Tender Value
Refer Docs
EMD Value
₹63,300
Closing Date
30 Jul 2026, 5:00 pm4d left
E.O. NPP BISALPUR
NPP BISALPUR
Construction of coverd nala Kashyap ji Hotel toword kanha goushala
2026_DOLBU_1156943_4
857/nppb/2026-27
Open Tender
Civil Works
Percentage
60 days
NPP BISALPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,450
Yes
EO NPP BISALPUR
₹63,300
Yes
30 Jul 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of work | |||||
| 1.01 | Earth work in filling/cutting cartage up to 5.0 km excluding royality | 1,980 | cum | 274 | ₹5,42,520 |
| 1.02 | supply and laying of empty cement bags filled with local sand ,earth and cartage up to site of work including stiching loading and unloading stacking and also including supply of all material labour T&P required for proper completion of the work etc as per direction of Engineer In charge As Per S.I No- New Item 1 | 144 | nos | 16 | ₹2,304 |
| 1.03 | Earth work in excavation in foundation ordinary soil as per pwd sor si no 251 | 324 | cum | 180 | ₹58,320 |
| 1.04 | cement concrete in 1:4:8 cement and coarse sand with approved stone ballast all as per sor si no 281 | 33.75 | cum | 6,720 | ₹2,26,800 |
| 1.05 | Walls (any thickness) including attached pilasters. Butteresses. Plinth and string courses etc. as per DSR No 5.9.2 | 720 | sqm | 613 | ₹4,41,360 |
| 1.06 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15°
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering,
finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from
natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources dsr 5.3 | 127.8 | cum | - | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level.
Mild steel and Medium Tensile steel bars as per dsr 5.22.1 | 100.32 | qtl | 7,798 | ₹7,82,295.36 |
| 1.08 | 12 mm cement plaster of mix 1:6 cement and c sand asper dsr 13.4.2 | 1 | Sqm | 1 | ₹1 |
| 1.09 | disposal of malwa or excavated earth cartage up to 3 .0 km 70% of item no 2 | 226.8 | cum | 143 | ₹32,432.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_2198205.xls
BOQ • 0.30 MB
56943.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].