| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.1 Cr+₹18.5 L (21.0%)Rejected-AOC A 216 217 218 CITI TOWER SECTOR 15 CBD BELAPUR NEW MUMBAI 400614 | NEW MUMBAI | THANE | MAHARASHTRA | 400614 | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.1 Cr+₹21.9 L (24.9%)Rejected-AOC 118 ANNAPOORNA BLDG SECTOR 18 VASHI NAVI MUMBAI 400705 | NAVI MUMBAI | THANE | MAHARASHTRA | 400705 | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.1 Cr+₹23.5 L (26.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Eligible |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
28 Sept 2020, 5:00 pmClosed
Superintending Engineer (Elect-Proj.)
For further details regarding the above, contact Executive Engineer (ELECTAP), CIDCO Ltd., 8th floor, Raigad Bhavan, CBD-Belapur, Navi Mumbai. Tel. No 022-67121069.
Repairs, Operation and Comprehensive Maintenance of Smart LED Street Lighting on various roads at R and R Pocket No. 1,2,3,4,5 and 6 at Vadghar and Vahal, Navi Mumbai for Three Years.
2020_CIDCO_605744_1
CANo04/CIDCO/EE(ELECTAP)/20-21
Open Tender
Support/Maintenance Service
Lump-sum
1095 days
CIDCO LTD.
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
via Payment Gateway
₹1.0 L
Yes
25 Feb 2021
25 Aug 2020
9 Oct 2020
25 Aug 2020
28 Sept 2020
25 Aug 2020
Amount
Schedule "A"
Operation & Comprehensive maintenance of Smart LED Street lighting based on R.F. Technology for Data communication with server provided at R&R Pocket No. 1, 2, 3, 4, 5 & 6 at Vadghar & Vahal. Before quoting of the Tender the agency has to verify the installations at site by their own. The agency has to take over the installations as is where is basis. After taking over the installations, the agency has to carry out the repairs of all non working installations by replacing / repairing as per the site requirement within 2 months from issue of work order. The scope of work involve are as under: - 1) Supply, Erection, Testing & Commissioning of electrical accessories for restoration of non working street lights by providing required material such as Potted Drivers, SMPS, Cables, Wires, Fixtures, Panel Materials etc. 2) Providing minimum skilled and experienced Manpower by fulfilling the required minimum wages to the deputed manpower as below for day to day Operation & Comprehensive maintenance of LED street lights. Supervisior-1No. Electricians-2Nos. Helpers-2Nos. Office Boy - 1 No. 3) Data management includes Generation, Maintenance & Corrective action based on data information of complete street light installation. In case of any modification or upgradation of the existing system is the part of work and the same will be carried out by the agency. 4) Weekly progress report regarding corrective action at site to ensure proper operation of street light installation. 5) Payment of necessary charges of service provider for Data management of complete Street Light installation throughout the entire period. 6) Shifting of Pole, feeder pillar as an when request made by developer. 7) Ensuring the continuous healthy uninterrupted Power Supply at all time to the installations in co-ordination with MSEDCL. 8) The use of cable fault locator to find out underground cable fault in order to reduce damage of footpath. 9) Reinstatement of road / footpath after resolving the cable fault issues i.e. to make surface as it was. 10) Ensuring proper connection of street lights, earthing connections & street lights control panels. 11) Ensuring proper watch & ward and preventing the street light installations including power supply. In case of accurance of theft, FIR to be lodge by the agency and replacing the theft material immediately for proper operation of street light installation and follow up by the agency with concern Insurance company for theft claim. 12) Co-ordination with the concern department to ensure timely payment of energy bills. Delay payment charges of energy bill will be deducted from R.A. bills of agency. 13) The repairs of non-working fittings shall be attended by the agency within 48 hrs. period. If failed to attend then penalty charges of Rs. 1000/day/installation will be recovered from R.A. Bills of agency. 14) Initially the work order will be issued for the period of 12 Months only. After observation of satisfactory performance of agency the work order for the further period of consecutive 12 months will be issued to the agency..
J.J.ELECTRIC
HITECH CONSTRUCTION GROUP
Jayes Electricals
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .