Tender Value
₹6.7 L
EMD Value
₹8,400
Closing Date
29 Sept 2026, 4:30 pm2d left
Public Works Department
PRAVEEN R HULJI
Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27(Reserved for SC Category only).
PWD/2026-27/RD/WORK_INDENT42802
PWD/2026-27/RD/WORK_INDENT42802
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
9 documents required · 9 mandatory
₹500
₹8,400
12 Sept 2026
12 Sept 2026
28 Sept 2026
PUBLIC WORKS DEPARTMENT
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, BELAGAVI DIVISION, BELAGAVI
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, SUB-DIVISION, BAILHONGAL.
: Head of Account : ¥ÁåPÉÃeï-2
3054-04-337-1-10-200 MDR Maintenance for the year 2026-27
: Name of Work : NAME OF WORK:
Name of the work:Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27
ESTIMATED COST : Rs 7.88 Lakhs.
HalagaTigadiTarihal road from Km 8.80 to19.15 SH31 to Gaddikoravinakoppa road from Km 0.00 to 6.20 Sampagoan MK Hubli via Pattihala KS from Km 0.00 to 0.39 and From Km 5.42 to 11.32 Approach road to SH-31 from Kallurfrom Km 0.00 to 0.65 Road Joining SH 138 to SH 31 Via Lakkundi Nagnanur From Km. 0.00 to Km. 7.00 Navalagatti p kendra to Hiremale P Kendra from Km 0.00 to 5.50 Pattihala K S to Neginhala from Km 0.00 to 5.00 Sampagoan Bailhongal via Chivatagundi from Km 0.00 to 4.00,from Km 6.00 to 15.53 & from Km 14.90 to 14.93 Deshnoor-Mattikoppa from Km 0.00 to 2.38 from Km 3.09 to 5.50Hanabaratti to Ramalingappanakolla from Km 0.00 to 5.00 Madhanabhavi-somanatti from Km 0.00 to 5.00 Hanumanatti-Hiremale via Bairanatti, Hannikeri from Km 0.00 to 7.00 Nesaragi Somanatti from Km 0.175 to 0.450, From Km 5.75 to 6.90 and From Km 7.05 to 8.50 Vannur-SH-31 via Sunakumpi from Km 0.00 to 11.00 of Bailhongal Taluka
PARAGRAPH 130(A) OF THE KARNATAKA PUBLIC WORKS
DEPARTMENTAL CODE.
E S T I M A T E.
Division. : Executive Engineer, PW Dept. Belagavi Division, Belagavi
Sub-Division . : AEE, PWD Sub-Dn. Bailhongal.
Fund Head. : 3054-04-337-1-10-200 MDR Maintenance for the year 2026-27
Service Head. :
Departmental Head. :
Estimate framed in the office of the Assistant Executive Engineer, P.W.D. Sub-Division, Bailhongal and probable expenses that will be incurred for the work of Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27 Under HoA 3054-04-337-1-10-200 MDR Maintenance
Estimated Cost. : Rs.7.88 Lakhs
Administratively sanctioned under : No.____________Date ___________
Technically sanctioned under : No.____________Date ___________
Estimate Prepared by : Shri. Ravi Happali, AE
Estimate Checked by : Shri.Anil M, AEE
(Call or Authority) :
" Separate Sheet Enclosed "
Name of the work:Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27
P.W.D. CODE PARA-133
C E R T I F I C A T E
This to certify that, Anil M, Assistant Executive Engineer, have personally visited the spot and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
C E R T I F I C A T E
(As required vide G.O.No.PWD.SL.CMS.96 Dtd: 27-6-1991)
Certified that, sufficient care has been taken while preparing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work in sufficient quantity are included while preparing the estimate, and specification of items included are completed and correct.
C E R T I F I C A T E
Certified that, the work proposed in this estimate has not been taken up under any other head / programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
Name of the work:Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27
ಬೈಲಹೊಂಗಲ ಉಪವಿಭಾಗದ Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27 Under HoA 3054-04-337-1-10-200 MDR Maintenance ಕಾಮಗಾರಿಯು ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ : 2026-27 ನೇ ಸಾಲಿನ 3054-04-337-1-10-200 ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಅನುದಾನದಡಿ ರೂ. 7.88 ಲಕ್ಷಗಳಿಗೆ ಕಾರ್ಯಕ್ರಮ ಪಟ್ಟಿಯಲ್ಲಿ ಅನುಮೋದನೆಗೊಂಡಿರುತ್ತದೆ. ಸದರಿ ರಸ್ತೆಯ ಭಾಗಗಳಿಗೆ ನಿರ್ವಹಣೆಗಾಗಿ ಈ ಕೆಳಕಂಡ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಿ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ತಯಾರಿಸಲಾಗಿದೆ.
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
ಸದರಿ ಅಂದಾಜು ಪಟ್ಟಿಯನ್ನು 2023-24 ನೇ ಸಾಲಿನ (2026-27 ಕ್ಕೆ ಮುಂದುವರೆದ) ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ, ಏಕರೂಪ ದರಪಟ್ಟಿಯಂತೆ ದರಗಳನ್ನು ಅಳವಡಿಸಿ ರೂ. 7.88 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಿ ತಾಂತ್ರಿಕ ಮಂಜೂರಾತಿಗಾಗಿ ಸಲ್ಲಿಸಲಾಗಿದೆ.
Name of the work:Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27
Recaptulation sheet
Sl. No. Description Amount KPPP
1 For Annual Maintenance Rs. 666,671.66 666678.74
4 Add for Misc & Rounding off Rs. 1,327.44 1319.09
Grand Total Rs. 788000 788000
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Divn Bailhongal Public Works Dept., Divn Belagavi
Name of the work:Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27
ESTIMATE (ABSTRACT) - PART-A
Sl. No. Description of Item Unit Qty. Qty. Total Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. 100 m2 107.78 129.60 237.38 393.00 93288.38
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. m 2874.00 600.00 3474.00 6.00 20844.00
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . m2 1437.00 0.00 1437.00 39.00 56043.00
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . m2 86.22 0.00 86.22 97.00 8363.34
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 179.63 165.00 344.63 388.00 133714.50
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 179.63 330.00 509.63 635.00 323611.88
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . m2 45.00 253.91 298.91 27.00 8070.57
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. No 2.00 8.00 10.00 2047.00 20470.00
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Km 5.00 6.00 11.00 206.00 2266.00
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work:I) Deshnoor-Mattikoppa from Km 0.00 to 2.38 & from Km 3.09 to 5.50
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 2.38 Km 1 5.00 5.00
In Lakhs 3.706395222
Assistant Executive Engineer, Executive Engineer, 666671.66
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of Work:Road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
4 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. 200.50
5 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, 200.50
6 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. 200.50
Chainage Km 3.00 to 9.00 No 8 8.00 0 1.663
7 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. 200.50
Total Qty 6.00 206.00 1236
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of the work:Annual Maintenance to Deshanura-Mattikoppa Road from km. 0.00 to 2.38 & from 3.09 to 5.50 in Kittur constituency of Bailhongal taluk and Annual Maintenance to the road connecting Raichur Bachi Road (SH) to Bagewadi Bassapur from 3.00 to 9.00 in Kittur constituency of Bailhongal taluk for the year 2026-27
S No Description of work SR Vol Page No Item No Basic Rate Area Wtage 0% Add 18% for GST Finished Rate Unit
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. Vol-III 9 2.5 a 393.00 0.00 0.00 393.00 100 m2
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Vol-III 147 16.19 6.00 0.00 0.00 6.00 m
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . Vol-III 91 10.3 39.00 0.00 0.00 39.00 m2
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . Vol-III 91 10.2 97.00 0.00 0.00 97.00 m2
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (i) 263.00 0.00 0.00 388.00 m2
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (ii) 497.00 0.00 0.00 635.00 m2
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . Vol-III 148 16.26 27.00 0.00 0.00 27.00 m2
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. Vol-III 147 16.20 (i) 2047.00 0.00 0.00 2047.00 No
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Vol-III 148 16.24 (i) 206.00 0.00 0.00 206.00 Km
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: L) Hanumanatti-Hiremale via Bairanatti, Hannikeri from Km 0.00 to 7.00
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 7 Km 1 7.00 7.00
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 7000.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 4.00 #REF! #REF!
Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 5 3.00 15.00
Total Qty 15.00 #REF! #REF!
Grant 5.44 GST 18% #REF! 580000
Check #REF! Total #REF! #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: D) Approach road to SH-31 from Kallur Basaweshwar Temple from Km 0.00 to 0.65
SL No Description of work Unit No Measurement Qty Rate Amount
Chainage Breakdown From To
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. 4.5
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs m2 2 5.00 1.50 15.00
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs Each 1 1.00 1.00
Total Qty 2.00 #REF! #REF!
Grant #REF! #REF! 65000
Assistant Executive Engineer, Executive Engineer, #REF!
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: Annual maintenance of Halaga-Tarihal-Tigadi road in Kittur constituency of Bailahongala taluk for the year 2026-27road from Km 8.80 to19.15
SL No Description of work Unit No Measurement Qty Rate Amount
Chainage Breakdown From To
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. 4.5
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs m2 22 5.00 1.50 165.00
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs Each 11 1.00 11.00
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Total Qty 0.00 #REF! #REF!
Total Qty 0.00 #REF! #REF!
Total Qty 14.00 #REF! #REF!
At Chainage KM. Each 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
CC roads 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
CC roads 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
For curves No 0 5.00 0.00
Total Qty 0.00 #REF! #REF!
18 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator
Total Qty 50% 0.00 #REF! #REF!
19 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Selected reaches Total Qty 40% 0.00 #REF! #REF!
6.64 #REF! #REF!
Assistant Executive Engineer, Executive Engineer, 588000
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi #REF!
Name of work: B)SH-31 to Gaddikoravinakoppa MK Hubli road from Km 0.00 to 6.20
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 6.2 Km 1 6.00 6.00
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 6200.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
At Chainage KM. 6.2 Each 1 1.00 1.00
Total Qty 1.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 5 3.00 15.00
Total Qty 15.00 #REF! #REF!
Grant 5.12 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: C)Sampagoan-MK Hubli via Pattihala KS from Km 0.00 to 0.39 and From Km 5.42 to 11.32
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 390.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 8.00 #REF! #REF!
At Chainage KM. 6.2 Each 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 7 3.00 21.00
Total Qty 21.00 #REF! #REF!
Grant 4.98 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: E) Road Joining SH 138 to SH 31 Via Lakkundi Nagnanur From Km. 0.00 to Km. 7.00
SL No Description of work Unit No Measurement Qty Rate Amount
Chainage KM. 3.2 to 7 3.20 7.00 3800 5.5
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 2850.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 3.00 #REF! #REF!
At Chainage KM. 6.2 Each 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 2 3.00 6.00
Total Qty 6.00 #REF! #REF!
Grant 4.33 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: F)Navalagatti punarvasti kendra to Hiremale Punarvasti Kendra from Km 0.00 to 5.50
SL No Description of work Unit No Measurement Qty Rate Amount
Chainage Breakdown From To
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs m2 6 5.00 1.50 45.00
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs Each 3 1.00 3.00
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Total Qty 0.00 #REF! #REF!
Total Qty 0.00 #REF! #REF!
Total Qty 4.00 #REF! #REF!
At Chainage KM. Each 1 1.00 1.00
Total Qty 1.00 #REF! #REF!
CC roads 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
CC roads 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
For curves No 3 3.00 9.00
Total Qty 9.00 #REF! #REF!
18 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator
Total Qty 50% 0.00 #REF! #REF!
19 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Selected reaches Total Qty 40% 0.00 #REF! #REF!
4.26 #REF! #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work:G) Pattihala K S to Neginhala from Km 0.00 to 5.00
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 5 Km 1 5.00 5.00
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 5000.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
At Chainage KM. 1.000 Each 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 5 3.00 15.00
Total Qty 15.00 #REF! #REF!
Grant 3.87 GST 18 % #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: H) Sampagoan-Bailhongal via Chivatagundi-Bailwad,Bailwad Varti from Km 0.00 to 4.00, from Km 6.00 to 15.53 & from Km 14.90 to 14.93
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 5.6 Km 1 1.90 1.90
Chainage KM. 5.6 to 6.51 Km 1 1.90 1.90
Chainage KM. 6.51 to 7.8 Km 1 1.90 1.90
Chainage KM. 7.8 to 10 Km 1 1.90 1.90
Chainage KM. 11 to 14.69 Km 1 1.90 1.90
Chainage KM. 14.9 to 15.53 Km 1 1.90 1.90
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 5600.00 0.15 2.0% 0.00
(As per requirement) Sqm 0 910.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 1 3.00 3.00
Total Qty 3.00 #REF! #REF!
18 Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator
Total Qty 20% 641.25 #REF! #REF!
19 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Total Qty 20% 64.13 #REF! #REF!
Grant 8.30 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work:J) Hanabaratti to Ramalingappanakolla from Km 0.00 to 5.00
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 5 Km 1 5.00 5.00
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 5000.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
At CH.5.00 Km Ramalingappankolla Tourist Place Each 1 1.00 1.00
Total Qty 1.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 4 3.00 12.00
Total Qty 12.00 #REF! #REF!
Grant 3.80 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work:K) Madhanabhavi-somanatti from Km 0.00 to 5.00
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 3 Km 1 4.00 4.00
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 3000.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
Total Qty 1.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 3 3.00 9.00
Total Qty 9.00 #REF! #REF!
Considering 20% 20% Total Qty Sqm 1500.00 #REF! #REF!
Considering 20% 20% Total Qty m3 225.00 #REF! #REF!
Grant 3.86 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work: M)Nesaragi Somanatti from Km 0.175 to 0.450, From Km 5.75 to 6.90 and From Km 7.05 to 8.50
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 4325.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 4 3.00 12.00
Total Qty 12.00 #REF! #REF!
Grant 5.08 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Name of work:N) Vannur-SH-31 via Sunakumpi-Mastamardi-Gajamanahala-Hanabarahatti from Km 0.00 to 11.00
SL No Description of work Unit No Measurement Qty Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 0.00 39.00 0.00
5 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 0.00 97.00 0.00
6 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
8 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
9 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
10 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Chainage KM. 0 to 11 Km 1 4.00 4.00
(As per requirement) No 0 1.00 0.00
Total Qty 0.00 #REF! #REF!
(As per requirement) Sqm 0 11000.00 0.15 2.0% 0.00
Total Qty 0.00 #REF! #REF!
Total Qty 5.00 #REF! #REF!
At Chainage KM. 1.000 Each 1 1.00 1.00
Total Qty 1.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For CC roads only) 0 50.00 0.00
m Total Qty 0.00 #REF! #REF!
(For curves only) No 1 3.00 3.00
Total Qty 3.00 #REF! #REF!
Grant 5.82 GST 18% #REF!
Check #REF! Total #REF!
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Halaki tanda murgod 0 to 0.100 0 to 1.5
malagali obbaladinni hirebudunur 0 to 0.5 3.7 to 4.8 5.7 to 7.00 0.0 to 0.5 1 to 2.5 3.7 to 4.8 5.5 to 7.500
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Formats and govt GOs.zip
Others - Formats and govt GOs.zip • 20.38 MB
Deshnur Bagewadi Pk23.xlsx
Others - Deshnur Bagewadi Pk23.xlsx • 0.26 MB
MDR programme.pdf
Others - MDR programme.pdf • 8.49 MB
42802 BID DOC SC KW-1.doc
Tender Document • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .