| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.3 LAdmitted-Fee/PreQual/Technical/Finance MALAYATHIL HOUSE PAZHAMALLUR P O KUTTILANGADI 676506 | KUTTILANGADI | MALAPPURAM | KERALA | 676506 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹68.4 L+₹1.0 L (1.56%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹68.5 L+₹1.2 L (1.71%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹71.4 L+₹4.1 L (6.02%)Admitted-Fee/PreQual/Technical/Finance NALLATT KOTTAKKAL | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹72.8 L+₹5.5 L (8.10%)Admitted-Fee/PreQual/Technical/Finance P W D CONTRACTOR REG NO 2A T B CONSTRUCTION | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Muhammed Musthafa M L1 | VISHNU BABU L3 | JUNAIS K L2 | Balakrishnan Thottiyattil L5 | N KRISHNANKUTTY L4 | ABDULLATHEEF P M L7 | ABDUL MUHIZ CA L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Detailed estimate cum abstract -Civil work | ||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 224.09 | cum | 268.95 ₹60,269.27 Lowest | 280 ₹62,745.48 | 273 ₹61,176.84 | 290.4 ₹65,076.03 | 280 ₹62,745.48 | 305.5 ₹68,459.8 | 297.37 ₹66,637.94 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 12.78 | cum | 97.95 ₹1,251.31 Lowest | 100 ₹1,277.5 | 99.5 ₹1,271.11 | 105 ₹1,341.38 | 103 ₹1,315.83 | 111.2 ₹1,420.58 | 108.31 ₹1,383.66 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 28.55 | cum | 5,931.21 ₹1,69,353.84 Lowest | 6,100 ₹1,74,173.3 | 6,023 ₹1,71,974.72 | 6,409 ₹1,82,996.18 | 6,200 ₹1,77,028.6 | 6,736.1 ₹1,92,335.86 | 6,557.86 ₹1,87,246.58 |
| 1.00 | OD289341/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work upto plinth level | 83.65 | cum | 8,141.84 ₹6,81,081.2 | 8,000 ₹6,69,216 Lowest | 8,268 ₹6,91,634.74 | 8,801 ₹7,36,221.25 | 8,555 ₹7,15,642.86 | 9,246.7 ₹7,73,504.95 | 9,002.04 ₹7,53,038.65 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 9,620.58 | kilogram | 84.05 ₹8,08,609.75 Lowest | 88 ₹8,46,611.04 | 85.4 ₹8,21,597.53 | 91 ₹8,75,472.78 | 88 ₹8,46,611.04 | 95.5 ₹9,18,765.39 | 92.93 ₹8,94,040.5 |
| 1.01 | OD289340/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work above plinth level upto floor V level | 83.07 | cum | 9,662.98 ₹8,02,742.4 Lowest | 9,700 ₹8,05,817.8 | 9,813 ₹8,15,205.16 | 10,445 ₹8,67,707.93 | 10,250 ₹8,51,508.5 | 10,974.3 ₹9,11,679 | 10,683.89 ₹8,87,553.48 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 13,728.17 | kg | 84.05 ₹11,53,852.27 Lowest | 88 ₹12,08,078.52 | 85.4 ₹11,72,385.29 | 91 ₹12,49,263.02 | 91 ₹12,49,263.02 | 95.5 ₹13,11,039.76 | 92.93 ₹12,75,758.37 |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 9.04 | cum | 6,096.24 ₹55,134.39 Lowest | 7,000 ₹63,308 | 6,190 ₹55,982.36 | 6,590 ₹59,599.96 | 6,585 ₹59,554.74 | 6,923.5 ₹62,616.13 | 6,740.33 ₹60,959.54 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 181.41 | cum | 238.11 ₹43,195.06 Lowest | 245 ₹44,444.96 | 241 ₹43,719.33 | 256 ₹46,440.45 | 250 ₹45,352 | 270.4 ₹49,052.72 | 263.27 ₹47,759.28 |
Tender Value
₹82.7 L
EMD Value
₹50,000
Closing Date
14 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, PWD BUILDINGS DIVISION, CIVIL STATION, MALAPPURAM, 676505
This proposed building has Two floors with 3 class rooms staircase and Head room . Foundation proposed to G plus 2 Stories .The total plinth area is 307.28sqm .The footings are considered Isolated footing etc
2026_PWD_867503_1
BL/DN/MPM/16/2026-27
Open Tender
Civil Works - Buildings
Item Rate
GHSS EZHUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
28 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed estimate cum abstract -Civil work | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 224.09 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 12.78 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 28.55 | cum | - | - |
| 1.004 | OD289341/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work upto plinth level | 83.65 | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 9,620.58 | kilogram | - | - |
| 1.006 | OD289340/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately.All work above plinth level upto floor V level | 83.07 | cum | - | - |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 13,728.17 | kg | - | - |
| 1.008 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 9.04 | cum | - | - |
| 1.009 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 181.41 | cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1468992.xls
BOQ • 0.35 MB
SBDEZHUR.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .