Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L2₹9.6 LQualified Make: NA
Model: PRINCE ENTERPRISES 00 PROFESSORS COLONY UNNAMED ROAD BALLIA BALLIA UTTAR PRADESH 277001 | BALLIA | UTTAR PRADESH | 277001 | Make: NA
Model: PRINCE ENTERPRISES | L2 | Qualified | |
| 2 | Qualified Make: Aay-Kay Gold
Model: Aay-Kay Gold FRP-5 OPP CHAWLA MARBLES GOLDEN TRUST COLONY TIRLOK LEELA SAILI ROAD 978 GURDASPUR PUNJAB 145001 | PATHANKOT | PUNJAB | 145001 | Make: Aay-Kay Gold
Model: Aay-Kay Gold FRP-5 | - | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
12 Oct 2018, 9:00 amClosed
Fiber Reinforcement Plastic F R P Shelters Barrel Type Cabin For Five Men ( 3 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Configuration Curved panel type FRP shelter of size 4880 mm x 4880 mm to be from side entry chamber of size 2387 mm x 1220 mm and height of 2440 mm - As per Drawing Curved panel type FRP shelter of size 4880 mm x 4880 mm to be from side entry chamber of size 2387 mm x 1220 mm and height of 2440 mm - As per Drawing Scope of supply Erection of the shelters to be done by supplier - For which supplier will include erection charges in offer price. Erection of the shelters to be done by consignee himself - Supplier to furnish comprehensive erection manual including material list giving detailed instruction to erect the shelters at site - All panels to be assigned a serial number and to be referred to by a serial number in the erection manual
1/10 Erection of the shelters to be done by supplier - For which supplier will include erection charges in offer price. Transportations Freight charges Offer Prices are on free delivery at consignee site basis * Approval of Advance sample before bulk supply No advance sample * Time period for copletion of Erection work (If opted erection by supplier) Within 40 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work Within 20 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work
Within 30 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work
Within 40 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work
N.A Since Erection is by consignee himself. Suitability structural stability completness of structures
the structure is intended for use in Designed for - In wind condition of 150 km/Hr - Having 2 meters standing snow - With external temperature of Minus 50 Degree C and Internal temperature 20 degree C - and 200 kg/square meter uniformaly distributed load on floor - Shelter should be structurally stable and suitable to meet severity of these climatic condition. Designed for - In wind condition of 150 km/Hr - Having 2 meters standing snow - With external temperature of Minus 50 Degree C and Internal temperature 20 degree C - and 200 kg/square meter uniformaly distributed load on floor - Shelter should be structurally stable and suitable to meet severity of these climatic condition.
In wind condition of 55m/s - in Seismic zone V and ambient temprature range 0 degree C to (+) 50 degree C - Shelter should be structurally stable and suitable to 2/10 meet severity of these climatic condition. PANELS Size of each panel 1220 mm x 1220 mm 1220 mm x 1220 mm Weight of panel To be about 20 kg. To be about 20 kg. Lip and FRP sleeves Each panel have to be lip (except floor panel) and to be provided FRP sleeves through bolts. * Thickness of each panel To be 50 mm Rigid Phenolic in between To be 50 mm Rigid Phenolic in between
To be 50 mm PU Foam in between All holes on the panel To be aligned properly * Roof and Wall panels to be made of FRP laminates with rigid phenolic FRP laminates with rigid phenolic
FRP laminates with PU Foam Composition of each laminate (for Roof & Wall panels) Gel coat fire retardant base to be 0.15 mm to 0.20 mm thick - First layer of chopped strand mat to be 300 gm square meter - Woven Roving to be 360 gm sq. mtr - Second layer chopped strand mat to be 300 gm/sq. mtr. * Floor panels to be made of FRP laminates with PU Foam. FRP laminates with PU Foam. Floor panel finish To be chequered finish * Composition of each laminate (for Floor panels) Gel coat Fire retardant base to be 0.15 mm to 0.20 mm thick - First layer of chopped strand mat to be 450 gm/sq. mtr. - Woven Roving to be 600 gm/sq. mtr. - Second layer chopped strand mat to be 450 gm/sq. mtr. * Laying sequence of Moulding panels (a)Gel coat - (b)First layer of CSM (chopped strand mat) - (c)Woven Roving - (d)Second layer of CSM - (e)Insulation material as specified - (f)Repeat sequence as per (d) to (a) (a)Gel coat - (b)First layer of CSM (chopped strand mat) - (c)Woven Roving - (d)Second layer of CSM - (e)Insulation material as specified - (f)Repeat sequence as per (d) to (a) All panel Flanges to be moulded Monolithically with continuous * 3/10 reinforcement mats running through them. All joints of mats (if any) To be staggered but Flanges shall contain no joints. * Flanges thickness to be built up By four layers of CSM (chopped strand mat) and two layers of woven roving. * Specification of Flanges thickness built up Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr - Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr - Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr LAMINATES Minimum strength of laminates to be achieved Each laminate must have the strength characteristic such as P: sp. gravity - Tensile strength - Cross breaking strength - Compressive strength - Impact strength etc (Reinforcement in excess of those specified above may be used if required) * Soecific Gravity of each laminate To be 1.6 minimum. * Tensile strength (as per BS : 2782-76 method 320 E) To be 700 Kg/sq. cm minimum. * Cross breaking strength (as per BS:2782/76 Method 3040) To be 1500 kg/sq. cm minimum * Compressing strength (as per BS : 3987/86 To be 1750 kg/sq. cm minimum * Impact strength To be 1.5 kg.m * Flame Retardant property (as per BS : 3532-1990/IS : 6746-latest) Shall pass the requirement. * Glass content To be 35 % minimum. * PROPERTIES OF MATERIAL Polyester Resin Polyester used for shelter to be of class I - Water absorption of cast resin to be 25 mg maximum and to be Polyester used for shelter to be of class I - Water absorption of cast resin to be 25 mg maximum and to be 4/10 pass requirement of Type-E/Type in respect of Inflammability of cast resin as per BS : 3532-90/IS : 6746-latest pass requirement of Type-E/Type in respect of Inflammability of cast resin as per BS : 3532-90/IS : 6746-latest For bonding and insulation between FRP laminates Rigid Phenolic slabs to be used Rigid Phenolic slabs to be used
Rigid PU Foam slabs to be used Density of Rigid phenolic/PU Foam To be 36 kg/cu. mtr. minimum * Compressive strength of Rigid phenolic/PU Foam (as per BS : 3987/86 To be 2.5 kg/sq. cm to 6.7 kg/sq.cm To be 2.5 kg/sq. cm to 6.7 kg/sq.cm Thermal conductivity of Rigid phenolic/PU Foam at 10 deg C (as per BS : 4370 (Pt 2)/93 To be 0.017 Kcal/h/m to 0.022Kcal/h/m To be 0.017 Kcal/h/m to 0.022Kcal/h/m Flammability of Rigid Phenolic/PU Foam (as per ASTM 1692) To be Non-flammable To be Non-flammable Ignitability of Rigid Phenolic/PU Foam (asper BS : 476 Pt 5/87) To be of class P To be of class P Inter Panel Lining To be used suitable rubber gasket capable of withstanding temperature up to -50 deg C - No rubber lining to be used. * Gasket shore hardness To be 65 at -50 degree Celcius * Weight of Rubber gasket 415 gm/mtr. * Thickness of Rubber gasket 4 mm to 5 mm - to be continuous strip as far as possible - Two extra sheets of size 1mtr x 0.5 mtr to be provided with each shelter by seller. * BOLTS
NUTS and WASHER (duly galvanised) Nuts to be as per IS : 1363/latest (pt. 3) ISO4034/1999 - Bolts to be as per IS : 8822/latest - Washers to be as per IS : 2016/latest - Seller to * 5/10 be provide 10 % bolts nuts & washers extra. FITMENT and FIXTURE Number of Doors Two nos. (one for main entry and one for Living chamber) * Size of Living chamber 2000 mm x 750 mm * Locking arrangement Both the door have to be two-way drop bolt and in addition have a locking arrangement from outside. * Door closer Two torsion spring type door closers to be used on all doors. * Snow/Wind stopper To be provided in Entry door at bottom. * Door to be Fit in snugly That its seating becomes air tight and water proof. * Latching arrangement To be provided on main door to keep the door open. * Emergency exit door To be provided on side of wall of each type of FRP shelter. * Size of emergency exit door 750 mm x 750 mm * Spring hinges for emergency exit door To be used to open the door inward. * Neoprene beading (for emergency exit door) To be fixed to sides of the door to avoid water seeping into the shelter. * Number of Fixed windows 5 nos. glazed window (Two on either side of wall of Living chamber and one on roof of entry chamber) * Size of Fixed windows 600 mm x 450 mm * Windows to be integrally moulded With polycarbonate of 2 mm thick double glazing. * Longer side of Fixed windows To be parallel to the floor. * Number of Sliding windows 3 nos. (Two on back gable wall and One on front gable wall) - To be air tight and water proof. * 6/10 All sliding windows have to be Double polycarbonate 4 mm thick glazed shutters * Sliding windows to be provided With Locking arrangement and Aluminium channel. * Bukhari Opening 1 no. with asbestos lining of the main chamber to be provided. * Internal Dia of opening (for Bukhari opening) 127 mm * Cover for opening ( Bukhari opening) A moulded FRP cover to be provided. * Nozzle size of bukhari oil pipe To be of outer dia 6 mm. * Inserts To withstand high local stresses at attachment points bearing inserts to be provided. * Inserts to be of Metal duly tapped to take the screws * galvanised & Passivated inserts and split pin To be used in Panel and in 2 way drop bolt (latch) in door panel respectively. * ANCHORING Two integrally moulded FRP anchor points To be provided in each bay on either side of the shelter. * Anchoring to be done with 5000 mm long and 5 mm dia galvanised steel wire rope (SWR) * Turnbuckles To be provided for imparting tension. * All SWR slings Have to be thimbles and D-shackles for fixing. * Brackets Total of six brackets to be provided (Four in end bays and one each on gable end for holding down the shelter) * Each bracket to be capable of Taking one foundation board of size 400 mm x 25 mm dia with 90 mm x 90 mm x 3 mm thick plate fixed at its bottom with suitable hexagonal nut. * 7/10 Fixation of Brackets to the shelter To be done with Four bolts using metallic inserts. * Foundation bolt To be staggered. * MISCELLANEOUS Snow Scraper (to be provided with each shelter) ' T ' type snow remover of size 200 mm x 600 mm of Aluminium (To remove snow from roof) * Handle of snow scraper To be wooden with nuts and bolts. * Boot scraper and Metallic Door mat Box type boot scraper of size 250 mm x 250 mm x 200 mm made of MS Angle with plate at the bottom to be provided. * Cloth Line Two cloth lines with suitable fixation hook to be provided. * Clothes Pegs (rounded smooth edges) 19 heavy Pegs (16 in Living chamber and 3 in toilet chamber). * FRP Racks 3 nos. of size 650 mm x 200 mm to be provided in the living chamber on the gable end. * Jerrican Stand (FRP integrally moulded) To be provided on the outside wall of Entry chamber. * Bukhari pipe entry Metallic nozzle to be provided for the inlet of Bukhari pipe - Having arrangement for opening/closing from inside. * Electrical & Telephone connections Three pin heavy duty metallic sockets with cover (one for telephone and two 16A - 26A for electrical connection to be provided. * Floor (No supporting metal framework to be used) Recesses in the floor panel to be provided the bolts for joining the floor panels together. * Floor design To be such so as to facilitate fixing of bolts from top after laying the panel on the * 8/10 ground - No flip over floor construction is acceptable. Water Proofing Whole shelter to be fully waterproofed - to be achieved by providing overlapping lips in panels - No putty sealing compound to be used for sealing joints. * Tools (if erection by consignee himself) Erection tools including ratchet - spanner to be provided in a locked steel box for each shelter. * Fire Extinguishers 2 nos. of 1.2 kg capacity Halon type in each FRP shelter (one to be fixed in passage and another to be fixed in main Living shelter close to the door) * Fire Extinguishers to be mounted In matallic insert - the same to be moulded into panel suitably. * COLOUR & MARKING Colour of Interior White * Colour of Exterior As per Buyer's choice * All panels to be marked with Integrally moulded FRP marking as - Name of Firm - No. of shelters - No. of panels - year & month of manufacture. * Marking for matching & identification All panels marked on the sides with black paint for easy recognition of panel while laying in stacks assembly. * WARRANTY Warranty period 1-Year 1-Year
2-years
3-Years CERTIFICATION Test reports to be furnished to buyer's on demand YES * OEM of offered product is ISO 9001:2015 certified YES * OEM of offered product is ISO 14001:2015 certified YES * 9/10 OEM of offered product is ISO 18001:2007 certified YES * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Ajay Prakash Kainthola N 246429
8th bn itbp gauchar 3 45
684216
GEM/2018/B/96917
fiber reinforcement plastic f r p shelters barrel type Cabin for five men
45 days
Uttarakhand; Chamoli
PRODUCT
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Fiber Reinforcement Plastic F R P Shelters Barrel Type Cabin For Five Men ( 3 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Configuration Curved panel type FRP shelter of size 4880 mm x 4880 mm to be from side entry chamber of size 2387 mm x 1220 mm and height of 2440 mm - As per Drawing Curved panel type FRP shelter of size 4880 mm x 4880 mm to be from side entry chamber of size 2387 mm x 1220 mm and height of 2440 mm - As per Drawing Scope of supply Erection of the shelters to be done by supplier - For which supplier will include erection charges in offer price. Erection of the shelters to be done by consignee himself - Supplier to furnish comprehensive erection manual including material list giving detailed instruction to erect the shelters at site - All panels to be assigned a serial number and to be referred to by a serial number in the erection manual | - | - | - |
| 1/10 Erection of the shelters to be done by supplier - For which supplier will include erection charges in offer price. Transportations Freight charges Offer Prices are on free delivery at consignee site basis * Approval of Advance sample before bulk supply No advance sample * Time period for copletion of Erection work (If opted erection by supplier) Within 40 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work Within 20 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work | - | - | - |
| Within 30 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work | - | - | - |
| Within 40 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work | - | - | - |
| N.A Since Erection is by consignee himself. Suitability structural stability completness of structures | - | - | - |
| the structure is intended for use in Designed for - In wind condition of 150 km/Hr - Having 2 meters standing snow - With external temperature of Minus 50 Degree C and Internal temperature 20 degree C - and 200 kg/square meter uniformaly distributed load on floor - Shelter should be structurally stable and suitable to meet severity of these climatic condition. Designed for - In wind condition of 150 km/Hr - Having 2 meters standing snow - With external temperature of Minus 50 Degree C and Internal temperature 20 degree C - and 200 kg/square meter uniformaly distributed load on floor - Shelter should be structurally stable and suitable to meet severity of these climatic condition. | - | - | - |
| In wind condition of 55m/s - in Seismic zone V and ambient temprature range 0 degree C to (+) 50 degree C - Shelter should be structurally stable and suitable to 2/10 meet severity of these climatic condition. PANELS Size of each panel 1220 mm x 1220 mm 1220 mm x 1220 mm Weight of panel To be about 20 kg. To be about 20 kg. Lip and FRP sleeves Each panel have to be lip (except floor panel) and to be provided FRP sleeves through bolts. * Thickness of each panel To be 50 mm Rigid Phenolic in between To be 50 mm Rigid Phenolic in between | - | - | - |
| To be 50 mm PU Foam in between All holes on the panel To be aligned properly * Roof and Wall panels to be made of FRP laminates with rigid phenolic FRP laminates with rigid phenolic | - | - | - |
| FRP laminates with PU Foam Composition of each laminate (for Roof & Wall panels) Gel coat fire retardant base to be 0.15 mm to 0.20 mm thick - First layer of chopped strand mat to be 300 gm square meter - Woven Roving to be 360 gm sq. mtr - Second layer chopped strand mat to be 300 gm/sq. mtr. * Floor panels to be made of FRP laminates with PU Foam. FRP laminates with PU Foam. Floor panel finish To be chequered finish * Composition of each laminate (for Floor panels) Gel coat Fire retardant base to be 0.15 mm to 0.20 mm thick - First layer of chopped strand mat to be 450 gm/sq. mtr. - Woven Roving to be 600 gm/sq. mtr. - Second layer chopped strand mat to be 450 gm/sq. mtr. * Laying sequence of Moulding panels (a)Gel coat - (b)First layer of CSM (chopped strand mat) - (c)Woven Roving - (d)Second layer of CSM - (e)Insulation material as specified - (f)Repeat sequence as per (d) to (a) (a)Gel coat - (b)First layer of CSM (chopped strand mat) - (c)Woven Roving - (d)Second layer of CSM - (e)Insulation material as specified - (f)Repeat sequence as per (d) to (a) All panel Flanges to be moulded Monolithically with continuous * 3/10 reinforcement mats running through them. All joints of mats (if any) To be staggered but Flanges shall contain no joints. * Flanges thickness to be built up By four layers of CSM (chopped strand mat) and two layers of woven roving. * Specification of Flanges thickness built up Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr - Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr - Two layer CSM of 450 gm/sq. mtr each - One layer woven roving of 600 gm/sq. mtr LAMINATES Minimum strength of laminates to be achieved Each laminate must have the strength characteristic such as P: sp. gravity - Tensile strength - Cross breaking strength - Compressive strength - Impact strength etc (Reinforcement in excess of those specified above may be used if required) * Soecific Gravity of each laminate To be 1.6 minimum. * Tensile strength (as per BS : 2782-76 method 320 E) To be 700 Kg/sq. cm minimum. * Cross breaking strength (as per BS:2782/76 Method 3040) To be 1500 kg/sq. cm minimum * Compressing strength (as per BS : 3987/86 To be 1750 kg/sq. cm minimum * Impact strength To be 1.5 kg.m * Flame Retardant property (as per BS : 3532-1990/IS : 6746-latest) Shall pass the requirement. * Glass content To be 35 % minimum. * PROPERTIES OF MATERIAL Polyester Resin Polyester used for shelter to be of class I - Water absorption of cast resin to be 25 mg maximum and to be Polyester used for shelter to be of class I - Water absorption of cast resin to be 25 mg maximum and to be 4/10 pass requirement of Type-E/Type in respect of Inflammability of cast resin as per BS : 3532-90/IS : 6746-latest pass requirement of Type-E/Type in respect of Inflammability of cast resin as per BS : 3532-90/IS : 6746-latest For bonding and insulation between FRP laminates Rigid Phenolic slabs to be used Rigid Phenolic slabs to be used | - | - | - |
| Rigid PU Foam slabs to be used Density of Rigid phenolic/PU Foam To be 36 kg/cu. mtr. minimum * Compressive strength of Rigid phenolic/PU Foam (as per BS : 3987/86 To be 2.5 kg/sq. cm to 6.7 kg/sq.cm To be 2.5 kg/sq. cm to 6.7 kg/sq.cm Thermal conductivity of Rigid phenolic/PU Foam at 10 deg C (as per BS : 4370 (Pt 2)/93 To be 0.017 Kcal/h/m to 0.022Kcal/h/m To be 0.017 Kcal/h/m to 0.022Kcal/h/m Flammability of Rigid Phenolic/PU Foam (as per ASTM 1692) To be Non-flammable To be Non-flammable Ignitability of Rigid Phenolic/PU Foam (asper BS : 476 Pt 5/87) To be of class P To be of class P Inter Panel Lining To be used suitable rubber gasket capable of withstanding temperature up to -50 deg C - No rubber lining to be used. * Gasket shore hardness To be 65 at -50 degree Celcius * Weight of Rubber gasket 415 gm/mtr. * Thickness of Rubber gasket 4 mm to 5 mm - to be continuous strip as far as possible - Two extra sheets of size 1mtr x 0.5 mtr to be provided with each shelter by seller. * BOLTS | - | - | - |
| NUTS and WASHER (duly galvanised) Nuts to be as per IS : 1363/latest (pt. 3) ISO4034/1999 - Bolts to be as per IS : 8822/latest - Washers to be as per IS : 2016/latest - Seller to * 5/10 be provide 10 % bolts nuts & washers extra. FITMENT and FIXTURE Number of Doors Two nos. (one for main entry and one for Living chamber) * Size of Living chamber 2000 mm x 750 mm * Locking arrangement Both the door have to be two-way drop bolt and in addition have a locking arrangement from outside. * Door closer Two torsion spring type door closers to be used on all doors. * Snow/Wind stopper To be provided in Entry door at bottom. * Door to be Fit in snugly That its seating becomes air tight and water proof. * Latching arrangement To be provided on main door to keep the door open. * Emergency exit door To be provided on side of wall of each type of FRP shelter. * Size of emergency exit door 750 mm x 750 mm * Spring hinges for emergency exit door To be used to open the door inward. * Neoprene beading (for emergency exit door) To be fixed to sides of the door to avoid water seeping into the shelter. * Number of Fixed windows 5 nos. glazed window (Two on either side of wall of Living chamber and one on roof of entry chamber) * Size of Fixed windows 600 mm x 450 mm * Windows to be integrally moulded With polycarbonate of 2 mm thick double glazing. * Longer side of Fixed windows To be parallel to the floor. * Number of Sliding windows 3 nos. (Two on back gable wall and One on front gable wall) - To be air tight and water proof. * 6/10 All sliding windows have to be Double polycarbonate 4 mm thick glazed shutters * Sliding windows to be provided With Locking arrangement and Aluminium channel. * Bukhari Opening 1 no. with asbestos lining of the main chamber to be provided. * Internal Dia of opening (for Bukhari opening) 127 mm * Cover for opening ( Bukhari opening) A moulded FRP cover to be provided. * Nozzle size of bukhari oil pipe To be of outer dia 6 mm. * Inserts To withstand high local stresses at attachment points bearing inserts to be provided. * Inserts to be of Metal duly tapped to take the screws * galvanised & Passivated inserts and split pin To be used in Panel and in 2 way drop bolt (latch) in door panel respectively. * ANCHORING Two integrally moulded FRP anchor points To be provided in each bay on either side of the shelter. * Anchoring to be done with 5000 mm long and 5 mm dia galvanised steel wire rope (SWR) * Turnbuckles To be provided for imparting tension. * All SWR slings Have to be thimbles and D-shackles for fixing. * Brackets Total of six brackets to be provided (Four in end bays and one each on gable end for holding down the shelter) * Each bracket to be capable of Taking one foundation board of size 400 mm x 25 mm dia with 90 mm x 90 mm x 3 mm thick plate fixed at its bottom with suitable hexagonal nut. * 7/10 Fixation of Brackets to the shelter To be done with Four bolts using metallic inserts. * Foundation bolt To be staggered. * MISCELLANEOUS Snow Scraper (to be provided with each shelter) ' T ' type snow remover of size 200 mm x 600 mm of Aluminium (To remove snow from roof) * Handle of snow scraper To be wooden with nuts and bolts. * Boot scraper and Metallic Door mat Box type boot scraper of size 250 mm x 250 mm x 200 mm made of MS Angle with plate at the bottom to be provided. * Cloth Line Two cloth lines with suitable fixation hook to be provided. * Clothes Pegs (rounded smooth edges) 19 heavy Pegs (16 in Living chamber and 3 in toilet chamber). * FRP Racks 3 nos. of size 650 mm x 200 mm to be provided in the living chamber on the gable end. * Jerrican Stand (FRP integrally moulded) To be provided on the outside wall of Entry chamber. * Bukhari pipe entry Metallic nozzle to be provided for the inlet of Bukhari pipe - Having arrangement for opening/closing from inside. * Electrical & Telephone connections Three pin heavy duty metallic sockets with cover (one for telephone and two 16A - 26A for electrical connection to be provided. * Floor (No supporting metal framework to be used) Recesses in the floor panel to be provided the bolts for joining the floor panels together. * Floor design To be such so as to facilitate fixing of bolts from top after laying the panel on the * 8/10 ground - No flip over floor construction is acceptable. Water Proofing Whole shelter to be fully waterproofed - to be achieved by providing overlapping lips in panels - No putty sealing compound to be used for sealing joints. * Tools (if erection by consignee himself) Erection tools including ratchet - spanner to be provided in a locked steel box for each shelter. * Fire Extinguishers 2 nos. of 1.2 kg capacity Halon type in each FRP shelter (one to be fixed in passage and another to be fixed in main Living shelter close to the door) * Fire Extinguishers to be mounted In matallic insert - the same to be moulded into panel suitably. * COLOUR & MARKING Colour of Interior White * Colour of Exterior As per Buyer's choice * All panels to be marked with Integrally moulded FRP marking as - Name of Firm - No. of shelters - No. of panels - year & month of manufacture. * Marking for matching & identification All panels marked on the sides with black paint for easy recognition of panel while laying in stacks assembly. * WARRANTY Warranty period 1-Year 1-Year | - | - | - |
| 2-years | - | - | - |
| 3-Years CERTIFICATION Test reports to be furnished to buyer's on demand YES * OEM of offered product is ISO 9001:2015 certified YES * OEM of offered product is ISO 14001:2015 certified YES * 9/10 OEM of offered product is ISO 18001:2007 certified YES * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Ajay Prakash Kainthola N 246429 | - | - | - |
| 8th bn itbp gauchar 3 45 | - | - | - |
Exempted
12 Oct 2018
13 Oct 2018
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_684216.pdf
GEM_BID
termsCondition.pdf
OTHER
2657c7ca70287299b5181580fdb5a7ab.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .