C’ or such contractors who
execute the works of Rs. 5 lakhs and above shall employ the technically qualified
personnel possessing minimum a Diploma from a recognized Technical Institution
executing the work of the corporation.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-285 PUR-F-006 RFQ-
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF
PPEs (PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.: ____________
Authorized signatory of M/s____________________________________
Hereby certify that following mentioned PPEs (as per
ISI/DGMS/CE/EN/ANSI approved only) must be issued to our all contract
workers as per nature of hazards before execution of work.
Sr. Name of PPE IS :Code no. of Make of Qty Unit
1 Safety Helmet IS:2925 Nos.
2 Safety goggles with IS:5983:1980 Nos.
Anti fog lens or EN:166
3 Reusable Ear Plug ANSI S3.19- Pair
4 Dust Mask EN149:2001 Nos.
5 Safety Shoes IS:15298 Pair
6 Cur resistance Hand EN 388:2003 Pair
gloves Cut level-1
If our company is not provided above mentioned good quality of PPE’s, Safety
Officer and Factory manager shall be empowered to stop the work without
Seal of the Firm Signature of Authorized
EW-285 PUR-F-006 RFQ-
ANNEXURE-II: SOP/JOB SAFETY ANALYSIS
Name of Job analyzed:
Tender No. /Work order No.
Name of Agency: Mobile No.
Name of Supervisor: Mobile No.
Name of Section/Department:
Job Location/Area:
Required PPEs and Emergency equipment :(1) Safety Helmet (2) Safety
Shoes (3) Safety Goggles (4) Reusable ear plug (5) Cut resistance hand
gloves (6) Dust mask
Safe operating work procedure should be followed by the
(1) General routine PTW (Energy isolation & Red / Yellow tagging): For
replacement of hoist motor/defect attending, preventive maintenance etc.
works, first ensure that Y/T or PTW must be issued & equipment is isolated
from the supply.
(2) Ensure that required safety precautions as per checklist are taken by
maintenance section.
(3) Display appropriate tags (Red/Yellow) on equipment at site.
(4) Ensure that proper isolation is made by Plant Operator. Power must be off to
the circuit. Confirm the circuit is de-energized.
(5) Fencing Condition should be maintained by the contractor during the job &
after the job if any exist at site.
(6) Before starting the work, ensure to wear a safety belt & Personal Protective
(7) Ensure tools and equipment in good condition.
(8) Ensure Do & Don’t knowledge to the person working with Hand tools.
(9) Clean the surface of the hoist JB and do repairs required of any.
(10) Examine the place of the Repair/maintenance of hoist. In case of broken wire;
replaced by new one.
(11) Install the new motor/contactor/TB to the correct terminals, securely mounting
it in place. Fabrication required if any for the work will be in contractor’s
(12) Ensure to check the new contactor/motor compatibility with the existing wiring
and consider any labeling or function changes needed. Mount the new
contactor in the same location as the old one, using the provided hardware to
secure it firmly.
(13) Ensure the new contactor/motor sits properly at the place & all buttons of
pendent push button are accessible.
(14) Connect all the wires to the corresponding terminals ensuring correct polarity.
(15) After complete assembling of the JB connect earthing points.
(16) Necessary care should be taken to avoid any type of accident/ electrical
shock during maintenance/repairing/replacement work.
(17) Fire extinguisher is available tagged & with valid testing.
(18) Cleaning of hoist and cable trays should be proper.
EW-285 PUR-F-006 RFQ-
(19) Inform to the operator and Control Room about completion of work. On
completion of works, the contractor has to remove all men / material from
work site & render the work place safe in all respect as it was prior to start of
work and return back the Yellow Tag /PTW to operation people.
(20) Operation staff after ensuring safe work condition will close the PTW.
(21) Carefully turn the power back on to the circuit.
(22) Check each button of the pendent push button to verify that they are
operating correctly & performing their intended functions.
(23) Ensure the hoist control box contactors/motors are compatible with the
existing voltage and current requirements of the circuit.
JOB SAFETY ANALYSIS
Job Step Hazard Control Measures Responsibility
Area barricaded.
Fall of Helmet must be used
object by all personal in
from barricading area.
height Safety belt and
Cleaning of /person High necessary Judgads Contractor’s
Deaerator & Its fall from /scaffolding may be Supervisor
Storage Tank height arrange as per
and inside requirement of job.
Close supervision
Exposure Use proper PPE during
to noise work and in high noise
Nozzle & is Contractor’s
perforated trays Supervisor
if requires by machines
cutting, Fire extinguishers
welding/soldering Fire should be kept handy
as per Inst. Of hazard on site during work
EIC. Due care should be
Low taken while
welding/cutting / wiring
Housekeeping must be
ensured at site
Prepared by Checked By Reviewed By Approved By
DE / EE ( EMD-II) SE (Elect) Safety Officer Factory Chief Engineer
NOTE: Please keep copy of this JSA sheet, duly signed by contractor, at site during work
EW-285 PUR-F-006 RFQ-
GSECL Contractor EH&S Performance Evaluation Form
Name of Contract Agency:
Contract work order No.
Date Evaluation Completed:
Work Description:
Name of Power Station:
Status of Work/ Project: _________% completed.
No. of person engaged during work contract:
Total Exposure hours worked on work order:
This evaluation must be completed by Concern EE & SE after completion of
the Work Contract /project and at pre-determined intervals (three months)
as agreed upon at the Pre-Job Mobilization Meeting.
Statistics Number Frequency
Environmental Excursions
Traffic Violations
The following categories should be rated for the Contractor’s overall
performance on the work order/ Project.
RATING (5 = Excellent; 4=Very Good 5 4 3 2
3=Good 2=Satisfactory 1 = Poor)
A. Adherence to Requirements:
Adherence to contract provisions for new
hire orientation.
Compliance to plant safety rules.
Compliance with industrial hygiene
Compliance with site contractor’s health and
safety guidelines.
Compliance with site permits.
Material Safety Data Sheets (MSDS)
Response to safety requests.
B. Housekeeping
Monthly housekeeping inspection results.
Overall site housekeeping practices.
Response to safety requests.
Chemical hazard control
Fire control measures
Flammable and explosive materials control
EW-285 PUR-F-006 RFQ-
General waste – trash collection
C. Injury Performance:
Contractor’s timely reporting of accidents
Contractor’s use of modified work program.
Contractor’s participation in accident
investigations.
Number of incidents observed and reported.
D. Contractor Safety Program:
On site safety officer.
All subcontractors employed by the
Contractor have been managed effectively
with reference to EHS and Quality (meets
company standards, practices and/or
Safety training for supervisors.
Substance abuse policy compliance.
Weekly toolbox meeting and/or participation.
Updates to written safety programs.
E. Tools and Equipment:
Availability of tools and equipment
Condition of contractor’s tools and
equipment by site and provincial Labour and
OH&S standards.
Maintenance of Equipment / Tools / etc.
Contractor’s knowledge and proper use of
Contractor’s equipment certification readily
Contractor’s materials
inspection/acceptance program followed.
F. Costs Within Expectations:
Contractor’s cost program.
Contractor’s reasonableness and/or
G. Execution of Work:
Contractor’s cooperation in handling change
Contractor’s efforts to eliminate
nonproductive time.
Contractor’s planning of work.
Relationship with other site contractors.
Contractor’s cooperation with our company
and other contractor personnel.
H. Key Field Personnel:
Competence of main office staff and
Quality of first and second line supervision.
J. Labour Relations:
Contractor’s ability to anticipate problems.
EW-285 PUR-F-006 RFQ-
Contractor’s efforts in exercising
management rights.
Contractor’s relationship with the building
K. Project management /Supervision:
Contractor’s efforts to use efficient crew size.
Control of subcontractors.
L. Quality of Craft Labour :
Contractor’s ability to obtain qualified
Quality of work.
Contractor’s adherence to schedule
N. Quality Control/Assurance:
Contractor’s equipment certification readily
Contractor’s material inspection /
acceptance program followed.
Contractor meets expectations on quality
O. Issues and Concerns:
Advises of potential problems.
Efficiency in handling paperwork.
Readiness to accept responsibility.
Reliability in dealings.
Response to site requests for action by the
supervisor/ management.
OVERALL PERFORMANCE:
Any specific issues or concerns with the contractor:
Would you hire this contractor again to do similar work:
How can this contractor improve on its past performance:
Evaluation carried out By:
Designation Executive Engineer Superintending Safety Officer
Date Completed:
EW-285 PUR-F-006 RFQ-
Work Agreement Format
STAMP PAPER OF RS. 300/-
This agreement is made at Gandhinagar the ___ day of ________________in
the Christian year two thousand and fourteen between M/s
to as “THE CONTRACTOR” which expression shall unless excluded by or
repugnant to the context include its successors or permitted assigns)of the
one part and the Gujarat State Electricity Corporation Ltd., having their
Head office at Race course Baroda -7 (hereinafter called “GSECL” which
expression shall unless excluded by or repugnant to the context include- its
successors or assigns) of the other part.
WHEREAS the aforesaid GSECL has accepted the tender of the aforesaid
contractors for work ______________________________________at GTPS as per
GSECL’s order No.GPS/Tech/____________________________-
_________________________________dtd.___________ hereinafter called ”The
works” and more particularly described enumerated or referred to in the
specification, terms and conditions prescribed in the order letter, covering
letter and other letters and schedule of price which for the purpose of
identification have been signed by Shri ____________________________________
On behalf of the contractors and by Chief Engineer (Gen.) on behalf of
GSECL a list where of is made out in the schedule hereunder written and all
of which said documents are deemed to form part of this contract and
included in the expression “THE WORKS” wherever herein used, upon the
terms and subject to the conditions herein after mentioned.
AND WHEREAS GSECL has accepted the tender of the contractors for the
construction/work, of the said works for the sum
____________________________________only) upon the terms and subject to the
conditions herein mentioned.
NOW THIS AGREEMENT WITNESS AND IT IS HEREBY AGREED AND
DECLARED THAT: -
1. The contractors shall do and perform all works and things in this
contract mentioned and described or which are implied therein or thereof
from respectively or are reasonably necessary for the work as mentioned and
at the times, in the manner and subject to the terms condition s and
stipulations contained in this contract, and in consideration of the due
provision, executions, work/ construction and completion of the; works
agreed to by the contractors as aforesaid, GSECL both hereby convenant with
the contractor to pay all the sums of moneys as and when they become due
and payable to the contractor under the provisions of the contract Such
payments to be made at such times and in such manner as is provided by
2. This conditions and convenants stipulated herein before in this contract
are subject to and without prejudice to the rights of GSECL to enforce
penalty for delays and/or any other rights what so ever including the right to
reject and cancel on default or breach by the contractors of the conditions
and the covenants as stipulated in the general conditions, specifications,
forms or tender, schedule drawing etc. attached with GSECL’s order No
EW-285 PUR-F-006 RFQ-
3. The contract value, extent of supply delivery dates, specifications and
other relevant matters may be altered by mutual agreement and if so altered
shall not be deemed or constructed to means or apply to affect or alter other
terms and conditions of the contract and the general conditions and the
contract so altered or revised shall be and shall always be deemed to have
been subject to and without prejudice to said stipulation.
List of documents forming part of the contract :-
1. Original tender
3. Tender & contract for works booklet.
4. General specifications for civil works book.
In witness whereof the parties hereto have set their hands and seals
this day, month and year first above written.
1. Signed, Sealed and delivered by (Contractor)
(Signature with Name, Designation & official seal / stamp)
(Contractor) (Complete Name, Address of the authorised person of
the Supplier with Authority letter or Board’s Resolution in case of
In the presence of Name, full Address & Signatures:
EW-285 PUR-F-006 RFQ-
2. Signed, Sealed and Delivered by (Purchaser-GSECL):
(Signature with Name, Designation & official seal / stamp)
(Purchaser-GSECL),
(Complete Name, Designation & Location / Address of the
authorized officer as per DOP of the Purchaser Company)
In the presence of Name, full Address & Signatures:
EW-285 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
e-mail: [email protected] ; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
(Price Bid should be submitted by bidders directly online. Bidder should not
submit physical Price Bid.)
Work of cleaning & inside inspection of Deaerator during
EW-285 AOH/COH or as & When Required of Unit No 3, 4 & 5 at
Offered GST Rate Total Ex Total End
Rate per Applicable With Cost Cost
Sr. Qty. UO Unit in Rs. [in GST Amount Amount
Description HSN
No. (A) M Without Percentage in Rs. in Rs. in Rs.
Cleaning of Deaerator &
Its Storage Tank and
inside inspection,
resetting, repairing of
1 Nozzle & is perforated 06 Job To be quoted in attached Price break up
trays if requires by
cutting, welding/soldering
as per scope of work &
instruction of EIC.
(1) Goods and service tax:- The GST rate will be paid extra as applicable in
accordance with GST rules party shall have to raise the invoice in duplicate as
per GST rules. The supplier/contractor should mention separate HSN/SAC
code and rate of GST and cess as applicable for each item of goods/services. If
no specifically mentioned then company will have option to take the prices as
exclusive of taxes and duties at maximum higher slab rates for the evaluation
(2) Payment Terms: Party has to accept payment terms as per GSECL rules only
i.e. as per actual work done. NO ADVANCE payment will be allowed.Net
Payment will be released within 30 days after completion of work and
submitting their relevant invoices.
(3) L1 is considered on over all lowest quoted party.
(4) Quantity mentioned is tentative; however payment will be done as per actual
executed quantity.
(5) GST No. & SAC/HSN Code must be required in Bill/Invoice.
Chief Engineer (Gen)
Contractor’s Signature
With Seal & Date
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-285_12_05_2026.pdf
GTPS_Tender _ EW-285_12_05_2026.pdf
CORRIGENDUM
Download all tender documents and submit your bid