Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹6.4 L+₹98,660.02 (18.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹6.7 L+₹1.3 L (23.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹6.9 L+₹1.5 L (26.6%)Admitted-Fee/PreQual/Technical/Finance NEW MARKET CHURCHA COLLIERY CHURCHA COLLIERY CHURCHA COLLIERY KORIYA CHHATTISGARH 497339 | KOREA | CHHATTISGARH | 497339 | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.4 L+₹1.9 L (35.5%)Admitted-Fee/PreQual/Technical/Finance AT KANDSAR P O BAHIMAR P S KATKAMSANDI DIST HAZARIBAG JHARKHAND | NA | NA | 835201 | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MANOJ KUMAR JAISWAL L3 | TULACHAND GUPTA L7 | satish kumar singh L5 | Rohit Kumar Singh L1 | ravindra kumar gupta L4 | MERAJ AHMAD L2 | MANOJ KUMAR YADAV L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Hard rock (blasting prohibited) | 31.36 | cum | 437 ₹13,704.32 | 70 ₹2,195.2 Lowest | 477.32 ₹14,968.65 | 352.29 ₹11,047.81 | 446.2 ₹13,992.83 | 416 ₹13,045.76 | 486.81 ₹15,266.36 |
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 31.36 | cum | 88 ₹2,759.68 | 70 ₹2,195.2 Lowest | 97.08 ₹3,044.36 | 71.65 ₹2,246.94 | 90.76 ₹2,846.23 | 84.6 ₹2,653.06 | 99.01 ₹3,104.95 |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 22.4 | CUM | 2,953 ₹66,147.2 | 2,600 ₹58,240 | 3,221.86 ₹72,169.62 | 2,377.96 ₹53,266.3 Lowest | 3,012.13 ₹67,471.71 | 2,808 ₹62,899.2 | 3,285.96 ₹73,605.5 |
| 4.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.1 | cum | 2,477 ₹64,649.7 | 2,050 ₹53,505 | 2,703.49 ₹70,561.1 | 1,995.37 ₹52,079.16 Lowest | 2,527.5 ₹65,967.75 | 2,356.22 ₹61,497.34 | 2,757.28 ₹71,965.01 |
| 5.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 46.2 | cum | 3,172 ₹1,46,546.4 | 2,900 ₹1,33,980 | 3,461.86 ₹1,59,938.05 | 2,555.1 ₹1,18,045.62 Lowest | 3,236.51 ₹1,49,526.76 | 3,017.18 ₹1,39,393.72 | 3,530.74 ₹1,63,120.19 |
| 6.01 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 102.4 | sqm | 331 ₹33,894.4 | 80 ₹8,192 Lowest | 361.81 ₹37,048.9 | 267.03 ₹27,343.87 | 338.2 ₹34,631.68 | 315.33 ₹32,289.79 | 369.01 ₹37,786.62 |
| 7.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 5,544 | kg | 43 ₹2,38,392 | 68 ₹3,76,992 | 47.52 ₹2,63,436.08 | 35.07 ₹1,94,428.08 Lowest | 44.4 ₹2,46,153.6 | 41.41 ₹2,29,577.04 | 48.46 ₹2,68,662.24 |
| 8.01 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,866.4 | kg | 50 ₹93,320 | 68 ₹1,26,915.2 | 55.2 ₹1,03,024 | 40.74 ₹76,037.14 Lowest | 51.6 ₹96,306.24 | 48.11 ₹89,792.5 | 56.29 ₹1,05,059.66 |
| 9.01 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 202.56 | kg | 39 ₹7,899.84 | 90 ₹18,230.4 | 43.16 ₹8,743.03 | 31.85 ₹6,451.54 Lowest | 40.35 ₹8,173.3 | 37.62 ₹7,620.31 | 44.02 ₹8,916.69 |
Tender Value
₹16.8 L
EMD Value
₹21,100
Closing Date
7 Sept 2026, 5:00 pmClosed
SO(Civil), SECL, Baikunthpur Area
SO(Civil), SECL, Baikunthpur Area
Repair of DG set Foundation at Churcha (RO) Sub Area of Baikunthpur Area
2026_SECL_364314_1
SECL/BKP/ DGM(C) / e-T / 32
Open Tender
Civil Works - Others
Item Rate
45 days
Churcha
Please refer Tender documents.
3 documents required · 3 mandatory
₹21,100
15 Sept 2026
27 Aug 2026
9 Sept 2026
28 Aug 2026
7 Sept 2026
28 Aug 2026
27 Aug 2026 - 31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Hard rock (blasting prohibited) | 31.36 | cum | 921.99 | ₹28,913.75 |
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 31.36 | cum | 187.52 | ₹5,880.56 |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 22.4 | CUM | 6,223.41 | ₹1,39,404.33 |
| 4.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.1 | cum | 5,222.12 | ₹1,36,297.27 |
| 5.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 46.2 | cum | 6,687.01 | ₹3,08,939.64 |
| 6.01 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 102.4 | sqm | 698.87 | ₹71,564.41 |
| 7.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 5,544 | kg | 91.79 | ₹5,08,858.57 |
| 8.01 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,866.4 | kg | 106.62 | ₹1,99,003.28 |
| 9.01 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 202.56 | kg | 83.37 | ₹16,888.22 |
stage.html
html • 0.03 MB
finance_377223.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 0.83 MB
BOQ_377223.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .