| 1.00RETAINING WALL CONSTRUCTION | |||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 6 | each | 2,285.21 ₹13,711.26 | 2,300 ₹13,800 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 66.3 | cum | 239.87 ₹15,903.38 | 250 ₹16,575 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 16.57 | cum | 7,386.31 ₹1.2 L | 7,000 ₹1.2 L |
| 1.00 | OD432487/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental stone | 188.18 | cum | 1,597.65 ₹3.0 L | 1,500 ₹2.8 L |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 39 | sqm | 359.55 ₹14,022.45 | 380 ₹14,820 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.55 | cum | 9,276.48 ₹1.6 L | 9,000 ₹1.6 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,324.35 | kilogram | 104.68 ₹1.4 L | 88 ₹1.2 L |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 58.5 | cum | 296.52 ₹17,346.42 | 318 ₹18,603 |
| 2.00NAME BOARD | |||||
Tender Value
₹8.5 L
EMD Value
₹21,167
Closing Date
27 Feb 2026, 6:00 pmClosed
Assistant engineer
O/o Assistant Engineer,Marutharode Grama Panchayat
THIRUMUNDITHODU SAMRAKSHNAM
2026_LSGD_838077_1
ET5/AE/LSGD/MGP/25-26
Open Tender
Civil Works - Others
180 days
MARUTHARODE GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,167
Yes
3 Jun 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
RETAINING WALL CONSTRUCTION
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD432487/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental stone
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
NAME BOARD
OD472486/2025-2026:Supplyingand providing readymade Name board with all conveyance,labour and hire charges etccomplete using hollow tubeof size 80x40x1.4mm post,40x20x1.4mm outer frame,0.6mm thick iron sheet of size 90x60cm with two coat ofenamel painting over a coat ofprimer, lettering with suitablecolour and size, fixing the post inground with CC etc complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.47 MB
Tendernotice_2.pdf
PDF • 0.36 MB
Tendernotice_3.pdf
PDF • 0.28 MB
Tendernotice_4.pdf
PDF • 0.19 MB
Tendernotice_5.pdf
PDF • 0.31 MB
BOQ_1411668.xls
BOQ • 0.30 MB
1THIRUNIT.pdf
Tender Documents • 0.03 MB
1THIRUSBD.pdf
Tender Documents • 2.16 MB
Download all tender documents and submit your bid