Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC | ₹25.4 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹26.9 LRejected-AOC | ₹26.9 L | L2 | Rejected-AOC 2nd Lowest |
Tender Value
₹24.2 L
EMD Value
₹48,451
Closing Date
22 May 2026, 3:00 pmClosed
The Executive Engineer DWS Division Agartala-I
O/O the Executive Engineer DWS Division Agartala-I
GS sheet roofing and walling Boundary wall Boundary fencing Brick work Repairs to plaster Painting Flooring Wiring Lighting Plinth Protection Steel Work Jungle cutting Plantation etc. and other allied works under DWS Sub Division IV Jogendranagar
2026_Urban_73018_1
15/EE/DWS-I/2026-27
Open Tender
Civil Works - Water Works
365 days
Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹48,451
30 Jun 2026
16 May 2026
22 May 2026
16 May 2026
22 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 85 | Cum | 231.6 | ₹19,686 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
All kinds of soil | 35 | Cum | 161.3 | ₹5,645.5 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 22 | Cum | 1,177.3 | ₹25,900.6 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level | |||||
| 4.01 | 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | 18 | Cum | 9,295.7 | ₹1,67,322.6 |
| 4.02 | 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 8 | Cum | 10,742.6 | ₹85,940.8 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
All work upto plinth level
i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 2 | Cum | 11,080.4 | ₹22,160.8 |
| 6 | Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required. | 250 | kg | 109.6 | ₹27,400 |
| 7 | First class brick work in foundation and plinth
including cost of all materials as required complete:-
i) In cement mortar 1:4 (1 cement : 4 fine sand) | 40 | Cum | 9,845.2 | ₹3,93,808 |
| 8 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
6.3.3 In cement mortar 1:4 ( 1 cement : 4 fine sand). | 5 | Cum | 11,410.19 | ₹57,050.95 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74307.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.19 MB
DNIT.pdf
Tender Documents • 2.43 MB
BOQ_74307.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid