Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹4.0 Cr Quoted ₹4.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 Cr+₹89.7 L (21.8%)Rejected-Finance 303 SURABHI LOTUS NAGARJUNA NAGAR COLONY AMEERPET AMEERPET HYDERABAD TELANGANA 500073 | HYDERABAD | TELANGANA | 500073 | ₹5.0 Cr+₹89.7 L (21.8%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
23 Jul 2021, 3:00 pmClosed
Mr. Ayyappan COO
No.4,Rajiv Gandhi Salai,Tharamani,Chennai,600113
Supply Erection Installation Testing and Commissioning of HRU
2021_TIDEC_203581_1
TIDEL/2021-2022/01
Open Tender
Supply, Erection and Commissioning
Supply
210 days
Tidel Park Ltd Chennai
As per Tender
3 documents required · 3 mandatory
₹0
₹5 L
Tidel Park Ltd Chennai
25 Sept 2021
24 Jun 2021
26 Jul 2021
24 Jun 2021
23 Jul 2021
9 Jul 2021
24 Jun 2021 - 7 Jul 2021
7 Jul 2021
Amount
Design, supply, installation, testing & commissioning of floor mounted Heat Recovery Unit (HRU) with following Technical Specification mentioned in Technical tender document.
Dismantling of HRW unit
Dismantling of Plenum
Dismantling of Existing duct along with insulation at terrace till VCD
Supply and erection of 22G Ducting from plenum to VCD at Terrace
Supply and erection of 25mm thick double skin plenum sandwiched with PUF of 38 kg/cu m density
Shifting of New HRW and Plenum materials to terrace and shifting of old dismantled units from terrace to storage yard -Manual rigging.
Shifting of New HRW and Plenum materials to HRU rooms and shifting of old dismantled units from rooms to storage yard -Manual rigging.
Civil works for opening and replastering of HRU rooms
Insulation of supply and return aor duct with 50MM thick EPS covered with 24G Al.Cladding
Structural support and brazing angles for ducting
Supply & installation of Star Delta Starter panel with Variable frequency drive for HRW Lower tier motor capacity of 7.5 KW. The make of VFD is DANFOSS / ABB /EQUIVALENT
Supply & installation of DOL Starter panel with Variable frequency drive for HRW Upper tier motor capacity of 5.5 KW. The make of VFD is DANFOSS /ABB / EQUIVALENT
Supply & laying of copper armoured cable from panel to HRW unit. The make of cable is POLYCAB / FINOLEX / EQUIVALENT
Supply & laying of GI earthing from panel to HRW unit.
CEIG Approval and related miscellances charges
Buyback of Old Items as mentioned above Less: Removed old HRU and its accessories as mentioned in the sl.no 2,3 and 4 (rate includes loading and unloading and transportation, etc.) (B)
Integrated Cleanroom Technologies Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .